This Solicitation opportunity from Louisiana was posted on October 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ITQ - NOAB - Fence Repair
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves providing labor, materials, and equipment necessary for fencing repair and installation on or within NOAB properties, including gates, barriers, and surface restoration. The scope encompasses tasks such as repair, removal, and installation of various fencing types like chain link, vinyl, wood, and concrete, with an emphasis on safety, compliance with codes, and quality standards. The contractor must be experienced, with at least three years of relevant service, and capable of responding to emergency repair requests within two hours. Work includes demolition, site clearing, and the use of manual and mechanical equipment like post drivers and backhoes, with all debris properly removed and area safety maintained through signage and barricades. The contractor is responsible for verifying quantities before work begins and ensuring no damage occurs to surrounding areas. All repairs and parts are covered under warranty, with free replacements if failures occur during the warranty period. The project requires the contractor to supply all necessary labor, materials, and equipment, and to coordinate scheduling with the NOAB Airfield Maintenance Department for non-emergency services. Safety, cleanliness, and adherence to technical specifications are critical, with the contractor also responsible for posting safety signs and ensuring secure work zones. The contract is valued between $500,000 and $2,000,000 and is managed by the City of New Orleans, Louisiana.
General Info
Place of Performance
LA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Construction equipment to be used includes manual post-driver or backhoe with mechanical post-driver and other manual labor construction equipment. Construction materials include fence posts, designated linear feet of fencing, mesh, wire ties and possible cement used to set posts.
CONTRACTORS Contractors shall be qualified to construct, install, maintain, alter, extend or repair fencing (that may include wood, chain link, vinyl, pre-cast concrete, and other various materials). Repairs and services made by the Contractor shall be done so in compliance with safety, zoning and building codes. Please see Exhibit 1 – Technical Specifications, for further details on material requirements.
SPECIFICATIONS Repairs, replacements and parts are to include, but shall not be limited, to chain link, vinyl, wood and stockade fencing. The Contractor must be able to be provided all types of fencing used on the airfield. Any part, repair or replacement failures during the warranty period will be replaced at no cost to the NOAB. The successful Contractor shall have no less than 3 -years of experience providing prompt service, installation, and repair. The Contractor’s service facility shall be located within 50 miles of the airport. All emergency repair and/or replacements requests must be responded to within two (2)-hours unless otherwise expressly by the NOAB. The NOAB Airfield Maintenance Department shall contact the Contractor to schedule non-emergency repair services.
Services required involve the installation of chain link fences and the repair of existing chain link fence on NOAB which may be partially buried up to 24 inches. Work to be completed include, but are not limited to, demolition, site clearing, and removal of any encumbrances that obstruct the installation. The Contractor shall supply all labor, material, and equipment to complete requested fence services.
The Contractor shall clean up the area where the work was performed and Contractor shall remove any debris generated by any fence work performed from NOAB premises. At no time, will the Contractor discard debris into any NOAB trash bins/containers.
The Contractor shall post safety signs and barricades as required to ensure work areas are secure and safe at all times.
Contractor shall field verify all quantities to be used prior to initiating work. Contractor shall be responsible for any damage caused towards other areas during the completion of fence repair work.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
