This Solicitation opportunity from Florida was posted on January 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ITB 25-021 Crystal River Airport (CGC) Fuel Farm Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Citrus County Board of Commissioners in Florida is soliciting bids for the Crystal River Airport Fuel Farm Project, which involves comprehensive work to upgrade the airport's fuel storage and dispensing infrastructure. The project encompasses the removal and replacement of two 12,000-gallon aviation fuel tanks, along with associated components such as sump recovery tanks, pumps, filters, piping (including relocation of existing lines), hoses, reels, coatings, and painting. Additional tasks include concrete sealing and repairs, electrical work for lighting and emergency systems, installation of a fuel shut-off system, and the integration of various safety and control systems like the Scully system, galvanized steel catwalk, and remote fueling cabinet with card reader. The scope also covers asphalt patching and other incidental work necessary to complete the project. All work must be performed in strict accordance with the provided construction drawings, specifications, and contract documents, ensuring compliance with all relevant permits and federal, state, and local laws, rules, and codes. The successful bidder will be responsible for obtaining and adhering to all required permits and ensuring that the project meets regulatory standards. The contract size is estimated between $500,000 and $1,500,000, with a response deadline of February 18, 2025. The project aims to modernize and secure the airport’s fuel handling capabilities, emphasizing safety, compliance, and operational efficiency.
General Info
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
All Work shall be in accordance with the construction drawings, specifications, and Contract Documents.
The Successful Bidder shall adhere to all permit(s) requirements, and all Federal/FAA, State, and Local Laws/Rules/Codes as applicable to this Project. The Successful Bidder will be responsible for all Permitting.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
