Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J012--Fire Sprinkler Repairs

Closed
36C26226Q0654Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
Solicitation 70CMSW25R00000011 is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for design-build services to support the Immigration and Customs Enforcement (ICE) Office of Firearms and Tactical Programs at Fort Benning, Georgia. The project, valued between 4.0 million and 4.5 million dollars, focuses on life, safety, and operational improvements. The scope of work includes the installation of two aluminum awnings at the shipping and receiving dock and Fiske Range Lane 2, turf replacement at Fiske Range, the demolition of Building 2294, gutter and drainage improvements for Building 234, commercial HVAC services and replacements, and general facility improvements for Building 301 and the DAGr Team facility. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave for workers. Performance and payment bonds are required per FAR 52.228-15. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided template. All payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 13 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation is seeking fixed-price lump sum bids for a subcontracting opportunity to replace the HVAC system at Building E8 Welding within the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes the complete change-out of the existing motor, installation of wiring, conduit, disconnects, breakers, fuses, and starters, and the subsequent validation of voltage, phase, and grounding. Deliverables include startup and testing documentation, onsite training for maintenance personnel, and the provision of manufacturer O&M manuals. All work must adhere to OSHA requirements, federal, state, and local codes, and site safety procedures. Bids must be submitted via email to nelson.dar@jobcorps.org and patricia.willover@mtctrains.com by September 19, 2026, at 3:00 PM MST. To be considered for award based on overall best value, offerors must complete a physical site visit, provide a detailed bid breakout on company letterhead, and submit a bid bond guarantee. The project is a small business set-aside under NAICS 238220 and requires compliance with Davis-Bacon prevailing wage determinations for Davis County. Awardees must provide a UEI number, submit a Schedule of Values for invoicing via AIA G702/G703 forms, and provide original payment and performance bonds from a surety with at least an A- rating within five business days of an Intent to Award letter. Performance dates will be established upon the signing of a Notice to Proceed.
Management & Training Corporation

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking bids for a subcontracting opportunity to replace a failing air-cooled chiller at the North Texas Job Corps Center, specifically within Building 214/215 in McKinney, Texas. The scope of work includes the demolition and disposal of the existing chiller, the installation and startup of a new air-cooled chiller, and the integration of building automation controls using a JACE 9000 central integration point. Additionally, the contractor is responsible for installing three-way control valves at four air handling units, replacing VFDs, performing AHU cleaning and inspection, and ensuring all wiring is plenum-rated. Bids must be submitted by September 18, 2026, and quotes must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, a Certificate of Liability Insurance naming Serrato Corporation as the holder, and Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars. Insurance requirements include a minimum of 500,000 dollars for Employers Liability and 1,000,000 dollars per occurrence for Commercial General Liability. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Primary points of contact for this solicitation are Stacy Smith and Roy Henderson.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 13 hours ago

DEADLINE

in 10 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
This subcontracting opportunity, managed by Adams & Associates, Inc. for the U.S. Department of Labor, involves the replacement of HVAC systems at the Atterbury Job Corps Center ABL Dormitory in Indiana. The project requires replacing existing R-22 Bryant condensing units and coils serving common areas and dormitory wings A, B, C, and D with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The contractor is expected to reuse existing electrical disconnects, ductwork, and thermostat wiring, and must label and leave all recovered refrigerant on-site. Bidders must attend a mandatory site visit on September 23, 2026, and submit a single lump sum proposal by October 5, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible vendors must maintain an active SAM.gov registration and a Unique Entity ID, hold a valid Indiana Contractor's License, and provide proof of specific automobile and workers' compensation insurance. Compliance with EPA, OSHA, and Davis-Bacon Act wage determinations is mandatory. Final payment is subject to Net 30 terms and is contingent upon the submission of a completed SF 1413, certified payroll records, and the release of liens from all subcontractors and material suppliers.
Adams & Associates, Inc.

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract is a Firm Fixed Price agreement for fire sprinkler system repairs at the VA San Diego Healthcare System, located at 3350 La Jolla Village Dr., San Diego, CA, with a period of performance from July 1, 2026, to June 30, 2027. The scope encompasses comprehensive repairs and replacements across multiple buildings, including Building 1, Building 2, Building 11, Building 23, and Building 25, targeting aging, corroded, and non-compliant sprinkler components identified during the 2025 inspection. Thousands of sprinklers, primarily 20-year and 50-year-old models, require replacement with specified chrome, white, or brass trim assemblies, including standard and quick-response types, dry pendants, and specialized trims in critical areas such as refrigerators, surgical suites, patient rooms, and interstitial spaces. Work includes relocating improperly installed sprinklers, addressing cold solder conditions, replacing damaged valves and piping, and removing or plugging obsolete fittings. Standpipe repairs are required on the roof of Building 1, including replacing corroded hose valves and missing caps. The contract also requires modifications to the fire alarm system and electrical connections for an exterior bell on Building 23. Contractors must hold current State of California C16 Fire Protection Contractor Certification and comply with all applicable federal, state, and VA safety codes, including OSHA, NFPA-25, NFPA-101, NFPA-99, and ADA standards. All personnel entering asbestos-containing areas, particularly in Building 1, must have a minimum 16-hour O&M asbestos certification and a valid respirator fit test, which must be submitted to the VA prior to work. Each visit must include one Journeyman Sprinkler Fitter and one advanced apprentice; quarterly and semi-annual inspections require an additional Fire Alarm Technician at the control panel. The contractor is responsible for maintaining personal liability and property damage insurance as mandated by federal law and for all injuries or damages caused by their personnel. Work must be scheduled during normal business hours, Monday through Friday, 7:30 a.m. to 4:00 p.m. Pacific time, with overtime and holiday work at the contractor’s expense. All inspections, tests, and repairs must be fully documented and preserved on-site for three years. Invoices must be submitted monthly in arrears through the VA’s electronic invoicing system via OB1

General Info

Firm fixed price fire sprinkler repair and replacement at VA San Diego, July 2026-June 2027.

