Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J-143 PDB PROJECT OUTREACH AND SAMPLE PDB CONTRACT

Closed
J-143 PDB OUTREACHState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

OC San is pursuing the implementation of a Biosolids Deep Well Injection System (BDWIS) at Plant No. 1 and Plant No. 2 to establish a sustainable and long-term biosolids management solution. Presently, more than 500 wet tons per day of dewatered biosolids are transported long distances for land application and composting, a practice under increasing regulatory scrutiny and with uncertain future availability of out-of-state disposal capacity. The BDWIS technology, which involves injecting biosolids deep underground into porous geological formations well below multiple impermeable layers, offers a proven alternative that isolates contaminants, reduces transportation emissions, and creates potential carbon credit opportunities. This approach is supported by successful analogs such as the Los Angeles Sanitation District's Terminal Island Renewable Energy project. To execute this, OC San intends to use a Progressive Design-Build (PDB) contract strategy, engaging a Design-Builder early to collaboratively refine design, permitting, cost estimates, and risk mitigation ahead of agreeing on a Guaranteed Maximum Price. Additionally, an Owner’s Advisor with specialized expertise in deep well injection and regulatory permitting, including CEQA compliance, will be retained for the project duration. A planning study completed in 2025 confirmed the technical feasibility of BDWIS at Plant No. 1, identifying suitable injection zones within the Repetto Formation with adequate containment layers and providing preliminary injection capacity and budgetary cost estimates. However, the study was intended solely to inform program development and budgeting and does not limit or replace subsequent analyses and proposals from the Design-Builder. The solicitation titled "J-143 PDB PROJECT OUTREACH AND SAMPLE PDB CONTRACT" was issued on February 5, 2026, with a response deadline of April 1, 2026. The project is managed by OC San in Fountain Valley, California, with contact handled through the Contracts/Purchasing Technician, Monica Sanchez. The overall initiative reflects OC San’s commitment to modernizing biosolids management via advanced, environmentally responsible technology integrated through collaborative project delivery.

General Info

OC San pursues deep well injection biosolids system using Progressive Design-Build contract.

Documents

1
PDF, High priority: read this first161 pages · contract-document
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
  • Lift Station No. 85 ReplacementOpen now, due in 23 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement
Contacts1 person available
OfficeFountain Valley, CA, 92708, USA
Organization / AgencyCalifornia → Procurement
Office AddressFountain Valley, CA, 92708, USA

Interested Companies (13)

Black & VeatchHouston, Texas
Brierley AssociatesEast Syracuse, NY
Brown and CaldwellSan Diego, California

See All 13 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
PROJECT BACKGROUND OC San seeks to implement a Biosolids Deep Well Injection System (BDWIS) to provide a sustainable, long-term biosolids management solution for Plant No. 1 and Plant No. 2. Currently, OC San produces over 500 wet tons per day of dewatered biosolids, which are transported up to 280 miles to land application and composting sites in California and Arizona. This practice is increasingly vulnerable to potential regulatory changes, including restrictions on the beneficial reuse of biosolids. Additionally, the long-term availability of out-of-state management capacity is uncertain. Deep well injection (DWI) offers a proven alternative, permanently sequestering biosolids into deep, porous geologic formations more than 5,000 feet below ground and beneath multiple impermeable layers. This approach effectively isolates persistent contaminants, reduces transportation-related greenhouse gas emissions, and supports opportunities for carbon credit generation. The Los Angeles Sanitation District's Terminal Island Renewable Energy (TIRE) project has demonstrated the viability of similar technology for more than a decade. OC San intends to deliver the BDWIS through a Progressive Design-Build (PDB) contract, engaging a Design-Builder early to collaboratively develop the design, manage permitting, refine cost estimates, mitigate risks, and plan construction prior to establishing a Guaranteed Maximum Price (GMP). An Owner's Advisor (OA) will also be contracted for the project duration to provide technical expertise in the subject matter of deep well injection including EPA Class V permitting, as well as progressive design-build project delivery. In addition, the OA will provide professional services for California Environmental Quality Act (CEQA) permitting. OC San has completed a planning study in 2025 that supports the technical viability of BDWIS at Plant No. 1. The study has identified suitable geological conditions within intervals of the Repetto Formation for injection including sufficient confining and containment layers. Preliminary assessments of injection capacity and volume have been provided along with budgetary costs for a full-scale facility. The planning study purpose is to inform OC San for program development and budgeting purposes and shall not constrain nor be relied upon by the Design-Builder in developing further independent analysis, investigations, concepts, or proposals.

More opportunities from California → Procurement

Same awarding agency

NAICS: 561210
New
SLED
Stationary Engineering Services
Solicitation # 2026-10
The Transbay Joint Powers Authority (TJPA) has issued Invitation for Bids (IFB) No. 2026-10 for Stationary Engineering Services to maintain the Salesforce Transit Center, Salesforce Park, and adjoining infrastructure. The objective is to ensure the facility remains in a state of good repair consistent with world-class public venues. The scope of work includes the operation, testing, and maintenance of critical building systems such as HVAC, plumbing, electrical, structural, physical security, and signage, as well as the management of mechanical plants including boilers and heat pumps. The contractor is responsible for providing all necessary supervision, labor, materials, and equipment to support a LEED Gold Certified building. The contract is intended for a five-year term with no options to extend, and the award will be granted to the lowest responsive and responsible bidder who meets all minimum qualifications. These qualifications include five years of experience in commercial stationary engineering services of similar scope within the last ten years, specifically within Northern California, and demonstrated operational capacity. Bids must be submitted in PDF format via the OpenGov portal by December 4, 2026, at 2:00 pm PT. Administrative requirements include electronic invoicing submitted to the TJPA Chief Financial Officer and payment terms within thirty calendar days. The contract is subject to USDOT requirements, including the Davis-Bacon and Copeland Anti-Kickback Acts, and requires both performance and payment bonds for 100 percent of the agreement price. Labor is subject to special prevailing wage determinations for stationary and utility engineers. There is no set-aside status for this solicitation.
Facilities Support Services

POSTED

about 23 hours ago

DEADLINE

in 20 days
View Details
NAICS: 331511
New
SLED
Manhole Frame & Covers for Warehouse Stock (Re-Bid)
Solicitation # JIT-2026-730BD-R
The Orange County Sanitation District (OC San) is seeking to establish a purchase order contract for the supply of sewer manhole frames and covers for warehouse stock. The contract has a term of up to ten years, with purchases made on an as-needed basis and no guaranteed usage. Deliveries are to be made to the Plant 1 Warehouse in Fountain Valley, California, with specific scheduling requirements for Monday through Friday. The scope includes the supply of gray iron or composite frames and covers that must comply with AASHTO M306 H25 and ASTM A48 Class 35-B standards. All products must be manufactured in the United States in accordance with Buy America laws, and manufacturers must provide ISO9001 certification and certified testing records. Technical specifications require frames and covers to be dip-painted with 6 mils of bituminous paint, with bolts coated in lubricant or anti-seize coating. Required markings include the OC San name and logo, and cast information such as the heat date, material type, and country of manufacture. Evaluation for the award is conducted in two phases. Phase 1 focuses on the qualifications of the firm and the proposed product's compliance with technical drawings and standards, each weighted at 50%. Phase 2 is based on the lowest cost. Proposers must submit a technical proposal, a cost file, and necessary certifications, including Iran Contracting Act verification and Buy America compliance documentation.
Iron Foundries

POSTED

3 days ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS