Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 8, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J--Installation of Wire Mesh. This amendment is to incorporate REVISED Statement of Work as below prescribed. You must acknoledge all amendments under this Solicitation to receive consideration.

Awarded
W912C3-09-T-0043Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, solicitation number W912C3-09-T-0043, involves performing physical security repairs at the USAR Army Reserve center in Ramey, Puerto Rico. The primary scope of work includes the installation of expanded metal grilles reinforced with galvanized pipes to secure windows, doors, and wooden louvers in specific storage rooms within Buildings 807 and 808. The project also requires covering metal windows and wall air conditioning units, with all metalwork receiving one coat of corrosive paint and two coats of enamel paint in a color selected by the owner. The contractor is required to designate a knowledgeable Project Supervisor and must adhere to Army Corps of Engineers specifications, industry standards, and OSHA safety regulations. Key operational requirements include a mandatory site visit to verify dimensions, daily removal of debris, and full financial responsibility for any damage caused to government property. This opportunity is designated as a Total Small Business Set-Aside under NAICS code 238390.

General Info

Contract Value

$16,872.8

NAICS

238390 - Other Building Finishing Contractors

Place of Performance

Army Reserve Contracting Center Fort Buchanan Bldg. 399, 218 Brook Street, Fort Buchanan PR 00934-4206 PR, PR, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Fort Buchanan (rc)
ContactsNo contacts available
OfficeFORT BUCHANAN, PR, 00934-4572, USA
Office AddressFORT BUCHANAN, PR, 00934-4572, USA
ContactsNo contact information available

Full Description

Show more
PERFORMANCE WORK STATEMENT (Revised 8 Sep 2009) DESCRIPTION OF WORK: The project consist of performing additional repairs to correct physical security deficiencies at USAR Army Reserve center in Ramey, PR. Work included in the project is described in the detail description of work and as shown in contract drawings. Work includes: Secure existing windows in storage rooms with the installation of new expanded metal grilles, reinforced with 1 x 1 galvanized pipes as per detail in drawings, to cover existing doors and wooden louvers at selected locations in Bldg 807 and 808. In addition, cover existing metal windows and wall air conditioning units. Drawings will specify inner or outer installation of expanded metals. All metal grilles shall be painted with one coat of corrosive paint and two coats of enamel paint (Color to be selected by owner). Apply spot paint in areas damage by construction with same color paint. DETAILED DESCRIPTION OF WORK: The required work is as follows: The description of the required work herein and on the plans is general in content. The Contractor shall visit the project area and meet with the Contracting Officer (CO) or his/her Representative (COR) to assess and define precisely the extent of the required work and to verify project site dimensions and sizes. Iron grilles protection in windows, doors and woven louvers walls along corridors 1. Window grilles of 9-6 x 5-2 reinforce with 1x 1 and expanded metal as per details in sheet A-1. a. Bldg 807- Storage Rooms- 112, 227, 229, 306, 308, 310 and 317. b. Bldg 808- Storage Rooms-215, 219, 221, 229, 230, 312, 315,329,330 and 332. Note: Grille System to protect window A/C units shall be similar to existing system at project site. 2. Grilles of 7-9 x 10-0 reinforce with 1x 1 galvanized metal and expanded metal including wooden louvers and doors of 3-0 x 7-9 as per detail in sheet A-1. a. Bldg 807- Storage rooms- 112 and 317. b. Bldg 808- Storage rooms- 219,221 and 312. STANDARS: The Contractor shall meet the Armys Corps of Engineers specifications guidance and industry standards in material and workmanship for the quality of the finished work. PROJECT SUPERVISOR (PS): The Contractor shall designate a Project Supervisor responsible for all aspects of the projects work. The Project Supervisor shall be knowledgeable in standard construction practices and with the authority to make decisions demanded by the project. GOVERNMENT PROPERTY: The Contractor shall be responsible for any damage to Government property and shall make all necessary repairs at no cost and to the satisfaction of the Government. SAFETY: The Contractor shall consider, apply, and comply with all applicable safety requirements stated in OSHA Standards 29 CFR 1910 & 1926 - General Industry and Construction http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 ) and with the Corps of Engineers EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL (http://www.usace.army.mil/CESO/Pages/EM385-1-1,2008new!.aspx). WORK EXECUTION: No work shall commence without the authorization of the Contracting Officer. Rubbish and debris generated as part of this project shall be removed from the Installations premises on a daily basis and disposed of at an approved facility designed for this purposes. (End of Summary of Changes)

More opportunities from Department Of Defense → W6QM Micc-Fort Buchanan (rc)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS