Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Pennsylvania was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation of 24" HDPE Storm Pipe

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Berks County in Pennsylvania is seeking a subcontractor for the installation of 353 linear feet of 24 inch HDPE storm pipe. The scope of work includes all necessary bedding, backfill, joint fusion, and testing to ensure proper installation. This project falls under NAICS code 237110 for heavy and civil engineering construction. The opportunity was posted on July 24, 2025, and requires responses to be submitted by August 22, 2025, at 6:00 PM. Performance of the work will take place within Berks County.

General Info

Berks County seeks a subcontractor to install 353 feet of HDPE storm pipe.

Place of Performance

Berks County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of 308825.002.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fleetwood Borough Community Pool Restroom Building and Site Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Berks County
ContactsNo contacts available
OfficeN/A
Organization / AgencyPennsylvania → Berks County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install 353 linear feet of 24" HDPE storm pipe with proper bedding, backfill, joint fusion, and testing.

More opportunities from Pennsylvania → Berks County

Same awarding agency

NAICS: 236220
SLED
Site Civil Improvements and Building Safety Upgrades
Solicitation # 4644.029
The Township of Spring in Berks County is soliciting bids for Site Civil Improvements and Building Safety Upgrades for its Police Department under project number 4644.029. The project is divided into two primary contracts: Contract No. 1 for General Construction and Contract No. 2 for Mechanical Construction. General construction includes ballistic security upgrades to the front entrance, the installation of an exterior electronic billboard, full perimeter foundation waterproofing, epoxy injection to mitigate groundwater, and comprehensive site civil improvements such as drainage piping, new sidewalks, and pavement restoration. Mechanical work focuses on HVAC upgrades, including ductwork and diffuser adjustments. Bids must be submitted electronically via the PennBid Program by 2:00 p.m. on December 2, 2026, and attendance at a mandatory pre-bid conference on November 18, 2026, is required for eligibility. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a lump sum pricing structure and unit prices for additional work. Key requirements include compliance with the Pennsylvania Prevailing Wage Act, the Public Works Employment Verification Act, and the use of American-made steel. Security is a priority, requiring criminal background checks for all personnel working inside the building. Contractors must provide performance and payment bonds and adhere to OSHA safety standards for excavations. Deliverables include a progress schedule, a schedule of values, and testing reports submitted within 48 hours of completion. Payment for progress applications is due thirty days after the application is presented with the engineer's recommendation.
Commercial and Institutional Building Construction

POSTED

8 days ago

DEADLINE

in 15 days
View Details
NAICS: 237990
SLED
Contract 26-2 Furnace Creek Tank Rehabilitation
Solicitation # 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, the Furnace Creek Tank Rehabilitation in Berks County, Pennsylvania. The project involves the comprehensive rehabilitation of a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The primary scope of work includes interior and exterior painting, foundation joint and crack repair, and incidental weld repairs. Following an addendum, the scope was expanded to include metals rehabilitation tasks such as installing a riser with drilled holes to serve as a static mixer, replacing the tank ladder and roof vent, installing a new 30-inch manway and safety cables, and reconfiguring the overflow discharge with an air gap, duckbill check valve, reducer, and flapper valve. The contract has a performance period of 150 days from the Notice to Proceed to substantial completion. Bids must be submitted electronically via PennBid by 2:00 PM on November 19, 2026, and must include a bid bond or certified check for 10 percent of the bid price. Award will be made to the apparent low bidder based on responsiveness and qualifications, including a review of the five most recent similar projects and financial standing. The project is funded through a Penn VEST loan and is subject to Davis-Bacon Wage Rates, the Build America, Buy America Act, and American Iron and Steel requirements. A third-party paint inspector will oversee the coating system, and all materials must be delivered in original packaging and stored according to manufacturer specifications.
Other Heavy and Civil Engineering Construction

POSTED

19 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS