This Solicitation opportunity from North Carolina was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Integrated Water and Wastewater Master Planning, Engineering, and Digital Modeling Services
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Brunswick County is seeking qualified engineering, environmental, and water resource firms to develop a comprehensive Water and Wastewater Integrated Master Plan that spans 20 years. The project involves consolidating existing separate water and wastewater master plans into a unified strategic framework to ensure the County’s infrastructure can meet both current demands and future growth. Key components include professional engineering, design, surveying, project management, and digital master planning. The scope emphasizes updating and calibrating hydraulic and wastewater models using GIS data to reflect current conditions and projected growth, as well as creating an interactive digital platform to facilitate real-time planning and decision-making by County staff. The final deliverable will be an integrated plan that prioritizes system improvements, addresses peak demand scenarios, and provides a flexible, long-term roadmap for infrastructure development, operation, and maintenance. The contract, with an estimated value between $500,000 and $2,000,000, is part of a solicitation process initiated by Brunswick County, North Carolina, with a response deadline of October 23, 2025. The selected firm will negotiate a lump sum agreement to deliver detailed technical and strategic planning services, including the integration of hydraulic models and GIS data, to support the County’s infrastructure growth and operational needs. The project aims to equip Brunswick County with a forward-looking, interactive digital master plan that will serve as a vital tool for managing water and wastewater systems efficiently over the next two decades, accommodating growth, peak demands, and system upgrades in a coordinated and strategic manner.
General Info
Agency
Place of Performance
NC, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The primary goal of this Master Plan is to update, build upon, and integrate the separate Water and Wastewater master plans into one combined Integrated Master Plan, and to identify strategies to ensure the County’s water treatment, distribution, wastewater treatment, and collection systems can meet existing and future infrastructure requirements. The project is to develop a Master Plan that enables the County to strategically plan and budget for the future operation, maintenance, and capital improvements necessary to ensure that the County’s water supply, water treatment, distribution systems, wastewater treatment, and collection systems can meet all existing and future supply and infrastructure demands. This Master Plan shall provide long-range planning for a 20-year period. In addition, the project shall include working with the County’s potable water system hydraulic model, wastewater model, and GIS data to update and calibrate the model to reflect current conditions as well as future conditions, growth rates, and areas of anticipated concentrated growth. The Master Plan shall include a digital master plan that will be utilized by County staff as an interactive tool for review and planning considerations to facilitate changes that will occur from the time this Master Plan is developed. The final output will result in an Integrated Water and Wastewater Master Plan that accommodates anticipated growth, addresses peak demand conditions, identifies future water and wastewater system requirements for short-term, mid-term, and long-term growth, identifies and prioritizes system improvement projects over a 20-year period, and allows for interactivity from County staff to make real-time adjustments within a digital platform.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
