ITB 24-128 Road Resurfacing of: Small County Outreach Program (SCOP) Project East Turner Camp Road from East Matthew Meadow Court to the East end of East Turner Camp Road (including boat ramp parking area)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the full depth reclamation and resurfacing of E Turner Camp Blvd, a two-lane roadway approximately 8,830 feet in length from E Matthew Meadow Ct to the east end of E Turner Camp Blvd, including the boat ramp area. The contractor is responsible for providing all labor, materials, equipment, and consumables necessary to perform the work, which includes pulverizing and blending existing pavement and base materials to create a stabilized base course. This base will be reinforced with injected emulsion and Portland cement, topped with two lifts of Type FC 12.5 asphalt, and finished with pavement markings compliant with MUTCD standards. The project requires adherence to FDOT specifications, with asphalt mix designs pre-approved and submitted at bid time, and the use of a designated asphalt production facility. All incidental work such as shoulder grading, milling, vegetation removal, and pavement markings is included within the contract scope and not separately paid. The project is funded through an FDOT SCOP grant and will be awarded based on unit prices, covering all associated costs including mobilization, testing, and surface preparation. The contract emphasizes compliance with FDOT standards and specifications, ensuring quality and consistency across the roadway reconstruction.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
http://www.fdot.gov/programmanagement/Implemented/SpecBooks/default.shtm
At time of Bid submission, Contractor must furnish the asphalt mix formula(s) and current FDOT Asphalt Mix Design Plant Assignment Sheet to the County Engineer. The submittal will be a current FDOT pre-approved mix design for the noted asphalt. Reclaimed asphalt will comply with FY 2024-25 FDOT Standard Specifications 334 “Use of RAP Material”. Where the Contractor has multiple production facilities, they will designate one facility to be used for this contract and use only that facility. Asphalt produced at a facility other than that designated by Contractor will be rejected for use on this project. If Contractor elects to change production facilities during this Contract, they will notify the County Engineer and receive approval prior to doing so, but in no case will different production facilities be used on the same roadway.
FDOT Standard Specifications 334 and 337 will govern – Measurement and Payment will be unit price of asphalt placed, tested and certified; and will include: the cost of mobilization, MOT, tack (at an application rate as directed in Section 300 – 8.4, 8.5, and 8.6, unless where otherwise specified, and will be sufficient to bond the new surface to new stabilized base), testing, trim/expose road/asphalt edge, chemical removal of grass/vegetation, and cleaning of roadway surface within entire resurfacing area.
Additional Information:
A. All Temporary Painted Pavement Markings/RPM’s are incidental to the contract and will not be paid for separately.
B. All Millings are incidental to the contract and Contractor will keep the millings.
C. Shoulder grading/embankment/borrow work is incidental to the contract.
D. See Special Provisions for work that is specified as incidental to the contract.
Citrus County, Florida (“County”) invites interested parties to submit a Bid to provide roadway full depth reclamation (FDR) and resurfacing Work for two lanes of E. Turner Camp Road from E Matthew Meadow Ct to the east end of E Turner Camp Blvd (including boat ramp parking lot). Successful Bidder shall furnish all labor, material, consumables, tools and appropriate equipment necessary to perform all operations for FDR, and all other work noted in the plans.
This Project will be awarded as a Unit Price Bid Contract and is funded by a Florida Department of Transportation (FDOT) SCOP Grant.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS