ITB for Upgrading of Plum concrete Surfaces in district 9 of Kandahar and district 8 of Kunduz city (2 lots) - Afghanistan This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. /
Open
ITB/2026/65600International
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
UNOPS is soliciting bids for the upgrading of plum concrete surfaces in Afghanistan, divided into two lots. Lot 1 involves upgrading the Malalai Clinic Plum Concrete Surface Street in District 9 of Kandahar City with a total length of 530m, while Lot 2 involves upgrading the Boz-E-Shah Mahmood and Boz-E-Qandari streets in District 8 of Kunduz City with a total length of 880m. The scope of work includes the construction of plum concrete surface layers and crushed aggregate base course layers, with additional drainage work in Kunduz consisting of PCC drains, earthen drains, and steel grills. The period of performance is 150 calendar days for Lot 1 and 165 calendar days for Lot 2.
The contract will be awarded based on a lowest priced, substantially compliant methodology, with a specific disqualification trigger if the non-labor wage and material price is more than 12% below the UNOPS Engineering Estimate. Bidders are limited to a maximum of two active contracts concurrently. Key contractual terms include a strict prohibition on subcontracting, though the supply of materials and equipment rental is permitted. Labor wages for unskilled and skilled workers are set at AFN 450 and AFN 700 per day, respectively, and are executed via AIB Bank using a biometric digital system. There is no set-aside status for this solicitation.
General Info
UNOPS seeks bids to upgrade plum concrete surfaces in Kandahar and Kunduz.
HighAI Summary for BOQ - Upgrading of 880m plum concrete surface street (AF2-KNZ-D8-SP01): Bills of Quantities (Annex 9.1) for the upgrading of 880m plum concrete surface streets in District #8, Kunduz city, Afghanistan. Issued November 15, 2026, for the Community Resilience and Livelihood Project (CRLP). The document includes detailed pricing schedules for general items, earthworks, and specific labor administration costs, with payments managed via AIB Bank.
PDF
PDF, High priority: read this firstboq
HighAI Summary for BOQ - Upgrading of Malalai Clinic Plum Concrete Surface Street (AF2-KDR-D9-SP01): Bill of Quantities (BOQ) dated November 15, 2026, for the upgrading of a 530m plum concrete surface street at Malalai clinic in Kandahar, Afghanistan. The document specifies labor wage payments (AFN 450 for unskilled and AFN 700 for skilled labor) to be disbursed directly by AIB Bank and outlines pricing instructions for the contractor.
XLSX
XLSX, High priority: read this firstboq
HighAI Summary for BOQ - Upgrading of Malalai Clinic Street (AF2-KDR-D9-SP01): Bills of Quantities (BOQ) for the upgrading of Malalai clinic plum concrete surface street (530m) in Kandahar, Afghanistan, under the Community Resilience and Livelihood Project. Issued November 15, 2026, the document specifies pricing for non-labor wages and materials, including general items, earthworks, and labor administration costs, with a project duration of 150 calendar days.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for BOQ - Upgrading of Plume Concrete Surface Street (AF2-KNZ-D8-SP01): Bill of Quantities (BoQ) dated November 15, 2026, for the upgrading of 880m of plume concrete surface streets in District #8, Kunduz city, Afghanistan. The document details material costs (Part 1) and labor wage payments (Part 2) to be disbursed via AIB Bank, including specific quantities for crushed aggregate base course and plum concrete pavement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Design Package - AF2-KNZ-D8-SP01 (Engineering Drawings): Engineering drawings and technical specifications for the upgrading of 880m plum concrete surface streets in District 8, Kunduz City, Afghanistan (Contract ID: AF2-KNZ-D8-SP01). The document details material standards (ASTM/AASHTO), concrete strength requirements (15MPa to 25MPa), reinforcement specifications, and quality control procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Design Package - Upgrading of Malalai Clinic Plum Concrete Surface Street (AF2-KDR-D9-SP01): Engineering drawings and technical specifications for the upgrading of Malalai Clinic plum concrete surface street (530m) in Kandahar City, Afghanistan. Dated October 2026, the document details material standards (ASTM/AASHTO), concrete cover requirements, workmanship, quality control, and structural steel specifications for contract AF2-KDR-D9-SP01.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for ITB 2026 65600 - Section VI Returnable Schedules: Section VI of ITB/2026/65600 for the upgrading of plum concrete surfaces in Kandahar and Kunduz city, Afghanistan. This document provides instructions and templates for returnable schedules, including the Bid Submission Declaration and Bidder's Information, which are critical for bid submission and evaluation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 4 - Examples of Contractual Clauses: This document provides a set of example contractual clauses for contractors regarding Environmental and Social (E&S) management. It outlines prohibitions, waste management, borrow pit requirements, safety protocols, dust control, and archaeological discovery procedures to ensure alignment with World Bank E&S standards and Labor Management Procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 5 - Labor Management Procedures: This document outlines the Labor Management Procedures (LMP) for a project managed by UNOPS in Afghanistan. It defines worker categories (Direct, Contracted, Primary Supply, and Community Workers) and aligns with ESS 2 and ESS 4 standards. The document includes a labor risk and impact assessment covering working conditions, child labor prohibitions, occupational health and safety, and gender-based violence (GBV) mitigation, specifying requirements that must be reflected in contract documents.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for ITB Section V Annex 6 - Safeguard Documents & Toolbox Talks: This document serves as an index of links for safeguard documents, environmental and social management frameworks, and health and safety 'toolbox talks' associated with an Invitation to Bid (ITB). It lists 64 specific references including waste management, labor procedures, COVID-19 risks, and safety checklists.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 7 - Gender Action Plan: Updated April 16, 2026, this Gender Action Plan for the Community Resilience and Livelihood Project outlines mandatory requirements for contractors regarding gender-inclusive planning, women's participation in labor (7% target), equal pay, and capacity building. It establishes specific indicators and targets for social inclusion, safety, and reporting to ensure gender mainstreaming throughout the project lifetime.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ITB Section V Annex 9.2 - Preamble to the BOQ: Dated 2026, this document serves as the Preamble to the Bills of Quantities (BOQ) for the Afghanistan Community Resilience and Livelihoods Project managed by UNOPS. It establishes the basis for pricing the works, defines measurement methods, and specifies labor requirements, including mandatory daily wages for skilled and unskilled workers. It provides critical instructions for bidders on how to price items to avoid double-counting labor costs and outlines the precedence of contract documents.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Key Staff, Machinery, Equipment and Tools Requirements: This document outlines the minimum requirements for key personnel and construction equipment necessary for a project. It specifies qualifications for a Project Manager, Quality Control Engineer, HSE Officer, and Community Liaisons, while also listing required machinery such as dump trucks, concrete mixers, graders, and rollers.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project Brief AF2-KDR-D9-SP01 - Malalai Clinic Street Upgrading: Project brief dated 2023-10-01 for the rehabilitation of a 530m residential street near Malalai Clinic in Kandahar City, District 9. The scope of work includes sub-grade preparation, installation of a 15cm crushed aggregate base course, and a 20cm plum concrete surface layer. The document provides technical details on pavement design, drainage assessments, site survey information, and climate studies for the project area.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Project Brief: Upgrading of 880m Plum Concrete Surface Street (AF2-KNZ-D8-SP01): Project brief dated October 2026 for the Afghanistan Community Resilience and Livelihood Project. The scope involves the rehabilitation of an 880m residential street in District 8, Kunduz City, including the construction of a 17cm plum concrete surface, crushed aggregate base course, 590m of PCC drains, 790m of earthen drains, and 45.3m of steel grills.
DOCX
DOCX, High priority: read this firstitb
HighAI Summary for Small Works ITB 2026 65600 - Evaluation Method and Criteria: This document outlines the evaluation methodology and criteria for an Invitation to Bid (ITB) for Small Works (ITB 2026 65600). It details a five-step 'lowest priced, substantially compliant' process including preliminary screening, qualification evaluation, technical evaluation, financial evaluation (with a 12% lower price limitation), and due diligence. It specifies formal eligibility, qualification criteria (including business licensing in Afghanistan, financial liquidity of USD 20,000 per lot, and annual turnover of USD 100,000), and technical requirements.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Small Works - ITB Section I: Instructions to Bidders: Section I of an Invitation to Bid (ITB) for Small Works (Version 1.1, 2024). This document provides the Instructions to Bidders, covering the scope of the bid, interpretation of the ITB, amendment processes, and detailed bidder eligibility requirements, including conflict of interest disclosures and UN-specific ineligibility lists.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sub-Project Site-Specific ESMP - Kunduz City Street Upgrading: Environmental and Social Management Plan (ESMP) dated 04 Oct 2026 for the upgrading of 1160m of concrete streets in District 8 of Kunduz City. The document outlines mitigation measures for air pollution, excavation/quarry impacts, social exclusion, and occupational health and safety (including concrete mixer safety), with monitoring responsibilities assigned to the Contractor HSSE Officer and UNOPS Safeguard Team.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sub-project Site-Specific ESMP - Malalai Clinic Upgrading: Environmental and Social Management Plan (ESMP) dated 18 Oct 2026 for the upgrading of Malalai Clinic Plum Concrete surface Street (530m) in District#9, Kandahar. The document outlines mitigation measures, monitoring methods, and frequencies for risks including noise pollution, waste contamination, and labor safety, with implementation by the Contractor HSSE Officer and monitoring by the UNOPS Safeguard Team.
PDF
PDF, High priority: read this firstsow
HighAI Summary for TOR - Upgrading of Malalai Clinic Plum Concrete surface Street (AF2-KDR-D9-SP01): Terms of Reference (TOR) dated 15-November-2026 for the Afghanistan Community Resilience and Livelihoods Project. The document defines the scope of works for upgrading a 530m plum concrete surface street in Kandahar city, including excavation, pavement construction, drainage systems, and labor-intensive works.
PDF
PDF, High priority: read this firstsow
HighAI Summary for TOR - Upgrading of Plum Concrete Surface Street in Kunduz City (AF2-KNZ-D8-SP01): Terms of Reference (TOR) for the upgrading of 880m of plum concrete surface streets at Boz-E-Shah Mahmood and Boz-E-Qandari in District 8, Kunduz City. Part of the World Bank-funded Afghanistan Community Resilience and Livelihood Project (CRLP) delivered via UNOPS. The scope includes excavation, subgrade construction, plum concrete pavement, PCC side ditches, and installation of steel grills.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UNOPS Afghanistan Small Works Specification Rev 8: Technical specifications for small works in Afghanistan (Rev 8, Feb 2026). The document outlines detailed requirements for concrete (Series 5000), reinforcement (Series 6000), and general provisions (Section 1100), including work programmes, quality control, and site management.
Description Tender description: ITB for Upgrading of Plum concrete Surfaces in district 9 of Kandahar and district 8 of Kunduz city (2 lots) - Afghanistan.IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/GuidesInterested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.