Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation Backflow Preventers

Closed
W50S6M26QA012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under a MACC multiple-award IDIQ contract by the Department of Homeland Security Immigration and Customs Enforcement, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project has an estimated magnitude between 4.0 million and 4.5 million dollars and a period of performance not to exceed 365 days from the date of award. The scope of work includes the installation of aluminum awnings at the shipping and receiving dock and Fiske Range, turf replacement at Fiske Range, the demolition and site restoration of Building 2294, gutter and drainage improvements at Building 234, and the replacement and maintenance of commercial HVAC systems across Buildings 2949, 234, 1836, and 19. Additionally, the contractor will perform general facility improvements for Building 301 and the DAGr Team facility. Award will be based solely on the lowest total evaluated price, though the government will also evaluate the offeror's technical approach, design resources, and the validity of their methodology. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided CSI division template. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave provisions. Key administrative requirements include the submission of payment requests via the Invoice Processing Platform accompanied by certified payroll, and the provision of performance and payment bonds. Final inspection and technical assistance will be managed by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 13 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace the 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes the complete removal and replacement of the existing motor, electrical hookup, system testing, commissioning, and the provision of onsite training and maintenance manuals for facility personnel. Bidders must conduct a physical site visit and sign the attendance roster to be eligible for award. The project requires the contractor to handle all permits, fees, and the removal of all construction debris and packaging from the site. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to the designated points of contact. Submissions must include a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and a bid bond guarantee from a surety company with at least an A- rating. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Award decisions will be based on overall best value. The contract is subject to federal regulations, including the Davis-Bacon Act for prevailing wages in Davis County, Utah, and the Contract Work Hours and Safety Standards Act. Compliance with OSHA requirements and federal, state, and local codes is mandatory. Selected contractors must provide a 12-digit Unique Entity ID (UEI) and a 9-digit Tax ID via the MTC Supplier Self-Certification form. Payment will be processed through pay applications using AIA G702 and G703 forms based on a submitted Schedule of Values. Performance and payment bonds must be submitted within five business days of receiving an Intent to Award letter.
Management & Training Corporation

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. The project is structured in five phases: preparation and environmental safety, demolition and removal, installation of an OEM-specified compressor and related components, system testing and commissioning, and final closeout. The contractor must ensure full restoration of cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within 30 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedules. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, along with performance and payment bonds from an A-rated surety company. Submission requirements include a signed bid sheet, a detailed bid breakout, and verification of a physical site visit. Contractors must comply with Davis-Bacon Act wage determinations for Washoe County and provide self-certification of their business size and socioeconomic category per FAR 52.219-8. Final payment is contingent upon the submission of a Notice of Final Completion, certified payroll reports, and two sets of operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking bids for a subcontracting opportunity to replace a failing 246-ton air-cooled chiller at the North Texas Job Corps Center, specifically in Building 214/215 located in McKinney, Texas. The scope of work includes the demolition and disposal of the existing unit and the installation and startup of a like-kind, similar model replacement. Additionally, the project requires the installation of a JACE 9000 central integration point for building automation controls to manage the chiller, pumps, boiler, and four multi-zone air handling units. The contractor must also perform cleaning and inspection of the air handling units, replace belts, install four 3-way control valves, and replace three of the four air handler VFDs. Bids must be submitted by September 18, 2026, and quotes must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Primary points of contact for the project are Stacy Smith and Roy Henderson.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 10 hours ago

DEADLINE

in 10 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
Adams & Associates, Inc., operating for the U.S. Department of Labor, is soliciting a single lump sum contract to replace HVAC systems at the ABL Dormitory within the Atterbury Job Corps Center in Indiana. The project involves replacing existing R-22 Bryant gas-fired furnaces and condensing units with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The scope includes the installation of compatible coils and the reuse of existing electrical disconnects, ductwork, and thermostat wiring. All recovered refrigerant must be labeled and left on-site. Eligible bidders must be registered in SAM.gov with a valid Unique Entity ID and hold a valid Indiana Contractor's License. A mandatory site visit is scheduled for September 23, 2026, with final proposals due by October 5, 2026. Award decisions will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and guarantee all workmanship for one year. Payment terms are Net 30, contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens. Compliance with EPA, OSHA, and Davis-Bacon Act wage determinations is required.
Adams & Associates, Inc.

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract pertains to the installation of two ZURN 10-inch Model 375DA backflow preventers at Building 700, Civil Engineering Classroom, located at 5401 East Lake Blvd, Birmingham, Alabama, under the solicitation number W50S6M26QA012. This is a Firm-Fixed Price purchase order issued as a combined solicitation under a total small business set-aside, exclusively available to Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business, Women-Owned Small Business, Economically Disadvantaged Women-Owned Small Business, and 8(a) concerns, with a NAICS code of 238220. The total performance period is 120 days, with the delivery schedule running from August 4, 2026, to December 2, 2026. Contractors must perform a site assessment of existing backflow assemblies adjacent to B130, safely shut down and remove two existing units, install the new ZURN assemblies with all required fittings, supports, and insulation, ensure proper accessibility for future maintenance, restore water service, and complete initial testing using certified equipment while providing official test reports and affixing test tags. All work must comply with Unified Facilities Criteria, ANGETL, the ANG Handbook, AF Form 7115, ANG Form 920, and ANGH 32-1084, and adherence to U.S. Air Force Quality Assurance and Quality Control procedures is mandatory. All materials must be approved prior to installation and documented using AF Form 3000. Site access is restricted and requires prior coordination; a mandatory site visit is scheduled for July 7, 2026, at 10 AM, with all participants required to arrive 30 minutes early to obtain base entry. Contractors must comply with Department of Defense security protocols including personal identity verification, background checks processed by the installation’s Security Forces, and completion of Anti-Terrorism Awareness Level I training within 45 days of contract start date. All work is subject to government inspection at any time prior to acceptance, with acceptance deemed automatic if not rejected within 60 days of delivery. Payment will be processed monthly in arrears through the Wide Area Workflow system, using designated DoDAAC codes F87700, W50S6M, and F6E3CE, and contractors must be registered

General Info

Install two ZURN 10-inch backflow assemblies at Building 700 by July 7, 2026, under Air Force and local code compliance.

Agency

Department Of Defense → W7MT Uspfo Activity Alang 117View Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Birmingham, AL, 35217, USA

Set-Aside

SBA

Documents

(4)

RFI Questions - Backflow Preventers

DOCXq-and-a

SOW+Install+Black+Flow+Prevention_.docx

DOCX

Zurn Wilkins Model 375DA Reduced Pressure Detector Backflow Prevention Assembly Specifications

PDFspecifications

Solicitation W50S6M26QA012 Professional Appearance Backflow Preventers Installation

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MT Uspfo Activity Alang 117
Contacts2 people available
OfficeBIRMINGHAM, AL, 35217-3595, USA
Organization / Agency
Department Of Defense → W7MT Uspfo Activity Alang 117
View Agency Profile
Office AddressBIRMINGHAM, AL, 35217-3595, USA

Full Description

Show more

RFI Answers 14 July 20226


Installation ZURN 10” Model 375DA, Backflow Preventers 


Site Visit for this project will be 7 July 2026 at 10AM


Address: 


5401 East Lake Blvd Birmingham AL 35217
Bldg. 700 Civil Engineering Classroom



Arrive at least 30 minutes prior to get access to the base.


Part 1 – GENERAL


1.1 Project Identification


1.1.1 The General Provisions of the Contract, including General and Supplementary Conditions and General Requirements (if any), apply to all work specified in this document.


1.2 Scope of Work


1.2.1 General Description


The contractor will provide all labor, materials, equipment, and supervision necessary to complete the following tasks:


2.1 Site Assessment


  • Inspect existing backflow prevention assemblies and surrounding piping adjacent to B130.
  • Verify system shutoff points and confirm compatibility of replacement units.
  • Identify any code compliance issues requiring correction.

2.2 Removal of Existing Backflow Preventers


  • Safely shut down water supply to affected lines.
  • Remove two existing backflow prevention assemblies.
  • Dispose of old units in accordance with local regulations.

2.3 Installation of New Backflow Prevention Assemblies


  • Furnish and install two new backflow prevention assemblies of the specified type (ZURN 10” Model 375DA, please attachment 1 for specs and details).
  • Install all necessary fittings, valves, supports, and insulation.
  • Ensure proper orientation, clearance, and accessibility for future testing and maintenance.
  • Restore water service and verify system integrity.

2.4 Testing and Certification


  • Perform initial testing of both assemblies using certified backflow testing equipment.
  • Provide official test reports as required by local water authority.
  • Affix test tags to each device.

