Islais Creek Bridge Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City and County of San Francisco is replacing the structurally deteriorated and seismically deficient Islais Creek Bridge on Third Street. The project involves the demolition of the existing structure and the construction of a new 115-foot-long, 105-foot-wide precast concrete bridge. This new infrastructure will meet current structural and seismic standards, accommodate light rail transit tracks, vehicular travel lanes, and two pedestrian and bicycle paths, while remaining resilient to predicted sea-level-rise impacts through the year 2100. Construction is anticipated to last approximately 24 months, with a projected start date in summer 2027. The project timeline includes an initial five-month period of maintained public access, followed by a full bridge closure. Vehicle traffic is expected to resume approximately 15 months after closure, with light rail operations returning 19 months after closure. The project is subject to strict environmental compliance under the California Environmental Quality Act, requiring a Construction Emissions Minimization Plan, adherence to U.S. EPA and CARB Tier 4 Final emission standards for equipment over 25 hp, and a strict two-minute idling limit. The project is managed by the San Francisco Planning and Public Works departments, with oversight from various agencies including the U.S. Coast Guard and the Army Corps of Engineers. Key deliverables include biannual compliance reports and the implementation of a Mitigation Monitoring and Reporting Program to address impacts on air quality, biological resources, and cultural assets. Documentation of historic features and the use of multilingual signage for idling restrictions are mandatory requirements for the performing contractor.

General Info

San Francisco will replace Islais Creek Bridge starting summer 2027 over 24 months.

Agency

California → City and County of San Francisco

Place of Performance

Third Street between Cargo Way and Marin Street, San Francisco, CA, 94124

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts2 people available
OfficeN/A
Organization / Agency
California → City and County of San Francisco
Office AddressN/A
Contacts
Chelsea FordhamSenior Planner
Thomas RoitmanProject Applicant

Interested Companies (1)

AecomLOS ANGELES, CA

Full Description

Show more
The Isla is Creek Bridge is on Third Street over the Isla is Creek channel in San Francisco's Bayview neighborhood. The project would demolish and replace the existing Isla is Creek Bridge, including all electrical equipment and drive machinery needed to open the existing drawbridge. The proposed replacement bridge would meet current structural and seismic standards and would be resilient to predicted sea-level-rise impacts up to the year 2100. The proposed bridge design would be a 115-foot-long, 105-footwide,single-span precast/prestressed concrete adjacent box beams bridge. The bridge would accommodate a center 24-foot-wide dedicated light rail trackway, two 11-foot-wide travel lanes in each direction, a 12-footwide Class I pedestrian path on the eastern side of the bridge, and a 17-foot-wide Class I shared pedestrian/bicycle path on the western side of the bridge. Although project construction is anticipated to extend for a total duration of approximately24 months, publicaccess to the bridge (e.g., use· of the existing light rail and access for vehicular, bicycle, and pedestrian traffic) would continue for the first five months during the early phases of construction. There would be no access for vehicles, light rail, or pedestrians to the project area once the bridge is closed to the public. Following construction of the new-bridge, pedestri~·n access and vehicular traffic are expected to resume earlier than the full 24-month duration, with vehicle traffic potentially reopening as soon as 15 months after bridge closure, even while project close-out and early operations-related activities are still underway. Light rail operations are anticipated to require additional activities prior to reopening and therefore, are anticipated to resume 19 months after bridge closure. The SFMTA, in coordination with San Francisco Public Works, would develop a comprehensive community engagement and mobility strategy for the bridge closure. The Mobility Strategy would address the rerouting plans around the lslais Creek Bridge and T-Third (and 19-Polk bus, as applicable) bridge plans and would also identify ways to reduce effects to the mobility networks for all users (e.g., private vehicles, buses, people walking and bicycling).

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

3 days ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS