ITB for Rehabilitation of plum concrete surface Gozar #01, District#03 and Gozar #03, District #06, Pol-e-Khomri city Baghlan Province (2 Lots), Afghanistan This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen d
Open
ITB/2026/65598International
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
UNOPS is soliciting bids for the rehabilitation of residential streets and drainage systems in Pol-e-Khomri city, Baghlan Province, Afghanistan under solicitation ITB/2026/65598. The project is divided into two lots: Lot 1 involves the rehabilitation of five residential streets totaling 400 meters in Gozar #01, District #03, and Lot 2 involves the rehabilitation of two residential streets totaling 450 meters and the construction of a PCC drain in Gozar #03, District #06. Key deliverables for both lots include the construction of a 17 cm thick plum concrete surface layer and a 15 cm thick crushed aggregate base course layer, along with various lengths of PCC drains and steel grills. Lot 2 additionally requires a stone masonry retaining wall and precast RCC slab culverts.
The contract will be awarded based on the lowest priced, substantially compliant methodology, with a specific disqualification trigger if the non-labor wage and material price is more than 12% below the UNOPS Engineering Estimate. Subcontracting is strictly prohibited, though the supply of materials and equipment rental is permitted. Contractors are typically limited to two active contracts to ensure implementation capacity. All work must adhere to AASHTO Publications, ILO Construction guidelines, and the 2010 Americans with Disabilities Act. Quality assurance is managed through routine on-site testing and third-party professional laboratory verification, with strict surface tolerances of plus or minus 20 mm.
General Info
UNOPS seeks bids to rehabilitate residential streets and drainage in Baghlan, Afghanistan.
HighAI Summary for BOQ-AF2-BGN-D3-SP03: Rehabilitation of Karta Naw streets: Bill of Quantities (BOQ) dated November 15, 2026, for the rehabilitation of Karta Naw streets in Pol-e-Khomri city, Bighan, Afghanistan. The document outlines a two-part payment structure: Part I for non-labor materials and contractor payments, and Part II for labor wages disbursed directly by AIB Bank. It includes specific quantities for crushed aggregate base course and plum concrete pavement, with a required project duration of 105 calendar days.
XLSX
XLSX, High priority: read this firstboq
HighAI Summary for BOQ - Rehabilitation of Karta Naw streets (AF2-BGN-D3-SP03): Bills of Quantities (BOQ) for the rehabilitation of Karta Naw streets with plum concrete surface (400m) in Pol-e-Khomri city, Baghlan, Afghanistan. Issued November 15, 2026, for the Community Resilience and Livelihood Project (CRLP). The document includes pricing schedules for general items, earthworks, and specific labor administration costs, with a project duration of 105 calendar days.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for CRLP-AF2 Occupational Health and Safety (OHS) Procedure: Annex 4 of the Afghanistan Community Resilience and Livelihoods Project (CRLP-AF2) establishing the Occupational Health and Safety (OHS) Procedure. It defines the purpose, scope, and roles for UNOPS, contractors, and workers to identify and mitigate risks, ensure compliance with World Bank Environmental and Social Standards, and maintain a safe working environment.
DOCX
DOCX, High priority: read this firstitb
HighAI Summary for ITB 2026 65598 - Returnable Schedules: Section VI of ITB/2026/65598 for the rehabilitation of plum concrete surfaces in Baghlan Province, Afghanistan. This document provides instructions and templates for returnable schedules, including the Bid Submission Declaration and Bidder's Information forms required for a valid bid submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 5 - Labor Management Procedures: This document outlines the Labor Management Procedures (LMP) for a project managed by UNOPS in Afghanistan. It defines worker categories (Direct, Contracted, Primary Supply, and Community Workers) and aligns with ESS 2 and ESS 4 standards. The document includes a labor risk and impact assessment covering working conditions, child labor prohibitions, occupational health and safety, and gender-based violence (GBV) mitigation, specifying requirements that must be reflected in contract documents.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for ITB Section V Annex 6 - Safeguard Documents & Toolbox Talks: This document serves as an index of links for safeguard documents, environmental and social management frameworks, and health and safety 'toolbox talks' associated with an Invitation to Bid (ITB). It lists 64 specific references including waste management, labor procedures, COVID-19 risks, and safety checklists.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 7 - Gender Action Plan: Updated April 16, 2026, this Gender Action Plan for the Community Resilience and Livelihood Project outlines mandatory requirements for contractors regarding gender-inclusive planning, women's participation in labor (7% target), equal pay, and capacity building. It establishes specific indicators and targets for social inclusion, safety, and reporting to ensure gender mainstreaming throughout the project lifetime.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 9.2 - Preamble to the BOQ: Dated 2026, this document serves as the Preamble to the Bills of Quantities (BOQ) for the Afghanistan Community Resilience and Livelihoods Project managed by UNOPS. It establishes the basis for pricing the works, defines measurement methods, and specifies labor requirements, including mandatory daily wages for skilled and unskilled workers. It provides critical instructions for bidders on how to price items to avoid double-counting labor costs and outlines the precedence of contract documents.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Key Staff, Machinery, Equipment and Tools Requirements: This document outlines the minimum requirements for key personnel and construction equipment necessary for a project. It specifies qualifications for a Project Manager, Quality Control Engineer, HSE Officer, and Community Liaisons, while also listing required machinery such as dump trucks, concrete mixers, graders, and rollers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lot 1 - Section V Annex 8 - Design Package (General Notes): Technical specifications and general notes for the Afghani Stance Community Resilience & Livelihoods Project (ID: AFZ-B20-D3-SP03). The document details construction requirements, including material standards (ASTM/AASHTO), concrete strength (15MPa to 25MPa), minimum concrete cover, excavation methods, and sub-base/aggregate base course compaction requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lot 2 - Design Package AF2-BGN-D6-SP02: Technical specifications and general notes for the Afghani Stance Community Resilience & Livelihoods Project managed by the United Nations Office for Project Services (UNOPS). The document details construction requirements including concrete strength (15MPa to 25MPa), reinforcement cover, material standards (ASTM/AASHTO), excavation methods, and quality control protocols.
PDF
PDF, High priority: read this firstboq
HighAI Summary for Lot 2 - Section V Annex 9.1 BOQ-AF2-BGN-D6-SP02: Bill of Quantities (BoQ) dated November 15, 2026, for the rehabilitation of Karta-e-Quwaye Karp concrete surface streets and construction of a PCC drain in Pol-e-Khomri city, Afghanistan. The document specifies labor wage payments managed by AIB Bank and details non-labor material costs for reinforcement, crushed aggregate base course, and plum concrete pavement.
XLSX
XLSX, High priority: read this firstboq
HighAI Summary for Lot 2 - Section V Annex 9.1 BOQ-AF2-BGN-D6-SP02: Bills of Quantities (BOQ) for the rehabilitation of Karta-e-Quwayee Kar plum concrete surface streets and construction of a PCC drain in Pol-e-Khomri city, Baghlan, Afghanistan. Issued November 15, 2026, for the Community Resilience and Livelihood Project (CRLP). The document includes detailed pricing schedules for non-labor wage/material items, labor administration costs, and earthworks.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project Brief AF2-BGN-D3-SP03 - Karta Naw Streets Rehabilitation: Project brief dated 2023-10-01 for the rehabilitation of five residential streets (Karta Naw) in Pol-E-Khomri City, Baghlan Province. The scope includes 400m of plum concrete surfacing, 17cm thick surface layers, 15cm crushed aggregate base, 675 linear meters of PCC drains, and 5.3 meters of steel grills.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project Brief: Rehabilitation of Karta-E-Quwayee Kar Plum Concrete Surface Streets (AF2-BGN-D6-SP02): Dated August 2026, this project brief defines the scope of work for the Afghanistan Community Resilience and Livelihood Project in Pol-E-Khomri City, Baghlan. The project involves the rehabilitation of 450m of residential streets with plum concrete surfaces, construction of 95m of PCC drains, stone masonry retaining walls, RCC slab culverts, and installation of steel grills. It includes technical specifications for pavement design, drainage requirements, and seismic risk considerations.
DOCX
DOCX, High priority: read this firstitb
HighAI Summary for Small Works ITB 2026 65598 - Evaluation Method and Criteria: This document outlines the evaluation methodology and criteria for an Invitation to Bid (ITB) for Small Works (ITB 2026 65598). It specifies a 'lowest priced, substantially compliant' selection process involving preliminary screening, technical evaluation (qualification and technical criteria), and financial evaluation. It includes detailed pass/fail requirements for bidder eligibility, financial capability (turnover and liquidity), and similar experience.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Small Works - ITB Section I: Instructions to Bidders: Section I of an Invitation to Bid (ITB) for Small Works (Version 1.1, 2024). This document provides the Instructions to Bidders, covering the scope of the bid, interpretation of the ITB, amendment processes, and detailed bidder eligibility requirements, including conflict of interest disclosures and UN-specific ineligibility lists.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sub-Project Site-Specific ESMP - Rehabilitation of Karta-e-Quwayee Kar: Environmental and Social Management Plan (ESMP) dated 18 Aug 2026 for the rehabilitation of Karta-e-Quwayee Kar Plum Concrete Surface Street and PCC Drain in Pulikhumri city. The document outlines mitigation measures, monitoring indicators, and frequencies for risks including air/noise pollution, waste management, and occupational health and safety.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sub-project Site-Specific ESMP - Rehabilitation of Karta Naw Streets: Dated 12 Aug 2026, this Environmental and Social Management Plan (ESMP) outlines mitigation measures, monitoring methods, and responsibilities for the rehabilitation of Karta Naw Streets (400m) in Pol-e-Khomri City. It specifies requirements for managing air and noise pollution, waste disposal, borrow pit restoration, occupational health and safety, and grievance redress mechanisms, with implementation by the Contractor HSSE Officer and monitoring by the UNOPS Safeguard Team.
PDF
PDF, High priority: read this firstsow
HighAI Summary for TOR - Rehabilitation of Karta-e-Quwayee Kar Plum Concrete Surface Street: Terms of Reference (TOR) for the rehabilitation of Karta-e-Quwayee Kar Plum Concrete Surface Street and PCC Drain in Pulikhumri city, Afghanistan. Part of the World Bank-funded Afghanistan Community Resilience and Livelihood Project (CRLP) delivered via UNOPS. The scope includes excavation, subgrade construction, plum concrete pavement, and PCC culvert installation.
PDF
PDF, High priority: read this firstsow
HighAI Summary for TOR - Rehabilitation of Karta-e-Quwayee Kar Plum Concrete Surface Street: Terms of Reference (TOR) for the rehabilitation of a 380m plum concrete surface street and 95m PCC drain in Pulikhumri city, Afghanistan. Part of the World Bank-funded Afghanistan Community Resilience and Livelihood Project (CRLP) delivered via UNOPS. The scope includes excavation, subgrade construction, plum concrete pavement, and PCC culverts.
PDF
PDF, High priority: read this firstsow
HighAI Summary for TOR - Rehabilitation of Karta Naw Streets, Pol-e-Khomri City: Terms of Reference (TOR) for the rehabilitation of Karta Naw Streets using plum concrete in Pol-e-Khomri City, part of the World Bank-funded Afghanistan Community Resilience and Livelihood Project (CRLP) delivered by UNOPS. The scope includes excavation, subgrade construction, plum concrete pavement, side ditches, and stone masonry culverts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UNOPS Afghanistan Small Works Specification Rev 8: Technical specifications for small works in Afghanistan, Revision 8 (February 2026). The document outlines general requirements, site clearance, drainage, earthworks, concrete, and reinforcement standards, including detailed provisions for workmanship, quality control, and project programming.
Description Tender description: ITB for Rehabilitation of plum concrete surface Gozar #01, District#03 and Gozar #03, District #06, Pol-e-Khomri city Baghlan Province (2 Lots), Afghanistan IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/GuidesInterested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.