Agency

Department Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)View Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Department of Veterans Affairs, Tucson, AZ, 85723

Set-Aside

SDVOSBC

Documents

(1)

Solicitation 36C26226Q0654 Fire Sprinkler Repairs

DOCXrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)
Contacts1 person available
OfficeGilbert, AZ, 85297, USA
Organization / Agency
Department Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)
View Agency Profile
Office AddressGilbert, AZ, 85297, USA
Contacts
Diana McInnisContract Specialist

Full Description

Show more


Page 1 of 14 Page 12 of 12
Page 1 of 14
STATEMENT OF WORK CONTRACT TITLE: Fire Sprinkler repairs
PLACE OF PERFORMANCES:
VA San Diego Healthcare System 3350 La Jolla Village Dr. San Diego, CA 92161
PERIOD OF PERFORMANCE: 07/01/2026-06/30/2027
CONTRACT TYPE:
Firm Fixed Price
BACKGROUND: Fire sprinkler deficiencies from 2025 annual inspection and testing.

GENERAL REQUIREMENTS:
Per applicable VA San Diego requirements/standards, the contractor will:
BLDG 1 WETPIPE REQUIRED REPAIRS:
**** 6TH FLOOR **** NORTH: The following areas were found to have 50yr old sprinklers: 6231 (2), 6232 (2), 6233A (2), 6242 (2), 6239 (2), 6240, 6233 (2), 6243 (2), 6254 (6), 6245 (2), 6246 (4), 6246A (2), 6230 (4), 6252B (2), 6252C (1), 6252E (4), 6247 (2), 6249 (2), 6250 (1), 6251 (1), 6254 (6), 6254A (2), 6256 (2), 6257 (2), 6264 (1), 6254B (2), 6263 (2), 6267 (6), 6268 (1), 6269 (2), 6259 (2),6263A (1), 6224 (1), 6225 (1), 6219 (2), 6218 (2), 6217 (4), 6215 (1), 6268 (2). Replace (88) 165° STD ½ Chrome SSP 401chrome trim. WEST: The following areas were found to have 50yr old sprinklers: 6097 (1), 6024 (1), 6035 (4), 6025 (2), 6032 (2), 6030(4), 6070 (1), 6029 (2), 6083 (2), 6082 (2), 6050 (1), 6045 (2), 6080 (1), 6081 (14), 6062 (3), 6048 (2), 6051 (2), 6049 (2), 6052(5), 6055 (3), 6058 (2), 6061 (2), 6056A (2), 6069 (2), 6074 (2), 6086 (2), 6087 (2), 6088 (4), 6095 (2), 6096 (2), 6091 (1), 6091A(1). Replace (82) 165° STD ½ chrome SSP 401 chrome trim. SOUTH: The following areas were found to have 50yr old sprinklers: 6105 (3), 6107 (4), 6110 (4) 6118 (2), 6112 (1). Replace(14) 165° STD ½ chrome SSP 401 chrome trim. EAST: The following areas were found to have 50yr old sprinklers: 6149 (1), 6150 (4), 6153 (2), 6160 (1), 6163 (2), 6164 (4),6169 (2), 6170 (2), 6171 (2), 6172 (2), 6176 (2), 6174C (3), 6174G (4), 6174F (4), 6184 (2), 6189A (3), 6189C (2), 6187 (1), 6190(1), 6191 (2), 6192 (2), 6197 (1), 6198 (2) , 6200 (3), 6202 (2), 6203 (2), 6204 (2), 6205 (2), 6207 (2). Replace (66) 165° STD ½ chrome SSP 401 chrome trim. CORE: Housekeeping closet 6010 replace (1) corroded 155° QR ½ chrome SSP SRC trim.
NORTH: 6254B replace (2) 20yr old 155° QR ½ chrome SSP 399 chrome trim (2001). NORTH: 6252A next to cage washer door replace (1) corroded 200° QR ½ chrome SSP 401 Chrome trim. NORTH: 6268 replace (2) 20yr old 155° QR ½ chrome SSP 401 chrome trim (2001).
WEST: refrigerator 6037 replace (2) 20yr old 200° QR 1 x 12 chrome dry pendant w/ chrome trim (2002). NOTE: This will require majority stitch work. WEST: 6028 replace (2) loaded/corroded 155° QR ½ chrome SSP 401 chrome trim.
WEST: 6044A in 6043 replace (1) corroded 155° QR ½ white SSP SRW. WEST: 6044 entry replace (1) corroded 155° QR ½ white SSP SRW. WEST: 6040 women s bathroom shower replace (1) corroded 155° STD ½ chrome SSP 401 chrome.
WEST: refrigerator 6081E replace (1) 10yr old 200° STD 1 x 12 chrome dry pendant w/ chrome trim (2013). NOTE: this will require majority stitch work. WEST: 6070 refrigerator replace (1) 10yr old 200° STD 1 x 12 chrome dry pendant w/ chrome trim (2013). NOTE: this will require majority stitch work.
WEST: 6056A & 6057 replace (2) 20yr old 155° QR ½ chrome SSP SRC trim (2001).
WEST: 6062 replace (3) 20yr old 155° QR ½ chrome SSP 401 chrome trim (2002). WEST: 6070 replace (1) 20yr old 155° QR ½ white SSP SRW trim (2004).
WEST: 6091 & 6091A replace (2) 20yr old 155° QR ½ chrome SSP 401 chrome trim (2002). SOUTH: 6104 refrigerator replace (1) 10yr old 200° STD 1 x 12 chrome dry pendant w/ chrome trim (2013). NOTE: this will require majority stitch work.
SOUTH: 6108A replace (4) corroded 165° STD ½ chrome SSP 401 chrome trim. SOUTH: 6112 replace (1) 20yr old 155° QR ½ chrome SSP 401 chrome trim (2005).
SOUTH: 6112 refrigerator replace (1) 10yr old 200° STD 1 x 12 chrome dry pendant w/ chrome trim (2013) this will require majority stitch work. NOTE: Inside refrigerator is very warm! EAST: hallway leading to stair 12 replace (9) corroded 155° STD ½ white SSP 401 white trim. EAST: 6155 replace (2) corroded 165° STD ½ chrome SSP 401 chrome trim.
EAST: refrigerator 6166 replace (2) 10yr old 200° QR 1 x 12 chrome dry pendant w/ chrome trim (2013). NOTE: this will require majority stitch work.
EAST: 6179 replace (2) corroded 165° STD ½ chrome SSP 401 chrome trim EAST: 6197A in 6198 replace (3) corroded 165° STD ½ chrome SSP 401 chrome trim
**** 5TH FLOOR **** SOUTH: exterior core hallway from stair 11 to dead end into east wing replace (7) corroded 155° QR ½ White SSP 401 white trim.
NORTH: exterior core hallway to stair 9 replace (5) corroded 155° QR ½ white SSP 401 white. These Sprinklers are also near 20yrs old (2008). NORTH: hallway outside 5315 replace (1) corroded 155° QR ½ chrome SSP SRC trim.
WEST: 5004 next to 5003 men s bathroom replace (2) corroded 155° QR ½ chrome SSP 401 chrome Trim. CORE: hallway to south wing door replace (4) 20yr old 155° QR ½ chrome SSP SRC trim.
CORE: 5019 replace (1) 20yr old 155° QR ½ chrome SSP SRC trim. CORE: 5020 replace (9) 20yr old 155° QR ½ chrome SSP SRC trim.
CORE: 5006 (2), 5005 (2), 5021 (1), 5010 (1), women s restroom (2), 5008 (6). Replace (14) 20yr old 155° QR ½ chrome SSP 401 chrome trim. NORTH: 5280 replace (6) 20yr old 155° QR ½ chrome SSP 401 chrome trim. NORTH: 5284 area and hallways replace (20) 20yr old 155° QR ½ chrome SSP SRC trim.
NORTH: 5341 replace (1) 20yr old 155° QR ½ chrome HSW 401 chrome trim. NORTH: Vascular Lab area and hallways replace (61) 20yr old 155° QR ½ chrome SSP SRC trim.
NORTH: ASU area replace (72) 20yr old 155° QR ½ chrome SSP SRC trim & (7) 20yr old 155° QR ½ chrome SSP 401 chrome trim. EAST: east wing hallway and rooms replace (36) 20yr old 155° QR ½ chrome SSP 401 chrome trim. EAST: C Pod replace (22) 20yr old 155° QR ½ chrome SSP 401 chrome trim .
EAST: B Pod replace (18) 20yr old 155° QR ½ chrome SSP 401 chrome trim. EAST: B Pod in room 5219 replace (2) 20yr old 155° QR ½ chrome HSW 401 chrome trim. SOUTH: 5106B (1), 5126 (1), 5106A (1). Replace (3) 20yr old 155° QR ½ chrome SSP 401 chrome Trim. SOUTH: 5104 replace (4) 20yr old 155° QR ½ chrome SSP SRC trim.
SOUTH: 5140 replace (4) 20yr old 155° QR ½ chrome SSP SRC trim. SOUTH: 5105 replace (2) 20yr old 155° QR ½ chrome SSP SRC trim.
SOUTH: hallway from nurse station C to room 7 replace (40) 20yr old 155° QR ½ chrome SSP SRC trim. SOUTH: entrance to reception desk replace (7) 20yr old 155° QR ½ chrome SSP SRC trim. SOUTH: Nurses station A replace (18) 20yr old 155° QR ½ chrome SSP SRC trim.
SOUTH: DOU area & patient rooms (31), staff office area (33). Replace (64) 20yr old 155° QR ½ chrome SSP SRC trim. EAST: 5244 bathroom replace (1) corroded 155° QR ½ chrome SSP 401 chrome trim.
EAST: 5229 house keeping replace (1) missing Victaulic SRC trim. WEST: throughout Anesthesia/Surgery replace (128) 20yr old 155° QR ½ chrome SSP 401 chrome Trim & (56) 20yr old 155° QR ½ chrome SSP SRC trim. NOTE: Work to be completed at night. **** 4TH FLOOR ****
SOUTH: 4329 replace (1) painted 155° QR ½ chrome SSP 401 chrome trim SOUTH: 4004 women s bathroom replace (1) corroded 155° QR ½ chrome SSP 401 chrome trim
SOUTH: 4108 room #7 replace (3) corroded 155° QR ½ chrome SSP (1) SRC trim & (2) 401 chrome Trim NORTH: 4284 in 4289 exam room replace (1) corroded 155° QR ½ chrome SSP 401 chrome Trim
NORTH: 4026 EP holding room replace (1) corroded 155° QR ½ white SSP SRW trim WEST: 4040 Specialty a clinic in 4045 clean linen replace (1) Victaulic SRC trim
WEST: in 4071 Nuclear Medicine Hallway outside staff bathroom 4054 replace (1) corroded 155° QR ½ chrome SSP 401 chrome trim EAST: 4184B there are (2) sprinkler under 6 of each other in a cold solder situation. Need to relocate One sprinkler. SOUTH: 4124 room #16 replace (4) corroded 155° QR ½ chrome SSP (1) SRC trim & (3) 401 Chrome trim.
SOUTH: 4113 room #12 replace (3) corroded 155° QR ½ chrome SSP (1) SRC trim & (2) 401 chrome Trim. SOUTH: 4115 meditation room replace (2) corroded 155° QR ½ chrome SSP SRC trim.
SOUTH: 4162 conference room replace (2) corroded 155° QR ½ chrome SSP SRC trim. SOUTH: 4122 room #14 replace (2) corroded 155° QR ½ chrome SSP (1) SRC trim & (1) 401 chrome Trim. SOUTH: 4123 room #15 replace (4) corroded 155° QR ½ chrome SSP (1) SRC trim & (3) 401 Chrome trim.
SOUTH: hallway outside 4123 & 4124 replace (2) corroded 155° QR ½ chrome SSP SRC trim. CORE: 4000A (2), 4008 (7), 4006 (2), 4005 (1). replace (12) 20yr old 155° QR ½ chrome SSP 401 Chrome trim.
CORE: 4016 replace (5) 20yr old 155° QR ½ chrome SSP 401 chrome trim. CORE: 4015 (9), 4015A (2) replace (11) 20yr old 155° QR ½ chrome SSP SRC trim. NORTH: 4366 (11), 4370 (1), 4303 (2), 4304 (5), main hallway (13), Exam rooms 12-21 & hall Way (32), exam rooms 1-11 & hallway (34). replace (98) 20yr old 155° QR ½ chrome SSP 401 chrome SSP 401 chrome trim.
EAST: 4263 surgical service Annex replace (39) 20yr old 155° QR ½ chrome SSP 401 chrome trim. EAST: 4186 nursing service replace (34) 20yr old 155° QR ½ chrome SSP 401 chrome trim.
EAST: ELT area replace (75) 20yr old 155° QR ½ chrome SSP 401 chrome trim & (5) SRC. EAST: hallway & rooms off hallway replace (30) 20yr old 155° QR ½ chrome SSP 401 chrome trim.
WEST: 4071 (32), 4044A (1), 4044 (2), 4043 (1), 4079 (1), 4086A (1), hallway (2), 4075 (4), 4076 (12), 4085 (5), 4022 (23).Replace (84) 20yr old 155° QR ½ chrome SSP 401 chrome trim.
SOUTH: 4125 room #17 replace (2) corroded 155° QR ½ chrome 401 chrome trim. SOUTH: hallway outside 4126 replace (1) corroded 155° QR ½ chrome SSP SRC trim.
SOUTH: 4139 room #23 replace (4) corroded 155° QR ½ chrome SSP (1) SRC trim & (3) 401 Chrome trim. SOUTH: 4134 room #27 replace (2) corroded 155° QR ½ chrome SSP 401 chrome trim.
SOUTH: hallway outside 4137 replace (1) corroded 155° QR ½ chrome SSP SRC trim. SOUTH: 4175D bathroom replace (1) corroded 155° QR ½ chrome SSP SRC trim.
SOUTH: 4175 right hand closet replace (1) corroded 155° QR ½ chrome SSP SRC trim. SOUTH: hallway outside 4175 replace (2) corroded 155° QR ½ chrome SSP SRC trim. SOUTH: 4156 Ante room - 4157 room #30 bathroom replace (1) corroded 155° QR ½ chrome SSP 401 chrome trim.

**** 3RD FLOOR ****
CORE / NORTH: 3308C replace (1) 20yr old 155° QR ½ chrome SSP 401 chrome trim. CORE: 3018 (9), 3002 (2), 3004 (6), 3008 (7), 3007 (1). Replace (25) 20yr old 155° QR ½ chrome SSP 401 chrome Trim.
NORTH: The following areas were found to have 20yr old sprinklers: 3317 (1), hallway from 3317 to 3310 (7), 3318 (1),3322 (5), 3324 (1), 3316 (2), 3325 (3), 3314 (4), 3327 (3), 3317A (2), 3313 (1), 3310 (1), hallway from north wing entry to 3337(6), 3383 (1), 3382 (1), 3380 (2), Dayroom (3), 3334 (1), 3333 (1), 3379, (1), 3378 (1), 3336 (1), 3377 (1), 3357 (4), 3357B (1), hallway from 3372 To 3342 (9), 3339 (1), 3356 (1), 3354 (6), 3340 (3), 3353A (1), 3342 (3), hallway from 3345 to 3349 (3), 3345(5), 3347 (3), 3349 (3), 3352 (1), 3359 (3), 3360 (5), 3374 (3), 3372 (3), 3371 (1), 3369 (3), hallway from 3369 to 3363 (3), 3363A(1), 3363 (1), 3402 (1), hallway outside 3402 (2), 3386 (2) 3388 (3), hallway from 3399 to 3395 (6), D Pod staff bathroom (1), bathroom outside 3391 (1), 3393 (3), 3395 (3), 3397A (1), 3397 (1). Replace (150) 155° QR ½ chrome SSP 401 chrome Trim.
EAST: The following areas were found to have 20yr old sprinklers: hallway from 3217 to 3225 (4), 3219 (3), 3217 (1), 3217A , 3221 (4), 3223 (4), 3225 (1), 3227 (3), 3226 (1), 3213 (1). Replace (23) 20yr old 155° QR ½ chrome SSP SRC trim.
SOUTH: The following areas were found to have 20yr old sprinklers: 3207A (2), South entry to 3162 (8), 3207B (2), 3161, 3168 (2), 3170 (2), 3172 (1), hallway from 3170 to 3162 (6), 3176 (1), 3175 (1), 3174B (1), 3174 (1), 3167 (1), 3177 (1), 3162G (4), 3164 (2), 3185 (2), 3186B (1), 3186A (2), 3187 (1), 3188 (1), 3190 (1), 3206 (1), 3191 (1), 3192 (2), 3207 (1), hallway from 3206 to 3202 (5), 3193 (2), 3203 (1), 3195 (1), 3196 (4), 3200 (3), 3202 (1), 3202A (1). Replace (70) 20yr old 155° QR ½ chrome SSP 401 Chrome Trim. SOUTH: The following areas were found to have 20yr old sprinklers: 3117 (6), 3121 (1), 3120 (1), 3125 (1), 3 south special procedures area entry to To 3138 (36), outside 3150 (1), 3161 (1), 3139 (1) 3142 (5), 3140 (4), 3143 (2), 3144 (1), 3146 (1), 3148B (2), 3147 (1), 3162 (9). Replace (73) 20yr old 155° QR ½ chrome SSP SRC trim. SOUTH: 3126 & 3129 replace (2) 20yr old 155° QR ½ chrome HSW SRC trim. EAST: The following areas were found to have 20yr old sprinklers: east wing entry to 3211 (4), 3209 (4), 3210 (2), 3211 (2),3307 (1), 3306 (4), 3213 (1), hallway from 3227 to 3300 (3), hallway From 3260 to 3257 (5), 3260 (1), 3258 (1), 3234 (1), 3257 (2), 3236 (1), 3251 (6), 3237 (2), Hallway from 3236 to 3249A (7), 3246 (3), 3249A (1), 3249 (1), 3246A (1), 3246 (3), 3244 (3), 3242 (5), 3240 (3), 3273C (3), 3253 (2), 3256 (1), hallway from 3256 to 3276A (7), 3275A (1), 3275 (2), hallway from 3285 to 3263 (6), 3262A (1), 3262A (1), 3264 (1), 3263 (1), 3266 (2), 3287 (2), 3267 (2), 3286A (2), 3267A (1), 3285 (1), 3268 (4), 3270 (2), 3272 (1), 3271 (1), 3274 (1), 3284 (1), 3283 (1), 3281 (2), 3280A (1), 3282 (3), 3276B (1), 3280 (1), 3276A (1), 3276 (1), 3279 (1) Replace (125) 20yr old 155° QR ½ chrome SSP 401 chrome trim. EAST: 3214 replace (1) missing Viking VK4621 white concealed cover plate.
EAST: hallway outside 3249A replace (1) 20yr old 155° QR ½ chrome HSW 401 chrome trim. **** 2ND FLOOR ****
EAST: The following areas were found to have 20yr old sprinklers: 2244A (1), 2356A (1), 2356 (1), Hallway from 2243 to 2354 (4), 2356A (2), 2356 (2), 2355 (2), 2354 (2), hallway from 2254A to 2339 (17), 2349 (2), 2346 (2), 2348 (2), 2345 (2), 2343(2), 2247 (1), 2248 (1), 2249 (1), 2252 (1), 2253 (1), 2254 (1), 2254A (2), 2254B (1), 2256 (3), 2260 (5), 2262 (1), 2263 (1), 2264(5), 2270 (1) 2274 (1), 2275 (1), 2278 (5), 2280 (5), 2282 (1), 2284 (1), 2286 (1), 2289 (1), 2290 (1), 2291 (1), 2292 (6), 2296 (2),2296A (2), 2296B (1), 2297C (3), 2297A (1), 2298 (1), 2299 (1), 2300 (1), 2302 (1), 2303 (1), 2304 (1), 2305A (1), 2305 (1), 2305B(2), 2306 (5), 2308 (1), 2309 (1), 2310 (7), 2312 (1), 2313 (1), 2314 (1), 2316 (3), 2318 (3), 2320 (3), 2322 (6), 2324 (5), 2326 (1),2327 (1), 2328 (2), 2331 (1), 2332 (1), 2336 (6), 2339 (2), 2341 (5), 2343 (1), 2345 (1), 2346 (1), 2348 (1), 2350 (1), 2351 (5),2353 (1), hallway from 2302 to 2314 (9), hallway from 2269 to 2290 (10). Replace (178) 20yr old 155° QR ½ chrome SSP 401 chrome trim. NORTH: in 2452 (2) sprinklers are 2 apart causing a cold solder situation, need to plug off (2). In 2452A (2) sprinklers are 4 apart causing a cold solder situation, need to plug off (1). NORTH: 2469 (1), 2358 (1), 2468 (1), 2359 (1), 2360 (1), 2466 (1), 2361 (1), 2362 (1), 2366 (4), 2367 (1), 2368 (1), 2369 (3), 2372 (1), 2374 (1), 2374B (2), 2376 (3), 2379 (6), 2382 (1), 2387 (2), 2388 (1), 2389 (1), 2393 (4), 2394 (4), 2397 (2), 2398 (1),2401 (2), 2404 (1), 2406 (6), 2408 (1), 2410 (6), 2410D (1), 2410E (1), 2416A (4), 2413A (1), 2413 (1), 2417 (3), 2418 (1), 2425(1), 2429 (1), 2433 (1), 2436 (5), 2338 (5), 2439 (1), 2440 (1), 2441 (1), 2442 (1), lobby linen closet (1) 2454 (3), 2452 (3), 2455(5), 2457 (2), 2460 (2), 2461 (1), 2462 (1), 2449 (1), 2463 (5), 2465 (1), 2445 (1) SRC, all hallways (43). Replace (140) 20yr old155° QR ½ chrome SSP 401 chrome trim. WEST: 2017 (1), 2018 (2), 2129 (1), 2128 (1), 2127 (1), 2021 (1), 2025 (1), 2026 (1), 2028 (2), 2032 (3), 2034 (1), 2035 (1),2036 (4). Replace (20) 20yr old 155° QR ½ chrome SSP 401 chrome Trim. WEST: hallway from 2019 to 2017 replace (4) 20yr old 155° QR ½ chrome SSP SRC trim. WEST: 2056 replace (1) missing Tyco SRW trim. CORE: 2013 (1), 2014 (1), 2002 (10), 2012 (2), 2011 (7). Replace (21) 20yr old 155° QR ½ chrome SSP SSP 401 chrome trim.
**** 1ST FLOOR **** 1.2/ INTERSTITIAL SPACE: Northeast system the 3 OS&Y is leaking at the flanges, recommend demoing And replacing with a 3 Butterfly valve w/ tamper. Will need (1) 3 x 2 -0 GxP filler piece of pipe, cut to fit on-site. Also need (3) 3 flex grooved couplings. Everon to wire new tamper. 1505: VA Police monitor room replace (2) 20yr old 155° QR ½ chrome SSP SRC trim (2002) 1597: replace (1) missing Tyco SRC trim. 1465: in exam room 1474 replace (1) 20yr old 155° QR ½ chrome SSP SRC trim (2002). 1487: PMRS storage sprinkler needs to be lowered (1) 155° STD ½ chrome SSP SRC trim.
**** BASEMENT **** B135A (1), hallway from B135 to B156A (19), B156 (20), hallway from B118 to B115A (6). Replace (46) 20yr old 155° QR ½ chrome SSP 401 chrome trim. B125B: food services there was 20yr old QR sprinklers found, replace (76) 155° QR ½ White SSP 401 white trim (Any Central or Grinnell model sprinkler). B125B: food services in refrigerators B136 (1), B137 (2), B138 (2) & freezer B181 (2) Replace (7) 10yr old 200° QR 1 x 12 chrome dry pendant w/ chrome trim. (2020). NOTE: this will require majority stitch work. B121 (10), B126 (4), B115A (1), replace (15) 20yr old 155° QR ½ White SSP 401 white trim. B125B: Women s bathroom replace (1) corroded 155° QR ½ white SSP 401 white trim B114A replace (3) 50yr old 165 STD ½ Chrome SSP 401 chrome trim. B251: manifold room on system 12 riser (Shop) replace (1) corroded angled main drain Valve And Nipple. Material needed: (1) 2 x 0-2 TxT nipple and 2 x close TxT nipple, (1) 2 elbow, (1) 2 x 0-4 TxT nipple & (1) 2 angled main drain valve. There is a 2 union down stream where Work can Start to back out piping. Hallway from door B102 to door B101 replace (5) corroded 155° QR ½ chrome SSP SRC trim NOTE: these sprinklers could be crossed from building 11, recommend impairment/shut Down Request be for both buildings 1 & 11. The following areas were found to have 20yr old sprinklers: hallway from Stair 6 to B200 (10), B213 (12), B217 (15), B217A(4). Replace (41) 155° QR ½ chrome SSP 401 chrome trim. The following areas were found to have 20yr old sprinklers: B206 (2), B205 (3), hallway from B247 To B231 (14), service Elevator lobby to SW-13 (10), elevator lobby to B155 (16), B162 (2), B159B (2). Replace (49) 155° QR ½ chrome SSP SRC trim. The following areas were found to have 50yr old sprinklers: B233 (9), B232 (9), B216C (1), B223 (25), B238 (25), B233 (15),B114 (1). B230 (2). Replace (87) 165° STD ½ chrome SSP 401 chrome. The following areas were found to have 50yr old sprinklers: Above roll up door over pump house 165° STD ½ chrome (4) SSU & (1) SSP no trims. One man Genie lift needed. HTM OPS: mezzanine & open area replace (29) 20yr old 155° QR ½ brass SSU no trim Single man genie lift needed for open area. hallway from B102 to B223C replace (5) corroded 155° QR ½ chrome SSP SEC trim. B238: refrigerator B235 replace (2) 20yr old 200° STD 1 x 12 chrome dry pendant w/ Chrome trim. NOTE: this will require majority stitch work.
BLDG 1 STANDPIPE REQUIRED REPAIRS:
Elevator machine room on roof 1 1/2 hose valve replace (1) missing 1 1/2 brass threaded cap. Elevator machine room roof - 50% of the (9) 1 1/2 hose valves on the roof have handles and stems that are starting to corroded. Will need to replace if condition worsens.
Station 22: replace (1) broken 1 ½ angled STD Powhatan hose valve.
BLDG 2 WETPIPE REQUIRED REPAIRS:
1st flr: Decon / shower 101B & storage closet replace (1) corroded 155° QR ½ chrome SSP SRC. 2nd flr: in room 204 pipe & fittings area replace (3) corroded and 20yr old 155° QR ½ brass SSP W/ red head guards.
BLDG 11: REQUIRED REPAIRS: Basement: just inside door B106 replace (1) corroded 155° QR ½ chrome SSP SRC trim Basement: BB103C entry replace (1) corroded 155° QR ½ white SSP SRW trim Basement: hallway outside BB103 replace (1) corroded 155° QR ½ chrome SSP SRC trim Basement: hallway outside BB106 replace (1) corroded 155° QR ½ chrome SSP SRC trim Basement: exterior over hang outside BA101D replace (4) corroded 155° QR ½ white SSP SRW trim Basement: BB101 replace (1) corroded 155° STD ½ chrome SSP 401 chrome trim. Closet will need to be cleared out ahead of time to make repair. 1st flr: SCI department there are 20y old QR fire sprinklers found in the following areas: hallway From entry Lobby to 1A119 Storage door (11), elevator lobby (4), outside 1A132 (2), outside 1A103 (1), 1A103 (1), 1A104 (1), 1A104A (1),1A105 (1), 1A106 (1), 1A110 (1), 1A107 (1), 1A108 (1), hall from 1A129 to 1A126 (3), 1A116 (1), 1A127 (1), 1A128 (1),1A129 (1), 1A112 (1), 1A114 (1), 1A115 (7), 1A118 (1), 1A119 (1), hallway outside 1A122 (2), 1A120 (2), 1A133 (2), 1A124(5), hallway from door 116 to 1B127 (3), 1B126 (1), 1B127 (1), hallway from door 120 to 1B110 (12), hallway outside 1B124 to 1B117 (10), hallway outside SW3-1 to 1B113 (4), SCI nurses station (4), 1B103 (1), 1B129 (1), 1B128 (1), 1B132 (1), 1B133 (1), 1B134 (1), 1B105 (1), 1B108 (6), 1B112 (6), 1B113 (1),1B115 (1), 1B108B (2), 1B108A (2), 1B135 (1), 1B123(1), 1B103 (1), 1B100 (5), 1B102 (3), 1B104 (5), 1B106 (3), 1B109 (5), 1B110 (3), 1B115 (1), 1B117 (2), 1B119 (5), 1B120(5), 1B121 (3), 1B122 (2), 1B124 (2). Replace (162) 155° QR ½ chrome SSP 401 chrome trim. Basement: 20yr old QR sprinklers found in the following areas: SRC = BB108 (27), BB107 (1), hallway from BB107 to BB103E (12), BB111 (2), BB112 (2), BB104 (24), conference room next to BB107 (2), BB115 (2). Replace (72) 155° QR½ chrome SSP SRC trim.
401 chrome = hallway BA104 to elevator lobby (6), BA107 (1), BA103 (1), BA101 (22), hallway from BA101 to BA111(10), BA109 (3), BA108 (3), BA105 (7). Replace (53) 155° QR ½ chrome SSP 401.
BLDG 23 WETPIPE: REQUIRED REPAIRS:
2.3 Exterior of Bldg. - audible fire bell has been mounted on the exterior of the bldg by riser but a Dedicated circuit 120v wiring still needs to be run to the flow switch and up to the new electrical fire Bell. Electrical wiring will need to be done by others.
BLDG 25 WETPIPE REQUIRED REPAIRS:
1.21 On riser replace (1) broken (Handle broken) 1 1/4 angled test and drain valve.
CONTRACTOR QUALIFICATIONS & OTHER RESPONSIBLITES: Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect people and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees fault or negligence. Contractors shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government. The Government reserves the right to accept or reject Contractor s employees for the rendering of services. Complaints concerning Contract Personnel s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer. The Contractor is responsible for ensuring that asbestos training certificates and valid fit test certification are provided to the COR prior to allowing any of their employee s access to an asbestos contained area or any of the interstitial areas throughout building 1. Water Based Sprinkler System Contractor Qualifications: The Contractor and/or its staff must have current State of California certification to conduct maintenance/inspections/repairs stated in the statement of work. The Contractor shall submit C16 Fire Protection Contractor Certification. During each visit to the facility, Contractor shall provide one (1) Journeyman level Sprinkler Fitters; one (1) apprentice in their final stage of apprenticeship. During routine inspections (e.g. quarterly, semi-annual) Contractor shall also provide one (1) Fire Alarm technician to man the fire alarm control panel in addition to the Journeyman and apprentice. The Contractor shall submit their current California State asbestos worker 16-hour Operation and Maintenance (O&M) certification. The Contractor shall submit their current half mask or equivalent respirator fit test. Contractor s Responsibilities: The Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government. He / She shall take all precautions necessary to protect people and property from injury or damage during the performance of this contract. He / She shall be responsible for any injury to himself / herself, his/her employees or others as well as for any damage to personal or public property that occurs during performance of this contract that is caused by him/her or his/her employees fault or negligence. The Contractor shall operate under, but not limited to the following national codes, telecommunications industry standards and practices: National Electric Code (NEC), all standards, Electronic Industries Association/Telecommunications Industry Association EIA/TIA, American with Disabilities Act (ADA), National Fire Protection Association (NFPA), Underwriters Laboratories (UL), ITU and IETF and all applicable audio, video communication data and control standards. The Contractor shall comply with all VA safety standards, manufacturers/industry standards, Food and Drug Administration (FDA), Occupational Safety and Health Administration (OSHA), The Joint Commission (TJC) and the latest editions of NFPA-99, NFPA-101, NFPA-25 and all applicable standards referenced within the body of each code book mentioned. The Contractor shall provide documentation of each inspection, test and maintenance of the system. The official documentation shall be maintained at the facility and copies available for up to three years after test, inspection, and services. SAFETY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VASDHS shall comply with applicable Federal, State, and VA safety and fire regulations and codes which are in effect during the performance period of the contract. Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Every effort shall be made to safeguard human life and property. Contractor shall comply with all applicable Federal, State, and local requirements regarding workers health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137 Contractors shall provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. The VAMC San Diego building 1, main building, contains asbestos. Any worker entering these asbestos containing areas must have an asbestos certification of no less than 16 hours and a valid fit test certification. Certifications must be presented to the VA project manager before any work in an asbestos area may begin. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS: Contractor employees will notify the VA Representative before entering a designated permit required confined space so that appropriate precautions may be taken. In addition, there are special precautions to be taken when working on 2S Mental Health unit or other locations of this facility. If required, Contractor shall keep tools and materials under their control at all times. The facility will be functional during contractor operation. Contractor shall therefore schedule the work accordingly and coordinate operation with the facility construction safety manager and project s COR. Several inspections will be conducted in locations that may require additional personal protective equipment. Contractors will notify the VA representative at any time the contractor is on VA grounds. VASDHS La Jolla facility is Federal property. Contractor shall coordinate with the facility Engineering Service if warranted for access in restricted spaces or any required support in the performance of this work. The designated COR shall coordinate the request. If work will be conducted in areas identified as containing asbestos materials. Contractors shall comply with the public laws and statues including all changes and amendments of Federal, State, and local environmental statutes and regulations governing Asbestos containing materials-ACM, to include: 29 CFR 1926.1101 Asbestos Regulations for the Construction Industry, 29 CFR 1910.134 Respiratory Protection Standard, EPA, Asbestos Hazard Emergency Response Act (AHERA) protocols, and Guidance for Controlling Asbestos-Containing Materials in Buildings, EPA 560/5-85-024. Contractors shall be licensed, qualified, and certified to meet all EPA regulations under National Emission Standards for Hazardous Air pollutants-NESHAPS and all applicable federal, state, and local regulations. CHANGES: The awarded Contractor is advised that only the Contracting Officer, acting within the scope of the contract has the authority to make changes which affect the contract in terms of quality, quantity, price, or delivery. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority, and no adjustment shall be made in the contract price to cover any increase in costs incurred as a result thereof. NORMAL WORKING HOURS: Normal hours of operation are Monday through Friday from 7:30 am to 4:00 pm Pacific time. All work is expected to be performed generally during normal hours of coverage unless requested or approved by the COR or his/her designee. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference with Government operations and personnel. Work performed outside the normal hours of coverage must be approved by the COR or his/her designee. OVERTIME AND NATIONAL HOLIDAYS: Any overtime or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed nor reimbursed by the Government. The Contractor is not required to provide service on the following U.S. Government holidays, nor shall the Contractor be paid for these days:
New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May
Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
INVOICE & PAYMENT: Payment to be made monthly in arrears. The Vendor shall submit original invoices in proper electronic format to the Financial Services Center (FSC). Proper electronic format means an automated system transmitting information electronically according to the accepted electronic data transmission methods below: VA s Electronic Invoice Presentment and Payment System The FSC uses a third-party contractor, OB10, to transition vendors from paper to electronic invoice submission. Please see OB10 contact information below to begin submitting electronic invoices, free of charge. A system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org)
Vendor e-Invoice Set-Up Information: OB10 e-Invoice Setup Information: 1-877-752-0900 OB10 e-Invoice e-mail: USClientServices@ob10.com Financial Services Center e-Invoice Contact Information: 1-877-353-9791 Financial Service Center e-Invoice e-mail: vafsccshd@va.gov The invoice MUST be itemized to include the following information listed below. Any information listed below that is not provided on an invoice will render that invoice incomplete and the invoice will be returned for immediate correction. Contract Line Item Number Time period being invoiced for. Description of services. Unit Cost Billed. Extended amount due. Invoice number and date. Contract and obligation number.
Wage Determination: Service Contract Act WD #: 2015-5635 Rev. 29, Published 12/02/2025.
See attached document: SOW - Fire Sprinkler repairs.

More opportunities from Department Of Veterans Affairs → 262-NETWORK Contract Office 22 (36C262)

Same awarding agency

NAICS: 339113
New
Federal
6515--691-CUSTOM PACKS
Solicitation # 36C26226Q1325
Solicitation 36C26226Q1325 is an Indefinite Delivery Indefinite Quantity (IDIQ) firm-fixed-price contract issued by the Department of Veterans Affairs, Network Contracting Office 22, for the procurement of custom surgical and non-surgical packs for the Greater Los Angeles Healthcare System. This acquisition is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 339113. The contract has a one-year period of performance with no option periods. Due to the complexity of the products, the initial order must be produced, sterilized, and delivered within 24 weeks of contract commencement, while subsequent orders must be delivered within three business days. The contractor is required to maintain a minimum of three months of assembled custom packs on hand at all times. Award will be based on a best-value trade-off, where non-price factors—including experience, Buy American Act compliance, Non-Manufacturer Rule compliance, and limitations on subcontracting—are collectively significantly more important than price. Offerors must provide detailed manufacturing percentages for items produced in the United States versus foreign countries and submit both the Buy American and Made in America PPE certificates. All custom sterile procedure packs must have a minimum shelf life of twelve months upon delivery. Payment is structured as monthly-in-arrears, with payment due 30 days after the receipt of a proper invoice or government acceptance of items. The contract also includes a waiver of the Small Business Administration Nonmanufacturer Rule to ensure adequate competition.
Surgical Appliance and Supplies Manufacturing

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS