Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 20, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install Exterior Crane - Building 2454

Closed
W9124L-22-R-R009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Sill, OK, 73503, USA

Set-Aside

8A

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Sill
Contacts2 people available
OfficeFORT SILL, OK, 73503-0501, USA
Office AddressFORT SILL, OK, 73503-0501, USA

Full Description

Show more
The Mission and Installation Contracting Command (MICC) Fort Sill, Oklahoma is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the Directorate of Public Works activities. Based on the responses to this sources sought notice/market research, this requirement will be an 8(a) direct award. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. The Contractor shall provide support to the Directorate of Public Works. The applicable NAICS code for this requirement is 236220, Commercial and Institutional Building General Contractors. The Product Service Code is Z2LB, Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways. Interested parties are requested to submit a capabilities statement of no more than 2 (two) pages in length in Times New Roman font of not less than 10 pitch. The deadline for response to this request is no later than 2:00 p.m., CST, 26, May 2022. All responses under this Source of Sought Notice must be e-mailed to: Contract Specialist: Thomas M. Green, email thomas.m.green111.civ@army.mil and Contracting Officer: Lula M. Hill, lula.m.hill2.civ@army.mil. Disclaimer: This Source of Sought is for informational purposes only. This is not a - Request for Proposal (RFP). This does not constitute a solicitation and shall not be construed as a commitment by the government. Responses in any form are not offers and the government is under no obligation to award a contract as a result of this announcement. No funds are available to pay for preparation of responses to this announcement. Any information submitted by respondents to this technical description is strictly voluntary. Responses will not be returned to the responder. Not responding to this notice does not preclude participation in any future Request for Quote (RFQ) or Invitation for Bid (IFB) or RFP, if any are issued. Provide a statement including current 8(a) status and company profile to include number of employees, annual revenue history, office locations, DUNs number and CAGE code, etc. Respondents to this notice also must indicate whether they qualify as a Small, Small Disadvantaged, Women-Owned, HUBZone, or Service Disabled Veteran-Owned Small Business Concern. Under this acquisition, MICC is requiring a project that will provide the labor, equipment, and materials to install exterior crane at building 2454 at Fort Sill, OK. The contractor will need to provide pre-engineered metal building with 10 ton single girder top running overhead bridge crane, pier foundations and electrical system in accordance with contract documents. a. Crane and Hoist shall have a minimum capacity of 10 tons. b. Hoist shall have a minimum hook (lift) height of 20 feet. c. Crane shall have a minimum bridge span (between rails) of 24 feet. d. Crane and Hoist system shall be pendant controlled. e. Pre-engineered Metal Building shall have a minimum length of 160 feet and minimum width of 24 feet, as required to provide adequate clearances for bridge rail supports. Support columns shall be located to maintain access to all bay openings in the building. f. Pre-engineered Metal Building shall be located as to clear existing building foundations and existing utilities. Approximate locations are shown on contract drawings. g. Pre-engineered Metal Building shall have roof gutters and downspouts. h. Pre-engineered building shall have 4-0 high wall screening installed at the top of the building from the eave level down, for the full perimeter of the building in order to provide protection of the hoist and rails from wind-blown debris and rain. Screening walls shall not extend below the bottom of the crane rail supports. i. Pre-engineered building shall have bird netting, or other approved bird deterrent system, installed on the underside of the roof framing in order to deter nesting birds. Netting shall be installed to be clear of all moving components and electrical components. j. Buildings: 1) All steel connections shall be standard AISC welded or bolted connections. 2) Structural steel shall conform to ASTM A36, except tubing columns shall conform to ASTM A500, Grade B, FY=46 KSI. All steel components shall be factory prepared and primed prior to delivery to the site. 3) Roof shall be a minimum 24 gauge. Roof structure shall include all framing components of the appropriate size and spacing to meet the required design loads. Roof covering shall be factory finished corrugated metal panels. Roof covering shall have a wind up-lift resistance rating of Class 90. 4) The Contracting Officer shall select exterior colors and finishes from the manufacturer's standard colors. 5) Buildings and components shall be designed to withstand the following loads. a) Roof live load: 20 pounds per square foot (psf) uniform load and a concentrated load of 250 pounds uniformly distributed over 2 feet square located so as to produce the maximum stress conditions. b) Seismic design shall comply with IBC 2021, UFC 3-301-01 and ASCE 7-22. c) Dead loads: Actual weight of components. d) Wind loading shall comply with the American Society of Civil Engineers Standard ASCE 7-22, Minimum Design Loads for Buildings and Other Structures. k. Foundations: 1) Pier Foundations shall be in accordance with IBC 2021 and ACI 318. l. Electrical: 1) Contractor shall provide new certified electrical drawings in accordance with the requirements of the latest edition of NFPA 70, NFPA 780, ANSI C2, Electrical New Work and specification Section 16A, ELECTRICAL REQUIREMENTS. The new certified electrical drawings shall include electrical site plan, lighting plan, power plan, electrical riser diagram, lightning protection system plan, schedules and details. 2) Contractor shall provide lighting calculations, short circuit calculations, load calculations and voltage drop calculations. 25% future growth shall be used in load calculations. 3) Certified documents prepared by the Contractor's electrical engineer for this project shall be a complete set of construction plans, specifications and engineering calculations and analysis, which will be reviewed and approved by the government before the start of construction activities. m. ALL COMPONENTS SHALL BE OF THE OUTDOOR TYPE. n. Certified shop drawings and documents prepared by the Contractor shall be a complete set of construction plans, specifications and engineering calculations and analysis, which will be reviewed and approved by the government before the start of construction activities. o. Contractor shall perform all testing, surveying, and staking necessary to complete design and construction. 2. Electrical New Work: a. Contractor shall provide a 10 ton bridge crane in the new Pre-engineered Metal Building next to Building 2454. The 10 ton bridge crane shall be 208V, 3-phase. The control voltage for the 10 ton bridge crane shall be 120V. All crane controls shall be weatherproof. b. Contractor shall provide a new pad-mounted transformer to supply 120/208V, 3-phase, 4-wire, 60Hz secondary power to all new loads in the new Pre-engineered Metal Building next to Building 2454. c. Contractor shall provide a new riser wood pole for providing power from existing primary lines to the new pad-mounted transformer. d. Contractor shall provide a new electronic pulse meter. e. Contractor shall provide new lighting fixtures in the new Pre-engineered Metal Building. New lighting fixtures shall be controlled by switches. f. Contractor shall provide new security lighting fixtures at the new Pre-engineered Metal Building. New security lighting fixtures shall be controlled by photoelectric control. g. Contractor shall provide a new weatherproof GFCI duplex receptacle at each column of the new Pre-engineered Metal Building. h. Contractor shall provide new arresters, fused cutouts, switches, panelboards, circuit breakers, wires, conduits, junction boxes and other associated items as required to provide power to new equipment, new lighting fixtures and new receptacles. i. Contractor shall provide a new lightning protection system for the new Pre-engineered Metal Building. j. Contractor shall saw cut, remove and replace existing pavement with new pavement as required for installing underground circuits, ground rods and underground bare copper conductors of the new lightning protection system. New pavement shall match existing pavement. k. Contractor shall provide certified electrical drawings, all required plant, labor, equipment, and materials to complete all work in accordance with Electrical New Work, specifications and drawings. Special Restrictions or geographical limitations of the requirement: A 150 mile radius of Lawton, Oklahoma.

More opportunities from Department Of Defense → W6QM Micc-Ft Sill

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS