Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Mississippi was posted on January 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Interior Finishes (Drywall, Painting, Flooring)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238390
New
Federal
Springdale JCC – Gymnasium Foundation Waterproofing
Solicitation # springdale-jcc-gymnasium-foundation-waterproofing
The Career Systems Development Corporation is seeking quotes for gymnasium foundation waterproofing at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to mitigate groundwater seepage and excessive humidity through a comprehensive scope of work that includes excavation, the installation of a minimum 24-inch high waterproof membrane on the foundation perimeter, and the implementation of a complete sump pump system with associated drainage pipes, liners, and alarms. Additionally, the contractor will be responsible for installing discharge lines, dedicated electrical outlets for pumps and dehumidifiers, and performing hydrojetting of existing drain lines. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. All work must comply with the Davis-Bacon Act, specifically Wage Determination OR20260100, R.1, and contractors must provide a valid Oregon CCB contractor's license number. Quotes must be itemized by parts and labor and remain valid for 90 days from the closing date of December 11, 2026. For projects valued at $100,000 or more, payment and performance bonds are required upon award. The successful contractor must provide a minimum 2-year materials and workmanship warranty along with appropriate manufacturer warranties. Quotes for unit replacement must include all necessary support equipment, such as dumpsters, temporary toilets, and perimeter security.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This subcontract for interior finishes involves the installation of drywall, painting, and various flooring materials including carpet, tile, and vinyl, as detailed in the architectural drawings for an interior renovation. The project is managed by the Mississippi Procurement Technical Assistance Program and will be performed in University. The solicitation was posted on January 23, 2026, with a response deadline of February 26, 2026. The contract is categorized under NAICS code 238390 and does not have a specified set-aside status.

General Info

Documents

This scope was carved out of 1256.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Pre-Bid Conference for Facilities Management Building Project February 12, 2026

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Springdale JCC – Gymnasium Foundation WaterproofingOpen now, due in 17 days
  • Overhead Door OverhaulOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMississippi Procurement Technical Assistance Program
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of drywall, painting, and flooring (carpet, tile, vinyl) as specified in architectural drawings for interior renovation.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS