Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 27, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J -- Repair & Refurbishment of C-5 Aircraft Tail Stand

Closed
Reference-Number-DoverAFBTailStandNotice2006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 8 hours ago

DEADLINE

in about 2 months

General Info

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Dover AFB DE 19902, DE

Set-Aside

NONE

Documents

1

20061211130055.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Dec 27, 2006 to Jan 4, 2007.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4497 436 Cons Lgc
ContactsNo contacts available
OfficeDOVER AFB, DE, 19902-5016, USA
Office AddressDOVER AFB, DE, 19902-5016, USA
ContactsNo contact information available

Full Description

Show more
MARKET RESEARCH QUESTIONNAIRE FOR REPAIR AND REFURBISHMENT OF C5 TAIL STANDS. Dover Air Force Base requires repair and refurbishment of one empennage platform (tail stand) designed to service the tail components of a C-5A aircraft. The tail stand is a 70-ton (approximate), 70-foot tall, self-propelled lattice structure comprised of square tubing weldments. The main structural members are four leg columns joined by bolting to structural fixed deck supports. The structure is arranged to envelop the tail of the aircraft and provide six work levels, all connected by stairs and serviced by a 1000-pound capacity elevator. The sixth work level provides access to the horizontal stabilizer. Each work level consists of a fixed deck that houses a set of sliding deck panels that are manually pulled out to close the gap between the edge of the fixed deck and the vertical stabilizer. The stand is also equipped with a 1000-pound capacity jib crane, a 1000-pound capacity traveling hoist on an I-beam, and four stabilizing jacks. The tail stand is supported by four two-wheel axles: two fixed axles are powered by a hydrostatic drive, and two steered axles are un-powered. A 107 HP, 2800-RPM gasoline engine provides the power to drive and steer the stand at 2 mph in still air and at a slower speed against 40 mph wind. The nominal working pressure of the hydraulic system is 2000 psi. When in position around the tail, the elevator, jib crane, and the hoist are powered through an electric cable from the hangar power source. 1. Is refurbishment and modification of this type customarily available in the commercial market? If not, can the it be modified to fit the requirement or does the requirement need to be modified. 2. What type of quality standards are there? 3. Is there normally contract financing? What is the standard? 4. Methods of contracting for this service, i.e., FFP, time and materials, cost etc.? 5. Is a quality control plan normally required to be submitted? 6. What method of surveillance is used by your customers? 7. What type of performance standards are used to indicate acceptance/unacceptable performance levels? 8. What type of remedies are used for nonconforming services? 9. Do you own or have access to large equipment such as cranes for this type of project? 10. It is anticipated that the painting of the stand will need to be done offsite and possibly sandblasting because of the containment requirement due to the chromium in the paint. Do you have the facilities for this? MARKET RESEARCH QUESTIONNAIRE FOR REPAIR AND REFURBISHMENT OF C5 TAIL STANDS Thank you for your participation. Please take a few moments and tell us about your company. A. Company Name: B. Point of Contact: C. Business Size (small, large): D. Socioeconomic status (woman-owned, 8a, etc.): E. Capabilities narrative:

More opportunities from Department Of Defense → FA4497 436 Cons Lgc

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS