J-133 Laboratory Replacement at Plant No. 1

Active
J-133 OutreachState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation by the Orange County Sanitation District (OC SAN) for Project J-133 entails the demolition of the existing commercial office building at Plant No. 1 and the construction of a new, state-of-the-art 56,000 square foot Central Laboratory. The project will be delivered using a Progressive Design-Build (PDB) approach, with the Guaranteed Maximum Price (GMP) established at around 60% design completion. The overall budget is approximately $99 million, with the procurement process following a best value selection methodology aimed at identifying the most qualified design-build team based on a combination of technical merit and proposed pricing, particularly for Phase 1 services involving staff rates and fees. RFP issuance is anticipated in the first quarter of 2026, with construction scheduled to commence in the second quarter of 2028 and an expected duration of 31 months. Key contract requirements include demonstration of significant experience by the Design-Build team, including prior leadership on at least two similar laboratory projects by the Design-Builder and two comparable projects by the Lead Design Firm, plus extensive involvement of subconsultants with laboratory project experience. The selected team must provide a complete package including demolition, design, construction, and commissioning of the facility along with all furniture, fixtures, equipment, and specialized laboratory instrumentation. Commissioning of all building systems and equipment is mandatory prior to occupation, supported by comprehensive warranty coverage for a full year covering workmanship and materials. The contract incorporates local government standards and California Public Contract Code provisions for dispute resolution and change management, with change orders limited primarily to owner-directed modifications or unforeseen site conditions after GMP establishment. Ownership of all design documents resides with OC SAN who retains the right to use and modify these materials. Third-party consultants including geotechnical, hazardous materials, and commissioning specialists are required as part of the project team. The solicitation is supported by clear points of contact and emphasizes thorough team qualifications, project understanding, and adherence to a detailed schedule to ensure successful delivery of this critical infrastructure upgrade.

General Info

Demolition and construction of 56,000 sq ft lab via Progressive Design-Build, $99M GMP, 31-month schedule.

Agency

California → Orange County Sanitation DistrictView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(2)

J-133 Industry Forum Presentation for Laboratory Replacement Project

PDF26 pagesindustry-day

J-133 Laboratory Replacement Industry Forum Attendance Record

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Orange County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Orange County Sanitation District
View Agency Profile
Office AddressN/A
Contacts
Diane Marzano

Full Description

Show more
The project will replace the existing Central Laboratory Building at Plant No. 1. The project includes the demolition of the existing commercial office building and the construction of a new 56,000 square foot laboratory in its place. This project will be delivered using the Progressive Design-Build method.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project in Marina, California. The scope of work involves extensive upgrades to the facility, including the replacement of digester gas piping, safety equipment, and roof hatches, as well as concrete repairs and recoating of the digester building. Key technical installations include new level measurement devices, five owner-furnished linear generators, biogas conditioning equipment, an RNG upgrading system with a pipeline to the PG&E injection station, and a transition from a steam boiler to a heating water boiler and hydronic system. Additionally, the project requires the replacement of waste gas flares and the demolition of the existing Cogen facility. The solicitation is open to firms under various NAICS codes, including 237310, 238110, 238120, 238190, 238320, 238220, and 238210. Interested parties must request access to the full project documentation by emailing estimating@gseconstruction.com. The response deadline for this opportunity is August 20, 2026. The project also recognizes certifications for Disadvantaged Business Enterprises, Minority Business Enterprises, and Woman Business Enterprises.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 6 days
View Details

More opportunities from California → Orange County Sanitation District

Same awarding agency