Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on April 30, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J--Emergency Power Supply System Generators Preventive Maintenance Service Northport VAMC

Awarded
36C24219Q0237Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

39 minutes ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 7 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This contract covers the preventive maintenance service for the Emergency Power Supply System Generators at the Northport VAMC. The pricing structure requires a grand total that encompasses the base year and four option periods, including not-to-exceed amounts of 25,000 dollars for labor and 25,000 dollars for parts. Bidders should disregard unit prices for primary Contract Line Item Numbers, ensuring the total amount reflects the sum of its sub-CLINs. Specifically, item 0014 requires an emergency labor rate per hour, which will be funded only when the government determines unscheduled repairs are necessary. The scope of work includes semi-annual and annual inspections, which must incorporate fuel, coolant, and oil sample analysis. While VA electricians will handle most connections to portable generators, the contractor is responsible for providing the 1000 kw portable generator for Building 200 at their own expense. All maintenance processes must adhere to The Joint Commission standards to maintain hospital certification, with compliance monitored by the Contracting Officer's Representative.

General Info

Agency

N/A

Contract Value

$201,726.02

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

NY, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Feb 7, 2019 to Feb 11, 2019. The notice description changed.

Notice updated

Response deadline changed from Feb 11, 2019 to Feb 15, 2019. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On the Solicitation page it asks to fill in box # 23&24, do we use the Grand total for the base and 4 option periods, or just the base year price? The Grand total should reflect the base year plus option year periods. Please include the (not to exceed) amount of $25,000 for labor rate and $25,000 for parts, base year and options years periods into the grand total amount of the contract. as for the pricing schedule item 0001 shows a unit price the the amount to the right of if and this is the same way all the way through from page 15 to 50 with a grand total price at the end. Shouldn't this just be amount since there is only one service being perform per year? Please disregard unit price. The amount should reflect the total amount of the sub-clin s. ex: for CLIN 0001 the amount will be the sum of 0001AA and 0001AB. Labor rate after hours (item 0014) do you want us to put down the labor rate per hour or the amount of hours that are covered by the $25,000.00 Labor rate per hour only. This CLIN shall be incorporated and funded when the Government has determined unscheduled repairs for parts and/or service is required and prior to performance of service. The Contractor shall be notified in a sufficient amount of time to facilitate completion of the unscheduled service and allow the Government to obtain the necessary repairs. Please include the $25,000 into the grand total amount of the contract. Still referencing the above line item. Is this labor rate to be normal operating hours? or emergency labor rate? Emergency labor rate. Shall be incorporated and funded when the Government has determined unscheduled repairs for parts and/or service is required and prior to performance of service. CLIN does this mean Contract Line Item Number? Yes line item 0016 state fuel sample analysis but in the contract it states that there is to be coolant and oil analysis samples as well. Fuel, coolant and oil samples should be part of the semi-annual and annual inspections. When we work at buildings 92,200,200n,203,210,212. who will be making the connections to from the temporary generator to the building when we are performing the annual maintenance? will it be the electricians at the VA or do we need to hire licensed electricians to make these connections? VA Electricians will be making all connections from the buildings to the portables generators. The VA electricians will supply the necessary portables with the EXCEPTION of B 200 / 1000 kw portable. That portable will be provided by the contractor at his / her cost. will there we sufficient space to park a temporary generator near each of these locations? do we need to provide flagmen or flag women to block the area off? do these areas require a fence to be installed around the generator? Parking for the portables will be made available by the VA Electrical Shop. TJC (The Joint Commision) is a certification that the hospital holds if a hospital losses this certification the hospital is not recognized a authorized hospital. How does this pertain to this contract? The outlined PM process in the contract comes from TJC standards. As long as the PM process is followed as outlined, we are good. The COR , will ensure that we are in compliance with TJC. No certification from any other entity is necessary. I have another question in regard to the maintenance contract, please see below, line item 0001 preventive maintenance service includes both the semi and annual with a unit price then a amount. line item 0001aa is a line item for semi annual inspection with unit price and line item line item 0001ab is a line item for annual inspection and preventive maintenance with a unit price and amount price. this continues through out the contract. Please disregard unit price for CLIN 0001. The amount should reflect the total amount of the sub-clin s. ex: for CLIN 0001 the amount will be the sum of 0001AA and 0001AB.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS