This Solicitation opportunity from Texas was posted on March 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Harris County has issued solicitation number 26/0100 for the construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 (Project ID B509-04-00-E002) for the Harris County Flood Control District. This infrastructure project involves a 450-day performance schedule and requires adherence to technical specifications from the Harris County Flood Control District, City of Houston, and TxDOT. Bids are due by April 20, 2026, and must be submitted via the Bonfire portal. The project includes strict federal and local compliance mandates, including the Build America, Buy America Act (BABAA) for construction materials and GLO Information Security requirements for handling sensitive data.
Contractors must meet a Minority- and Woman-Owned Business Enterprise (M/WBE) participation goal of 15.47 percent. A critical mandatory requirement is compliance with the Harris County Minimum Wage Policy, which establishes a wage floor of 21.65 dollars per hour, adjusted annually via the MIT Living Wage Calculator. This wage requirement must be flowed down to all subcontractors, and failure to certify compliance results in automatic disqualification. Additionally, bidders must provide certifications regarding federal lobbying and adhere to 2 CFR 200 federal grant compliance.
General Info
Harris County stormwater basin construction project; bids due April 20, 2026 via Bonfire.
HighAI Summary for Addendum No. 3 - 260100: BABAA Bidder's Acknowledgement: This document is Addendum No. 3 for project 260100, containing the Build America, Buy America Act (BABAA) Bidder's Acknowledgement and Self-Certification Form. It requires contractors and subcontractors to certify that all iron, steel, manufactured products, and construction materials used in the infrastructure project are produced in the United States in compliance with HUD requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 - Bid & Addenda Acknowledgement: This document is Attachment A, the Bid & Addenda Acknowledgement form for a Harris County Invitation for Bid (IFB). It requires bidders to acknowledge receipt of all addenda and certify that their bid is submitted without collusion or fraud.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 - Plans and Drawings: This document is Addendum No. 3, providing technical specifications and special provisions for a construction project. It incorporates standards from the Harris County Flood Control District (June 2020), City of Houston (November 2023), and TxDOT (2023/2024). Key content includes specific provisions for site construction, material disposal, and detailed requirements for Project Identification Signs, Construction Site Notices (CSN), and Labor/Safety Boards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment B - Bid Schedule - Pricing Form: A pricing form and bid schedule document containing a list of multiple procurement opportunities for Harris County entities, including ITBs, RFPs, and CSPs. It lists reference numbers, department names, and opening dates for projects such as the Harris County Sheriff's Office and Harris Health System, dated April 20, 2026.
PDF
PDF, High priority: read this firstbid-schedule
HighAI Summary for Attachment B Bid Schedule / Pricing Form for Harris County IFB: Attachment B contains the Bid Schedule / Pricing Form for the Harris County Invitation for Bid (IFB). It provides instructions for submitting pricing online via Bonfire and specifies that prices must be firm and all-inclusive for the contract duration. The document outlines requirements for unit pricing, freight charges, and maintenance costs if applicable. It emphasizes that any additional charges must be clearly indicated or will not be paid. This document is critical for bidders to properly price their proposals and comply with contract terms.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment B - Bid Schedule - Pricing Form (M/WBE Goal Participation): This document outlines the Minority- and Woman-Owned Business Enterprise (M/WBE) goal participation requirements for a Harris County procurement. It establishes a 15.47% participation goal, details the required M/WBE Utilization Plan and Commitment Form, specifies accepted certifications, and defines 'Significant Local Presence' and 'Commercially Useful Function' to ensure valid goal credit.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment S - Sheet List Table: This document is Attachment S, consisting of a comprehensive Sheet List Table. It details the numbering, titles, and revision statuses for a project's technical drawings, including topographic layouts, excavation plans, coordinate layout plans, and standard details, specifically focusing on Phase 2 (PH-2) of the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment W - GLO Compliance Package: This document is Attachment W of a project manual, containing the GLO Information Security Appendix and GLO Contractor Bid Certification. It outlines mandatory security and privacy compliance for contractors handling PII and SPI, including NIST framework adherence, data ownership, breach notification protocols (24-hour window), and audit rights. It also includes a certification form for bidders regarding federal funding and construction requirements.
PDF
PDF, High priority: read this first2 pages · certification
HighAI Summary for Certification Regarding Lobbying for Federal Contracts: This document is a Certification Regarding Lobbying to be submitted with each bid exceeding $100,000. It certifies that no federal appropriated funds have been used to influence federal officials in connection with federal contracts, grants, loans, or cooperative agreements. It requires disclosure of any lobbying activities using Standard Form-LLL. The certification must be included in all subawards and subcontracts. The document includes instructions and a form for reporting lobbying activities as mandated by 31 U.S.C. § 1352, with penalties for non-compliance. It is a material representation of fact required for federal transactions.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Genoa Red Bluff Stormwater Detention Basins - Phase 2 (Project ID B509-04-00-E002): Invitation for Bids (IFB) issued by Harris County for the construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2. The document outlines general requirements, a 450-day project schedule, and a mandatory pre-bid conference scheduled for April 7, 2026. It includes a comprehensive list of attachments ranging from pricing forms to geotechnical reports and federal grant compliance requirements (2 CFR 200).
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Contractor Minimum Wage Policy - FAQ: An FAQ document from the Harris County Office of the Purchasing detailing the Contractor Minimum Wage Policy. It establishes a minimum wage of $21.65 per hour for workers on eligible contracts solicited after October 1, 2025, with annual adjustments based on the MIT Living Wage Calculator. The policy applies to contracts over $100,000, with specific exemptions for sole source, emergency, and certain professional services. It includes guidance on compliance, reporting violations, and the interaction between this policy and federal Davis-Bacon or prevailing wage requirements.
PDF
PDF, High priority: read this first5 pages · wage-determination
HighAI Summary for Harris County Contractor Minimum Wage Policy FAQ: This document is the Harris County Contractor Minimum Wage Policy FAQ, effective for contracts solicited after October 1, 2025. It establishes a minimum wage of $21.65 per hour for workers on eligible Harris County contracts, adjusted annually based on the MIT Living Wage Calculator. The policy applies to all contractors and subcontractors regardless of full-time or part-time status, with specific exemptions listed. It outlines compliance requirements, reporting procedures for violations, and clarifies that the highest applicable wage rate between Harris County, prevailing wage, or Davis-Bacon wage must be paid. The document also addresses the policy's applicability to federally funded contracts and contract renewals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HCFCD Project B509-04-00-E002 - Genoa Red Bluff Stormwater Detention Basins Phase 2: Technical drawing set and sheet index for the Genoa Red Bluff Stormwater Detention Basins - Phase 2 project (HCFCD Project ID B509-04-00-E002). The document includes a comprehensive sheet list covering general notes, topographic layouts, excavation plans, coordinate tables, and standard details, issued for bidding.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB - Genoa Red Bluff Stormwater Detention Basins - Phase 2 (B509-04-00-E002): Invitation for Bids (IFB) issued by Harris County for the construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 (Project ID B509-04-00-E002). The document outlines general requirements, a 450-day project schedule, and a mandatory pre-bid conference scheduled for April 7, 2026. It includes a comprehensive list of attachments ranging from pricing forms to geotechnical reports and federal compliance requirements (2 CFR 200).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 26/0100 Addendum No. 2 - Genoa Red Bluff Stormwater Detention Basins: Addendum No. 2 dated April 2, 2026, for Job No. 26/0100 regarding the Construction of the Genoa Red Bluff Stormwater Detention Basins – Phase 2. The document provides a Q&A section clarifying that the project budget will not be disclosed and confirming the pre-bid conference date as April 7, 2026. Bids are due April 20, 2026.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Job No. 26/0100 - Addendum No. 3 - Genoa Red Bluff Stormwater Detention Basins Phase 2: Addendum No. 3 dated April 15, 2026, for the Construction of the Genoa Red Bluff Stormwater Detention Basins – Phase 2 for the Harris County Flood Control District. This document provides critical revisions to the Federal IFB General Conditions (including BABA certification), the Project Manual, Plans and Drawings, and the BidTable. It includes specific quantity adjustments for various pay items (e.g., trench shoring, excavation, concrete lining) and a Q&A section addressing bid date extensions, contract time, and technical specifications. Bids are due April 20, 2026.
PDF
PDF, Low prioritypolicy
LowAI Summary for Harris County Minimum Wage Policy for Contract Workers: This document outlines the Harris County Minimum Wage Policy for Contract Workers, adopted by the Harris County Commissioners Court on June 4, 2024. It establishes a minimum wage floor of $21.65 per hour for workers on eligible County contracts, adjusted annually based on the MIT Living Wage Calculator. The policy applies to contractors and subcontractors working on County projects starting July 1, 2025, with specific exemptions listed. It aims to improve work quality, safety, and productivity by ensuring fair wages. The Harris County Purchasing Department administers compliance and wage adjustments annually.
PDF
PDF, Low priorityindustry-day
LowAI Summary for Job No. 26/0100 - Pre-Bid Conference Attendance: Attendance log for the Pre-Bid Conference held on April 7, 2026, regarding Job No. 26/0100: Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 for the Harris County Flood Control District.
PDF
PDF, Low priorityindustry-day
LowAI Summary for Job No. 26/0100 - Pre-Bid Conference Attendance: Attendance log for the virtual pre-bid conference held on April 7, 2026, regarding Job No. 26/0100 for the Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 for the Harris County Flood Control District.