1.6 Site Cleanup


  • Thoroughly clean the work area of dust, dirt, and debris.
  • Restore the area to its original condition.
  • Follow ANGETL, ANG Handbook, and Unified Facilities Criteria throughout the project.
  • Notify the Contracting Officer immediately if work outside the scope is requested. No additional work shall begin without written authorization.
  • Cost increases beyond the original budget estimate will not justify additional fees unless caused by an approved scope change.

1.7 Contract Responsibilities


The contractor shall:


  • Contract directly with the Contracting Officer.
  • Provide and pay for all labor, materials, equipment, tools, and machinery.
  • Issue all required notices and comply with all applicable codes, ordinances, and regulations.
  • Notify the Contracting Officer immediately if work outside the scope is requested. No additional work shall begin without written authorization.
  • Cost increases beyond the original budget estimate will not justify additional fees unless caused by an approved scope change.
  • Notify the Contracting Officer in writing of any observed variances between contract documents and legal requirements.
  • Assume responsibility for work is performed contrary to requirements if no notice is provided.
  • Accept modifications to contract documents required due to legal requirements.
  • Maintain strict discipline and good order among employees; do not employ unfit or unskilled personnel.
  • Provide all required submittals (shop drawings, catalog cuts, brochures, test reports, schedules, estimates, correspondence) in a timely manner.

1.8 Submittals


  • All materials must be approved prior to installation.
  • No work may begin until it is reviewed with the Contracting Officer.
  • Any deviations must be reported to the Contractor and Contracting Officer.
  • The contractor is responsible for full compliance with this SOW.
  • Milestones and deliverables must be submitted prior to mobilization.

Part 2 – PRODUCT SUBMITTAL


2.1 Construction Materials


  • Contractor shall use AF Form 3000 to document all provided materials.
  • Contractor shall, review all materials to determine acceptability for government use.

Part 3 – EXECUTION


3.1 Regulatory Guidance


Applicable regulatory documents include:


  • Unified Facilities Criteria (UFC)
  • ANG Form 920 Report
  • AF Form 7115 Real Property Report
  • ANGH 32‑1084 (27 Jan 2015) Space Authorization

The Contracting Officer Representative will provide all known regulations, standards, and directives.


Part 4 – QUALITY ASSURANCE


  • Contractor shall follow U.S. Air Force standard Quality Assurance (QA) and Quality Control (QC) procedures.
  • Contractor shall implement documented processes for testing, inspection, and verification of all deliverables.

Part 6 – MISCELLANEOUS


  • Insurance requirements apply as specified in the contract.
  • Payment will be made monthly in arrears through the Government’s Wide Area Workflow (WAWF) system.
  • Contractor must complete required forms for all hazardous materials brought into the installation and for all waste generated.

Part 7 – ANTI‑TERRORISM / OPERATIONS SECURITY


7.1 Access and Security Requirements


  • Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force
  • For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations


  • Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computerbased training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ aces/page/login/Login. Seam. For those without a CAC, select "Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative

PERFORMANCE PERIOD


The total performance period for this contract is 120 days.

More opportunities from Department Of Defense → W7MT Uspfo Activity Alang 117

Same awarding agency

NAICS: 238220
New
Federal
117 Sewer Pipe Realignment
Solicitation # W50S6M26QA014
The 117th Air Refueling Wing at Sumpter Smith Joint National Guard Base in Birmingham, Alabama, has issued a solicitation for the 117 Sewer Pipe Realignment project. This requirement is a total small business set-aside for non-personal services involving the full inspection, cleaning, and rehabilitation of existing sewer piping systems within six specific facilities. The scope of work includes approximately 1,000 linear feet of 4-inch ductile iron pipe. The contractor is responsible for providing all personnel, equipment, and supplies to perform camera scoping assessments, mechanical cleaning, and the installation of an approved spray-in-place epoxy or polymer lining system, followed by post-lining testing and comprehensive documentation. The government intends to award a Firm-Fixed-Price contract to the responsible vendor providing the best value, determined through an evaluation of technical capability, past performance, and price. The combined weight of technical and past performance factors is approximately equal to the price factor. The total period of performance is 120 days, beginning on September 30, 2026, and ending on January 28, 2027. Offers must be submitted electronically to the designated points of contact no later than the extended deadline of September 15, 2026, at 10:00 AM CDT. A complete submission must include a signed SF 1449, a completed CLIN pricing schedule, required representations and certifications via SAM.gov, two to three past performance references, and acknowledgement of all amendments.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS