36C24118Q0156 Page 1 of Page 7 of 22 Page 1 of (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. (ii) The solicitation number is 36C24118Q0218 and the solicitation is issued as a request for quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-97. (iv) This requirement is being issued as a total small business set-aside. The associated NAICS code is 238290; Other Building Equipment Contractors and small business size standard is $15 million. (v) The Government intends to award a firm-fixed priced award for 12 months (05/01/2018-04/30/2019) with 4 Option Years. The Contractor shall provide all equipment, supplies, parts, tools, and labor to perform regular preventative maintenance and 24 hour emergency service repair (including emergency call back) of the vertical transport systems at the VA Medical Center in White River Junction, VT located at 215 North Main Street. Please see the attached Performance Work Statement, Price Schedule and Evaluation below for full requirement details and pricing submission. ITEM INFORMATION ITEM # DESCRIPTION OF SUPPLIES/SERVICES Qty UNIT UNIT PRICE AMOUNT 0001 The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at White River Junction VAMC per the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel. Contract Period: Base POP Begin: 05-01-2018 POP End: 04-30-2019 12.0 MO ________________ _____________ 0002 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during regular business hours. Contract Period: Base POP Begin: 05-01-2018 POP End: 04-30-2019 30.0 HR __________________ __________________ 0003 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during non standard business hours, weekends and holidays. Contract Period: Base POP Begin: 05-01-2018 POP End: 04-01-2019 10.0 HR __________________ __________________ 0004 The contractor shall provide parts as needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. ($5,000.00 Est will be added for the year. ) The contractor shall provide maximum _____20___% markup for parts. Contract Period: Base POP Begin: 05-01-2018 POP End: 04-30-2019 1.00 YR __________________ __________________ 1001 The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at White River Junction VAMC per the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel. Contract Period: Option 1 POP Begin: 05-01-2019 POP End: 04-30-2020 12.0 MO __________________ __________________ 1002 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during regular business hours. Contract Period: Option 1 POP Begin: 05-01-2019 POP End: 04-30-2020 30.0 HR __________________ __________________ 1003 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during non standard business hours, weekends and holidays. Contract Period: Option 1 POP Begin: 05-01-2019 POP End: 04-30-2020 10.0 HR __________________ __________________ 1004 The contractor shall provide parts as needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. ($5,000.00 Est will be added for the year. ) The contractor shall provide maximum _____20___% markup for parts. Contract Period: Option 1 POP Begin: 05-01-2019 POP End: 04-30-2020 1.00 YR __________________ __________________ 2001 The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at White River Junction VAMC per the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel. Contract Period: Option 2 POP Begin: 05-01-2020 POP End: 04-30-2021 12.0 MO __________________ __________________ 2002 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during regular business hours. Contract Period: Option 2 POP Begin: 05-01-2020 POP End: 04-30-2021 30.0 HR __________________ __________________ 2003 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during non standard business hours, weekends and holidays. Contract Period: Option 2 POP Begin: 05-01-2020 POP End: 04-30-2021 10.0 HR __________________ __________________ 2004 The contractor shall provide parts as needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. ($5,000.00 Est will be added for the year. ) The contractor shall provide maximum _____20___% markup for parts. Contract Period: Option 2 POP Begin: 05-01-2020 POP End: 04-30-2021 1.00 YR __________________ __________________ 3001 The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at White River Junction VAMC per the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel. Contract Period: Option 3 POP Begin: 05-01-2021 POP End: 04-30-2022 12.0 MO __________________ __________________ 3002 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during regular business hours. Contract Period: Option 3 POP Begin: 05-01-2021 POP End: 04-30-2022 30.0 HR __________________ __________________ 3003 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during non standard business hours, weekends and holidays. Contract Period: Option 3 POP Begin: 05-01-2021 POP End: 04-30-2022 10.0 HR __________________ __________________ 3004 The contractor shall provide parts as needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. ($5,000.00 Est will be added for the year. ) The contractor shall provide maximum _____20___% markup for parts. Contract Period: Option 3 POP Begin: 05-01-2021 POP End: 04-30-2022 1.00 YR __________________ __________________ 4001 The Contractor shall provide all labor, materials, and equipment to perform full elevator preventative maintenance and repairs at White River Junction VAMC per the PWS. Services are inclusive of maintenance, repairs, after hours coverage, emergency calls and travel. Contract Period: Option 4 POP Begin: 05-01-2022 POP End: 04-30-2023 12.0 MO __________________ __________________ 4002 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during regular business hours. Contract Period: Option 4 POP Begin: 05-01-2022 POP End: 04-30-2023 30.0 HR __________________ __________________ 4003 The Contractor shall provide all labor, materials and equipment to perform 3rd party damage repairs or installation of new equipment not covered in the preventative maintenance during non standard business hours, weekends and holidays. Contract Period: Option 4 POP Begin: 05-01-2022 POP End: 04-30-2023 10.0 HR __________________ __________________ 4004 The contractor shall provide parts as needed for elevator repairs or installation. A supplier quote shall be furnished with the invoice. ($5,000.00 Est will be added for the year. ) The contractor shall provide maximum _____20___% markup for parts. Contract Period: Option 4 POP Begin: 05-01-2022 POP End: 04-30-2023 1.00 YR __________________ __________________ GRAND TOTAL __________________ (vi) The contractor shall provide all equipment, supplies, parts, tools, and labor to perform regular preventative maintenance and 24 hour emergency service repair (including emergency call back) of the vertical transport systems at the VA Medical Center in White River Junction, VT located at 215 North Main Street. (vii) The Place of Performance is the White River Junction VAMC, 215 North Main Street, White River Junction, VT 05009. The period of performance shall be 12 months with one 4 Option Years. (viii) Provision at 52.212-1, Instructions to Offerors Commercial (JAN 2017), applies to this acquisition in addition to the following addenda s to the provision: 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998); 52.216-1 Type of Contract (APR 1984); 52.217-5 Evaluation of Options (JUL 1990); 52.233-2 Service of Protest (SEPT 2006); 852.215-70 Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors (JUL 2016) (DEVIATION); 852.233-70 Protest Content/Alternative Dispute Resolution (JAN 2008); 852.233-71; Alternate Protest Procedure (JAN 1998); 852.270-1 Representatives of Contracting Officers (JAN 2008); (ix) Provision at 52.212-2, Evaluation -- Commercial Items, applies to this requirement. Submission of Quotes: (1) Quotes shall be received on or before the date and time specified in Section (xv) of this solicitation. We will not consider any quote that we receive after the deadline unless we receive it before we issue a purchase order; it is in the best interest of the Government and considering it will not delay our purchase. (2) Quotes shall be submitted electronically via email to
contact@example.gov . (3) Quote Format: The submission should be clearly indexed and logically assembled in order of the evaluation criteria below. The Contractor shall include its company name, address, DUNS and Cage Code. (4) Site Visit - A site Visit is scheduled for Monday, 03/12/2018 at 9:30 A.M. Please send an email to
contact@example.gov if you plan on attending; the meeting location will be VAMC White River Junction, meet at Building 37. Any potential changes to the performance work statement or questions, noted during the site visit must be submitted in writing by the question due date. The Contracting Officer is the only person that is authorized to change the requirement via an amendment to the RFQ. (5) Questions shall be submitted to the Contract Specialist in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is 03/15/2018 at 5:00 PM EST. Questions received after this date and time may not be answered. Questions will be answered in a formal amendment to the solicitation so all interested parties can see the answers. (6) Evaluation Process: Award will be made to the best value, as determined to be the most beneficial to the Government. Please read each section below carefully for the submittals and information required as part of the evaluation. Failure to provide the requested information below shall be considered non-compliant and your quote could be removed from the evaluation process. Quotes shall be evaluated under FAR Part 13.106-2(b) -- Evaluation of Quotations or Offers. After the evaluation of quotes, the Contracting Officer may negotiate final terms with one or more quoters of the Government s choice before issuing a purchase order. The Government will not use the formal source selection procedures described in FAR Part 15. The Contracting Officer may issue a purchase order to other than the lowest priced quoter. The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes: Price: The Vendor shall complete the Price Schedule (attached) with proposed contract line item prices inserted in appropriate spaces. Past Performance: Provide (3) references of work, similar in scope and size with the requirement detailed in the Performance Work Statement. References must include contact information; brief description of the work completed, and contract # (if relevant). Please utilize Attachment 3 Past Performance Worksheet for your references and please submit as part of your quote submission. References may be checked by the Contracting Officer to ensure your company is capable of performing the Statement of Work. The Government also reserves the right to obtain information for use in the evaluation of past performance from any and all sources to include PPIRS. Technical: The vendor s quote shall be evaluated to determine if the organization has the experience and capabilities to provide the requested services in accordance with the Performance Work Statement in a timely efficient manner. Contractor shall demonstrate its corporate experience to meet all requirements stated in the Performance Work Statement to include its experience on all units listed in Attachment 1. The Contractor shall submit OSHA-10 certification for technician performing the maintenance at White River Junction VAMC. The Contractor shall demonstrate how it will respond at the facility within three hours of service calls. If you are planning to sub-contract some or all of this work, please provide the name and address(s) of all subcontractor(s) (if applicable) and a description of their planned subcontracting effort and experience. Options: Except when it is determined in accordance with FAR 17.206(b) not to be in the Government s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). The Government will evaluate prices for the option under FAR 52.217-8 by using the last year s option prices to calculate the price for six months of effort, and adding that amount to the base and other option years to arrive at the total. (x) Please include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with your offer via the SAM.gov website or a written copy. Unless exempted by the Contracting Officer, you must register in SAM before we will issue a purchase order to you. If you do not register by the date set by the Contracting Officer, the Contracting Officer might issue the order to a different quoter. Once registered, you must remain registered throughout performance until final payment. Go to https://www.acquisition.gov for information on SAM registration and annual confirmation. (xi) Clause 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition in addition to the following addenda s to the clause: 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (APR 2014); 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011); 52.228-5 Insurance-Work on a Government Installation (JAN 1997); 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), 852.203-70 Commercial Advertising (JAN 2008), 852.215-71 Evaluation Factor Commitments (DEC 2009; 852.232-72 Electronic Submission of Payment Requests (NOV 2012); 852.237-70 Contractor Responsibilities (APR 1984). SUPPLEMENTAL INSURANCE REQUIREMENTS In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract: (a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (b) General Liability: $500,000.00 per occurrences. (c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage. (d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage. 52.217-8 -- Option to Extend Services (Nov 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 10 days of contract expiration. (End of Clause) 52.217-9 --Option to Extend the Term of the Contract (Mar 2000) (a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension. (b) If the Government exercises this option, the extended contract shall be considered to include this option clause. (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 Years and 6 Months. Subcontracting Commitments - Monitoring and Compliance This solicitation includes FAR 52.219-14 and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the contract. To that end, the support contractor(s) may require access to the contractor's business records or other proprietary data to review such business records regarding contract compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments. (xii) Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition and in addition to the following FAR clauses cited, which are also applicable to the acquisition: 52.203-6, Restrictions on Subcontractor Sales to the Government (SEPT 2006); 52.204-10, Reporting Executive Compensation & First-Tier Subcontract Awards (OCT 2016); 52.204-14, Service Contract Reporting Requirements (OCT 2016); 52.209-6, Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015); 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) ; 52.219-8, Utilization of Small Business Concerns (NOV 2016), 52.219-14 Limitations on Subcontracting (JAN 2017) ; 52.219-28 Post Award Small Business Program Representation (JUL 2013); 52.222-3, Convict Labor (JUNE 2003); 52.222-21, Prohibition of Segregated Facilities (APR 2015); 52.222-26, Equal Opportunity (SEPT 2016); 52.222-35, Equal Opportunity for Veterans (OCT 2015); 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014); 52.222-37, Employment Reports on Veterans (FEB 2016); 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010); 52.222-50, Combating Trafficking in Persons (MAR 2015); 52.222-54, Employment Eligibility Verification (OCT 2015); 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016); 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011); 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008); 52.232-33, Payment by Electronic Funds Transfer System for Award Management (JUL 2013); 52.242-5, Payments to Small Business Subcontractors (JAN 2017); 52.222-41, Service Contract Labor Standards (MAY 2014); 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014); 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014); 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015); 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017); (xiii) All contract requirement(s) and/or terms and conditions are stated above. (xiv) The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this requirement. (xv) RFQ responses are due 03/23/2018 at 12:00 PM EST. RFQ responses must be submitted via email to:
contact@example.gov. Hand deliveries will not be accepted. Submissions after the deadline may not be considered. (xvi) The POC of this solicitation is Stefanie Carter (
contact@example.gov). PERFORMANCE WORK STATEMENT Elevator Maintenance and Repair VAMC WRJ 1.0 INTRODUCTION The contractor shall provide all equipment, supplies, parts, tools, and labor to perform regular preventative maintenance and 24 hour emergency service repair (including emergency call back) of the vertical transport systems at the White River Junction VAMC; 215 North Main Street, White River Junction, VT 05009 2.0 DEFINITIONS/ACRONYMS Engineer (ing) - Supervisor or designee. CO: Contracting Officer COR: Contracting Officer's Representative. WHEN (business hours): Weekends, Holidays, Evenings, and Nights. (Anytime outside of Normal Business Hours and Federal Holidays (Monday-Friday 7:00am-4:30pm) ESR: Engineering Service report document containing a summary of the services rendered as outlined under the terms and conditions of the contract. Authorization Signature: COR signature; indicates work status is accepted as stated in ESR. VAMC - Department of Veterans Affairs Medical Center. 3.0 SCOPE 1. The scope of work includes full maintenance and repair of the existing vertical transport systems during normal working hour Mon.-Fri. 7am-4:30pm, with after-hours availability at the VA Medical Center, White River Junction, VT to limit impact to patient care. When the services are required, the Contractor shall be notified by the VA Medical Center to mobilize for their maintenance and repair services as outlined in this PWS. 2. Work under this contract shall include the following items: a) Scheduled preventative maintenance. The Contractor shall provide a full preventative maintenance program for all vertical transport systems, including weekly inspections. b) Mobilize service for operational problems not resolved as part of the preventative maintenance program during normal working hours from 7:00am-4:30pm. c) Mobilize 24 hour, 7 days a week emergency call back service as needed. d) Periodic testing. e) Corrective service identified during inspections and preventative maintenance. f) Provide all resources required in performing maintenance and repair services including: supplies, parts, materials, lubricants, hydraulic fluids, cleaning fluids, equipment tools, shipping, travel, programming, diagnostics, testing (of associated work) and labor. g) Provide 24/7 contact phone number and account numbers. NOTE: It is anticipated that due to the nature of the elevator maintenance agreement, any work (part installation/repair) that affects the performance of the elevators, which is not included in the PWS, may be added through a bilateral contract modification. 4.0 EQUIPMENT LIST See Attachment 1 5.0 PERFORMANCE REQUIREMENTS 1. All scheduled service work shall be completed during normal hours (7am-4:30pm) as well as WHEN hours when notified and approved by the VA Medical Center. Once a service call has been initiated by VA staff, a Technician shall arrive no later than 3 hours after the service call has been made unless otherwise agreed by the VA COR. 2. All travel cost associated with this contract shall be included in the contract cost. Additional cost will not be provided for any work. 3. The contractor shall be responsible for all: parts, materials, lubricants, hydraulic fluids, cleaning fluids, equipment tools, shipping, travel, programming, diagnostics, testing (of associated work) and labor required to perform all the services as outlined in this PWS. 4. All tools shall be kept in the contractor s eye contact at all times. When workers are taking breaks or leaving the site, the tools shall be removed and stored in a safe place. All parts and supplies shall be stored in metal cabinets in the elevator mechanical room. 5. During regularly scheduled inspections, the contractor shall determine the nature and extent of any trouble and shall take necessary action to restore the elevators to satisfactory and safe service. The contractor shall use preventive maintenance methods to ensure parts are installed prior to their breakdown point where possible as needed to keep the elevators in the best possible running order at all times. 6. At no time shall the vertical transport systems be left in trouble mode for a period of longer than 8 hours (starting once technician arrives) unless approved by the COR. No system shall be left out of service at the end of a workday, or over a weekend without permission from the VA. All devices, equipment, switches, etc., shall be verified that they are enabled and reset prior to end of workday. Within 10 days of contract award the contractor shall provide a quality management (QM) plan, outlining how they will determine that the system is left in working order once service has been completed. 7. If the contractor cannot resolve any issues with the vertical transport systems within 8 hours, an action plan must be written and forwarded to the COR for review and approval. This action plan shall contain the following information: summary of the problem, why the problem can t be fixed in allotted time, expected date and time of when the problem will be resolved. Insufficient labor shall not be a valid reason of why the work has not been completed. 8. The contractor shall have on hand a supply of spare parts sufficient for expedited repairs of the vertical transport systems. 9. Unlimited service calls shall be provided 24 hours a day, 7 days a week, for repairs associated with: equipment failures (replacement of devices and damaged equipment), vertical transport systems not functioning properly and upgrading equipment that is beyond its useful life. Contractor is responsible for all costs of material and parts needed to repair any problem that arises with any fault or failure of systems excluding evident damage caused by misuse. 10. The elevator maintenance contractor shall be present and assist during the semi-annual inspections and 5 year tests of the elevators. The VA will be responsible for the third party Contractor inspector. 11. All Technicians working on the vertical transport systems shall wear and use the required safety PPE (personal protection equipment) as OSHA states for the hazards associated with the work being conducted. Any questions related to safety shall be directed to the COR for resolution through the on station Safety Manager. 12. Contractor is responsible for replacement of all light bulbs, including lights in elevators shaft on top and bottom of cars, hoistway crawl spaces, and elevator machine room. LED lighting will be used if possible. 13. During regular scheduled preventative maintenance visits, the Contractor shall retrieve any objects such as keys, wallets, glasses, etc. dropped in the elevator pit by occupants of the building. Such objects shall be turned over to the VA Police personnel. 14. A key for locked areas will be provided by the COR of the project or Police Services (during WHEN hours) upon notification form the service technician. 15. The contractor shall immediately notify the COR of any condition discovered that could result in extended duration of disrupted service. If the Technician notices a component that is close to failure and not associated with the service call for which they were mobilized, the problem shall be immediately resolved and or addressed. 16. The ESR that is generated for each service call is to be submitted to the COR for review and record within 24 hours of completing the service call. This 24hour constraint is only applicable during working hours, and is not expected to be completed during WHEN hours. 17. All equipment, materials, installation, and maintenance shall meet or exceed the minimal requirements set forth by ASME, OSHA, NFPA, and VA codes and conforming to the following codes: a) ASME A17.1 , 17.2, 17.3, and 17.4 b) NEIT Vertical Transportation Standards for Elevators, Escalators, and Dumbwaiters, latest edition. c) NFPA: 70, 70E, 72, 99 and 101 d) National Electric Code (NEC), latest edition e) Manufacturer s requirement and specification on inspection, maintenance and operation of each equipment/system model. 18. Upon arriving at the Medical Center the Contractor (Elevator Technician) shall sign in at building 37 (FMS Building) during normal business hours. The Contractor shall obtain a contractor badge and an escort to the location requiring the service. The Contractor shall check out and return the contractor badge upon completion of the service. Additionally, the Contractor shall obtain a VA PIV Contractor badge within 2 months from award for designated onsite mechanics. 19. During WHEN hours the contractor shall check in with Administrative Officer on Duty (AOD) to assist in escorting them to the area requiring service. 20. VA COR shall be provided with copies of Elevator Technicians licensure and training certification as well as their OSHA 10 documentation for review and record prior to the start of performance. 21. The Contractor shall supply an after-hours phone number that is to be called when mobilization of the elevator technician is required prior to the start of this co...