Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IRON KING MINE-HUMBOLDT SMELTER (IKM-HS) Remedial Action Construction (RAC), Indefinite Delivery Indefinite Quantity (IDIQ)

Closed
W912PL25S0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Humboldt, AZ, 86329, USA

Set-Aside

NONE

Documents

1

IKMInterchangeMtgsJan312025.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Los Angeles
Contacts2 people available
OfficeLOS ANGELES, CA, 90017-3409, USA
Office AddressLOS ANGELES, CA, 90017-3409, USA
Contacts
Roger Minami Procurement Analyst Office of Small Business Programs

Full Description

Show more
This is a SOURCES SOUGHT announcement. The Government is seeking to identify qualified other than small and small business sources under North American Industry Classification System (NAICS) 237990 (Other Heavy and Civil Engineering Construction). The small business size standard is $45M. This notice is for market research purposes only and IS NOT A REQUEST FOR PROPOSAL (RFP) nor does it restrict the Government as to the ultimate acquisition approach. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. This announcement constitutes a market survey that is being conducted for planning purposes only and the information received will assist the Government in developing an acquisition method for this project. This notice does not constitute a commitment by the Government for any follow-on announcements, solicitation, or award. The Government invites responses from other than small and small businesses. This notice will be used in part to determine if there will be a small business reserve for the procurement. There is an industry day planned for 28 January 2025 between the hours of: 9AM-3:30PM. The purpose of the Industry Day is to encourage industry participation, allow for networking, answer respondent questions and confirm the project scope. CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE), Los Angeles District will select Construction Contracting firm(s) for a Single Award Task Order or Multiple Award Task Order for Construction Projects at Iron King Mine'Humboldt Smelter (IKM-HS) Superfund Site, Remedial Action Construction (RAC), Indefinite Delivery Indefinite Quantity (IDIQ), Dewey-Humboldt, AZ. The IDIQ will have a value up to $249,000,000.00. The contract(s) are anticipated to be awarded in 2nd quarter Fiscal Year 2027 with a five year-base period. Task order Limits: Minimum: $1,000,000.00 Maximum: $50,000,000.00 PROJECT INFORMATION: USACE Los Angeles District entered into a cooperative agreement with the United States Environmental Protection Agency (EPA) to provide remedial action for the IKM-HS Superfund Site, located in Dewey-Humboldt, Arizona (Site). The remedial action selected is presented in the Record of Decision (ROD), Iron King Mine - Humboldt Smelter, Superfund Site, Dewey-Humboldt, Yavapai County, Arizona, EPA ID: AZ0000309013 (USEPA, 2023). The RAC will be completed in compliance with the ROD and supplemental design information. The ROD selected remedy is Alternative 3B: On-Site Consolidation/Containment at Two Repositories with Waste Remaining East and West of the Highway. The highway is State Route 69 that serves as the main road to Prescott, Arizona, from Arizona Interstate 17. The Construction Contractor will be expected to perform the work described in the ROD Alternative 3B, including the dam removal noted below, retaining wall construction, creating a cap for the two repositories, and other construction activities as described and/or as needed for the site. Alternative 3B removes mine and smelter wastes, and contaminated soils and moving them to two waste repositories. Mine wastes and contaminated soils from the former mine and surrounding areas west of Highway 69 would be moved into a repository on the existing mine tailings pile west of the highway. Mine wastes at the former smelter and in the Chaparral Gulch east of Highway 69 would be moved into a second waste repository east of the highway. Additionally, the Lower Chaparral Gulch Dam east of the highway shall be removed to allow access to waste in the Lower Chaparral Gulch and restore the natural hydraulics and vegetation of the drainage. This shall include watershed and habitat restoration. A specific plan for removal of the dam will be provided to the dam removal contractor. Additional notable details concerning the site are associated with the former pyrometallurgical operations and the wall of solid slag hanging on a cliff above the Agua Fria River. The former pyrometallurgical operations of the Humboldt Smelter, (former blast furnaces, metal-purifying converters, coal and coke heating, sintering, power generation, etc.) were situated on the north end of a high plateau surrounded by steep slopes and lower terrain. This area contains soils contaminated with metals including arsenic and lead and the area is covered by dross waste. South of the former pyrometallurgical operations area, the smelter plateau also contains arsenic lead contaminated soils. On the eastern edge of the smelter plateau, a wall of solid slag hangs on the cliff above the Agua Fria River about 80 feet high. It contains roughly 280,000 cubic yards of material. The slag is similar to solidified lava rock. It is inert and does not pose a chemical health risk unless it is pulverized into soil-like material or sediments. Data indicates that pulverized slag is leachable and slag falling into the river and being pulverized could release metals to the river over time The Contractor performing this work shall comply with all applicable Federal, State, and local laws, and regulations including, but not limited to the 1968 National Oil and Hazardous Substances Pollution Contingency Plan, as amended, and the 1980 Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended. SUPPLEMENTAL INFORMATION IRON KING MINE - HUMBOLDT SMELTER DEWEY-HUMBOLDT, AZ Site Documents & Data https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.docdata&id=0905049#SC IRON KING MINE - HUMBOLDT SMELTER | Superfund Site Profile | Superfund Site Information | US EPA. SUBMISSION REQUIREMENTS: Interested firms should submit a document describing relevant demonstrated experience and qualifications via email contact@example.gov; contact@example.gov and contact@example.gov no later than 11 February 2025. The submissions should not exceed 10 pages. The submission will address all questions in the Sources Sought Questionnaire and your ability to perform services stated in the Project Information section of this sources sought. The purpose of the Industry Day is to encourage industry participation, allow for networking, answer respondent questions and confirm the project scope. There is an industry day planned for 28 January 2025 between the hours of: 9AM-3:30PM. The purpose of the Industry Day is to encourage industry participation, allow for networking, answer respondent questions and confirm the project scope. Cover letters and extraneous materials (brochures, etc) will not be considered. Questions concerning submissions should be directed to contact@example.gov; contact@example.gov and contact@example.gov. Personal visits for the purpose of discussing this announcement will not be scheduled. Emails or phone calls requesting personal visits will not receive a reply. SOURCES SOUGHT QUESTIONNAIRE SECTION 1: GENERAL Business Name: Business Address: Unique Entity ID (UEI) in SAM: If joint venture (JV), submit UEI of the JV: Responsible Point of Contact (Name, Number, email address): Offeror's type of business and business size (small business, SDB/8(a), WOSB, HUBZone, SDVOSB or other than small business (OTSB), Native Americans, Native Hawaiians, or Alaska Native Corporations SECTION 2: CONTRACTOR ARRANGEMENT 1)??Our firm will be proposing on this project as a: a.??Sole Contractor b.??Prime Contractor (if small business) self-performing at least 15% of the work, or c.??Joint venture with (Insert business name, business size, and UEI). (See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a)Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran Owned Program regulations described in FAR 19.1403(c) and 13 CFR 125.15 (b).) d. Other Than Small Business (OTSB) SECTION 3: PAST PERFORMANCE/CAPABILITY Past performance must include project examples from $5,000,000.00 to $249,000,000.00 in value. The IDIQ will be up to $249,000,000.00 The specific contract types such as firm fixed price (FFP) and cost reimbursable (CR), are required to be specified in the capability statements. The past performance duration is within the past 10 years for work in support of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA) and/or military installation restoration program sites. The paste performance information should include: Project Title and Location General Description to Demonstrate Relevance to the Proposed Project Scopes Self-Performed vs Subcontracted Dollar Value of Contract Percentage Self-Performed vs Subcontracted Agency or Government Entity for which the Work was Performed with Contact Information if Possible (Reference Name, Phone Number and E-Mail Address). Demonstrate Compliance with Various Environmental and Construction Permits Ability to Perform Work on Time/Within Budget Capacity to Execute this Project with Other Ongoing Contracts (3) projects that are complete or at least 50% complete that ran concurrently within the past ten years * Note: If providing info about a contract team, JV, etc, please provide examples where the team has worked together. Provide a general description/percentage of the work of each team member. 1)??Provide examples of experience with similar projects in a firm fixed price or cost reimbursable contract type. 2)??Construction project(s) experience within the last 5 to 10 years for the types shown in the following list. a.??Dam removal, all types . b.??Concrete dam removal. i.??Provide examples of coordination with appropriate state dam safety officials regarding dam removal. c.??Borrow area excavation, restoration, and revegetation plans. d.??Retaining wall construction. e.??Stream restoration and activities following dam removal. f.??Waste repository construction. i.??Regulatory compliance. ii.??Landfills and repositories liner and cover systems design and construction. iii.??Landfill monitoring instrumentation installation. g.??Examples of projects using specifications using Unified Facilities Guide Specifications (UFGS) products. h.??Ecosystem restoration design and application. 3)??Provide examples of experience with site remediation, waste removal, and/or site restoration of similar scope and size within the past 5 to 10 years. 4)??Provide examples of experience with waste remediation and/or waste removal for projects ranging value from $5,000,000.00 to $20,000,0000.00 within the past 5 to 10 years. 5)??Provide examples of experience with waste remediation and/or waste removal for projects ranging in value from $20,000,000.00 to $99,000,000.00 within the past 5 to 10 years. 6)??Provide ability to satisfy safety and environmental regulations in accordance with the Site requirements, along with local and state regulations. 7)??Offeror's bonding capability (construction bonding level per contract and aggregate construction bonding level, expressed in dollars) and current local contracting capacity. 8)??Describe examples of contracting with local/regional businesses. Provide examples of EPA work experience, if applicable. - The Remedial Action Construction (RAC), Indefinite Delivery/Indefinite Quantity (IDIQ), Contract up to $249M, NOTICE ID W912PL25S0009, contract award will not be dependent upon completion of the initial design packages from Iron King Mine - Humboldt Smelter, Remedial Design (RD), Indefinite Delivery/Indefinite Quantity (IDIQ), Contract up to $49M, NOTICE ID W912PL25S0007. The RAC base initial task order scope will be changed from Execution and Construction of RD (to include repository construction, dam removal, site restoration) to Construction of site work that defines the IKM-HS transportation routes and construction staging areas.

More opportunities from Department Of Defense → W075 Endist Los Angeles

Same awarding agency

NAICS: 811310
New
Federal
Material Handling Equipment (MHE) and Industrial Equipment (IE) Maintenance and Repair Services
Solicitation # W912PL27QA001
Solicitation W912PL27QA001 is a request for quotations for Material Handling Equipment (MHE) and Industrial Equipment (IE) maintenance and repair services to support seventeen USACE facilities across Arizona, California, and Nevada. This firm fixed price acquisition is a total set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 811310. The scope of work includes preventative maintenance and inspections, annual testing and certifications, break-fix repair services, emergency call-outs, and towing and transportation services. The contractor is responsible for providing all labor, tools, parts, and materials, with a specific requirement that parts conform to OEM or re-manufacturer specifications. The contract is structured with a base period from November 27, 2026, to November 26, 2027, followed by four optional extension years ending November 26, 2031. Award will be based on the Lowest Price Technically Acceptable (LPTA) method, evaluating offerors on a pass/fail basis regarding technical capacity, past performance from the last five years, and price. Technical acceptability requires a comprehensive staffing plan, a quality control plan, and a signed statement of compliance with USACE EM 385-1-1 safety standards. All quotes must be submitted via the Procurement Integrated Enterprise Environment (PIEE) portal by the deadline of November 23, 2026.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS