Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install CB, wrought iron fence, modify lighting systems and HMA.

Closed
04-3J2604State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 14 hours ago

DEADLINE

in 8 days

General Info

Documents

1

Bid 04-3J2604: Install CB, wrought iron fence, modify lighting systems and HMA

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
04-Ala,CC-80, 680-5.9 /6.4, 16.9 /17.1   ***   ALAMEDA AND CONTRA COSTA COUNTIES IN BERKELEY AND PLEASANT HILL ON ROUTE 80 FROM UNIVERSITY AVENUE OVERCROSSING TO GILMAN STREET UNDERCROSSING AND ON ROUTE 680 FROM OAK PARK BOULEVARD OVERCROSSING TO CONTRA COSTA  BOULEVARD OVERCROSSING

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS