Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Interior Reconfiguration & Finishes

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Interior Reconfiguration and Finishes subcontract involves performing interior demolition and reconstruction for prime contractors at the City Hall in Springfield, Oregon. The scope of work includes framing, drywall, painting, flooring, and millwork installation to deliver renovated office interiors. All work must strictly adhere to the 2010 ADA Standards for accessibility. This opportunity is managed by the Oregon Development and Public Works Community Development agency under NAICS code 236220. The project was posted on October 5, 2026, with a response deadline set for October 29, 2026.

General Info

Interior reconfiguration and finishes subcontract for Springfield City Hall, due October 29, 2026.

Documents

This scope was carved out of S4056.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CM/GC SERVICES FOR THE CITY HALL DEFERRED MAINTENANCE & QU

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Development & Public Works - Community Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs interior demolition and reconstruction for prime contractors on City of Springfield City Hall projects. Executes framing, drywall, painting, flooring, and millwork installation. Must comply with 2010 ADA Standards for accessibility. Delivers renovated, ADA-compliant office interiors.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
27-020-LH Commercial Storage Building (11/19/26) (RFB)
Solicitation # 27-020-LH
Macon-Bibb County Board of Commissioners is soliciting sealed bids for the construction and installation of a commercial storage building for the Vehicle Maintenance Department. The project requires a qualified contractor to provide all labor, materials, and equipment to install a 50 foot wide by 170 foot long by 20 foot high building. Key technical specifications include the pouring of a 12 inch reinforced concrete slab with 4000psi fiber, 24 inch by 24 inch footers, and a 10mil vapor barrier. The contractor is responsible for all delivery, offloading, and installation in accordance with manufacturer specifications, building codes, and OSHA standards. Bids must be submitted as one original and one flash drive by 12:00 PM on November 19, 2026. Required documentation includes bidder qualifications, a list of subcontractors, minority participation goals, financial and legal stability statements, and an E-Verify affidavit. The county encourages participation from Minority, Women-Owned, and Disadvantaged Business Enterprises and may award contracts to local businesses if their bid is within 5 percent of the lowest responsive bid. Award decisions will be based on the best interest of the county, considering price, prior experience, and the usefulness of the provided features. The successful contractor must maintain a Builder's Risk insurance policy equal to 100 percent of the contract sum and comply with the Georgia Open Records Act.
Macon Bibb County Board of Commissioners

POSTED

about 13 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price construction effort focused on the comprehensive interior modernization of training facilities. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution systems, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to improve HVAC efficiency. The project also requires the installation of new signage and the correction of plumbing deficiencies. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, evaluating price reasonableness alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict regulatory standards, including ADA accessibility guidelines, Buy American requirements, and Davis-Bacon wage determinations. Proposals must be submitted electronically in PDF and Excel formats to the contracting officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the comprehensive repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The project scope is divided into two primary exhibit line items: the renovation of Building 575 and the removal and replacement of paving. The renovation includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work encompasses electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements including drainage, water, sanitary, and storm system repairs, as well as hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars. The contract is governed by several federal regulations, including the Davis-Bacon Act, the Buy American Act, and ADA accessibility guidelines. Key administrative requirements include the use of Wide Area Work Flow for monthly invoicing and the submission of a final release and sea transportation certification per DFARS 252.247.7023. Quality assurance is managed through a QC Manager who must certify that all work complies with contract drawings and specifications. Depending on the final proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. Technical standards for the project include MIL-STD-101 for piping identification and IESNA LM-79 and LM-80 for LED lighting testing.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 23, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must provide proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must demonstrate the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to include proof of these specific efforts within the bid package will result in the proposal being deemed non-responsive. Documentation of general DBE outreach, such as emails and call logs, may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 13 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs along with vanity and cabinet replacement. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. This is an SBA set-aside opportunity open to Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on Best Value, evaluated on a 100-point scale covering price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of conformity with local wage rate decisions. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30, and the contractor must provide a one-year guarantee of workmanship and applicable manufacturer warranties.
Grafton Job Corps

POSTED

about 13 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Oregon → Development & Public Works - Community Development

Same awarding agency

NAICS: 238110
SLED
CITY HALL SOUTH STAIRS CONCRETE REPAIR
Solicitation # S4259
The City of Springfield, Oregon, is soliciting lump sum bids for Project P11026, which involves the concrete repair and restoration of the South Entrance stairs and associated concrete areas at Springfield City Hall. As expanded by Addendum 1, the scope of work now also includes the Northwest Entry stairs. The project requires the contractor to secure the site, remove deteriorated concrete, perform structural patching, and apply a two-part epoxy coating for sealing and protection. All work must be performed in accordance with the 2024 Oregon Standard Specifications for Construction and specific manufacturer requirements, while maintaining safe pedestrian access and completing final cleanup. Bids are due by October 27, 2026, and must be submitted as a total lump sum. To be considered responsive, bidders must provide a bid guarantee of 10 percent of the total bid amount via bid bond, cash, or certified check, and must comply with state prevailing wage rates. Evaluation is based on responsiveness, financial capacity, and price reasonableness, with the City reserving the right to reject bids that deviate significantly from engineering estimates. Required certifications include statements of non-discrimination, non-collusion, and compliance with anti-harassment policies. Performance and payment bonds are required upon contract award.
Poured Concrete Foundation and Structure Contractors

POSTED

18 days ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS