Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on May 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J012--Lancaster TX Consolidated Mail Outpatient Pharmacy Warehouse Fire Suppression Modify

Closed
36C77024Q0290Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe sections in both the Administration Building and King Hall. All work must conform to the Massachusetts State Plumbing Code and International Plumbing Code, utilizing new commercial-quality materials suitable for hydronic heating service. The contractor is responsible for removing all debris and repairing any facility damage caused during performance at no additional cost. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid validity period of at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, Massachusetts licensing, a W-9, a signed ETR Vendor Acknowledgement Form, and certificates of insurance. This is an SBA set-aside opportunity for various small business categories. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, Service Contract Act, and specific FAR clauses regarding anti-lobbying and debarment. Performance bonds are required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. The selected vendor will provide emergency HVAC repairs, with pricing required for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. As a federally funded facility, the Center is entitled to GSA pricing. Award decisions will be based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Eligible bidders must be small businesses or certified socioeconomic categories, including VOSB, SDVOSB, WOSB, and HUBZone. Mandatory requirements include a valid Unique Entity ID (UEI), active SAM.gov registration, and all necessary Florida state business and employee licenses. Vendors must maintain Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence. The contract is subject to the Service Contract Act (Wage Determination No. 2005-2248) and the Davis-Bacon Act, with a minimum wage of $13.65 per hour applicable through December 31, 2026. Bids must be submitted on company letterhead by October 23, 2026, and include a W9, Vendor Questionnaire, Authority to Commit, and a certificate of insurance. Payment terms are NET 30 days. Personnel performing work on-site must adhere to strict security protocols, including searches and a prohibition on fraternization with students and staff. All deliveries must be coordinated through the Center's security personnel.
Miami Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new furnace, a 5-ton evaporator coil, a fused electrical disconnect, an electrical whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and supervision, ensuring the system is fully operational and compliant with applicable codes. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. This opportunity is set aside for small businesses under NAICS 238220. Award decisions will be based on overall best value. Compliance requirements include the Davis-Bacon Act for prevailing wages, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations, including those regarding first-tier subcontractor information and the submission of form SF 1413. Awarded contractors must provide a Unique Entity ID (UEI) number and complete the MTC Supplier Self-Certification packet. Payment will be made via progress payments based on percentage completion, utilizing AIA Document G702 and G703 or equivalent forms.
San Diego Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes the inspection, repair, and replacement of various components across eight exhaust fans, specifically addressing failed louver actuators, motor replacements, selector switch repairs, and the relocation of a thermostat. Contractors must provide detailed line-item pricing for each fan, separate pricing for system-wide component replacements, and detailed costs for labor and materials. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. Key requirements include compliance with the Federal Acquisition Regulation, Davis-Bacon Act labor standards, and OSHA and EPA regulations. Contractors must be registered and licensed in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Administrative requirements include the submission of weekly certified payroll with every invoice and the provision of Materials Safety Data Sheets for all products used on site. The project involves a substantial completion process requiring a walk-through and final acceptance inspection. Quotes must be submitted electronically to the purchasing agent by October 30, 2026, and must include a completed New Vendor Profile and W-9 for any subcontractors.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management & Training Corporation (MTC), operator of the Tongue Point Job Corps Center in Astoria, Oregon, is soliciting bids for a fixed-price, lump sum contract to replace furnaces and thermostats in three staff houses. The project involves Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent household good grade with at least a 96% efficiency rating, sized at approximately 80,000btu. Installations must include new transitions to existing ducting, gas regulators, electrical and condensate pump kits, and intake/exhaust venting. A lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts are mandatory. The estimated price range for this solicitation is between $0 and $25,000, with bids due by October 21, 2026. This is a small business set-aside opportunity under NAICS code 238220. Award decisions will be based on overall best value. Contractors must comply with the Davis-Bacon Act and applicable prevailing wage determinations, providing certified payroll weekly. Bid and performance bonds are only required for bids equal to or exceeding $25,000. Submission requirements include a signed MTC bid form, a detailed cost breakout on company letterhead, a Unique Entity Identification number, and a completed supplier self-certification packet. Final acceptance is contingent upon functional testing, the submission of operation and maintenance manuals, and a final inspection.
Tongue Point Job Corps

POSTED

about 4 hours ago

DEADLINE

in about 11 hours
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of the existing dry system distribution piping network and failing air compressor across the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The selected licensed fire sprinkler contractor must eliminate system leaks and install a new compressor sized according to NFPA standards to prevent equipment short-cycling. All work must adhere to NFPA 25 (2023 Edition) and local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on a mandatory site visit. Evaluation is based on overall best value and bidder responsiveness. For bids totaling $25,000 or more, a bid bond of 20% of the base bid is required at submission, and the awarded contractor must provide performance and payment bonds from an A-rated surety within five business days of the Intent to Award. Compliance requirements include adhering to Davis-Bacon prevailing wage rates for Idaho, submitting weekly certified payroll reports, and providing a 12-digit UEI number. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
Dorm Hot Water Tank Replacement – Glenmont Job Corps Center – S26-006
Solicitation # S26-006
Adams and Associates, Inc. is seeking qualified mechanical and plumbing contractors for solicitation S26-006 to replace domestic hot water storage tanks and associated equipment at the Glenmont Job Corps Center in Glenmont, New York. The scope of work involves the removal and disposal of four existing 505-gallon tanks and the installation of four new 500-gallon insulated storage tanks, four new heat exchangers, and one bronze Bell and Gossett circulator pump in the North Dormitory. Additional requirements include piping modifications using ProPress materials, electrical work, insulation, rigging, and the provision of a temporary hot water heater to ensure the facility remains operational during the estimated construction period of two and a half to three weeks. This is a subcontracting opportunity rather than a direct federal procurement, though it requires compliance with Davis-Bacon prevailing wage requirements and New York State statutory insurance and licensing standards. Proposals are due by November 9, 2026, at 4:00 PM ET, following a site walkthrough on October 29, 2026. Award selection is based on a weighted evaluation of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points), with the lowest price not guaranteeing an award. Required submission documents include company qualifications, business references, New York State licenses, certificates of insurance, a completed vendor questionnaire with UEI and NAICS code, and a current W-9. Payment terms are set at Net 30 days upon completion and receipt of invoice.
Adams and Associates, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall in Kentucky. The scope of work requires the contractor to furnish and install two 4-ton Trane split systems with a minimum 17 SEER rating, two 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of a Honeywell Pro 8000 programmable thermostat, new refrigerant line sets, condensate drain piping, and pumps. The project must be completed within 45 days of award, and the contractor is responsible for all inspections, testing, and providing necessary operating and maintenance manuals. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. To be considered, bidders must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory, with weekly certified payroll and a signed Statement of Compliance required for invoice acceptance. All work must adhere to local codes, manufacturer specifications, OSHA, and EPA regulations. Quotes are due by October 30, 2026, and must include detailed labor and materials costs, a W-9, and a New Vendor Profile.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work includes the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or equivalent, including all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum-rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes, with performance scheduled between 7:00 am and 4:00 pm, Monday through Friday. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding $100,000.00 require payment and performance bonding for 100% of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and a requested payment schedule. Final deliverables include the provision of operation manuals to the Facility Manager upon project completion.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 238220
New
WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # wojc-buried-domestic-hot-water-dhw-pipe-repair-0
Education and Training Resources is seeking quotes for a subcontracting opportunity to repair buried domestic hot water piping at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work involves the excavation, location, removal, and repair of compromised piping up to 4 inches in diameter at two specific locations: behind Singletary Hall and on the east side of Harris Hall. The selected contractor must provide all labor, materials, and equipment, ensuring work adheres to industry standards, OSHA regulations, and the National Fire Protection Association's Life Safety Code. Deliverables include a one-year equipment and workmanship warranty and the submission of weekly certified payroll reports. Interested bidders must submit a detailed cost breakdown via a Bid Sheet, a proposed service schedule, and proof of required Massachusetts licensing and credentials by November 6, 2026. Mandatory administrative documentation includes a W-9, Vendor Acknowledgement Form, Certificates of Insurance, and an active SAM.gov registration with a Unique Entity ID. This solicitation is open to various small business designations, including VOSB, SDVOSB, WOSB, and HUBZone. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Depending on the final project value, contractors may be required to provide payment and performance bonds for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 16 days

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Department of Veterans Affairs Lancaster CMOP 2962 S. Longhorn Dr., Lancaster, TX, 75134, USA

Set-Aside

NONE

Documents

6

Dallas CMOP Warehouse - Existing System Replacement Sketch

PDF, High priority: read this first2 pages · specifications
High

Dallas CMOP Warehouse Racking - Fire Sprinkler System Assessment

PDF, High priority: read this firstspecifications
High

Exhibit 1 - Existing System As-Is K5.6 CMDA Sprinklers

PDF, High priority: read this firstspecifications
High

VA Dallas - Hydraulic Calculation Existing System

PDF, High priority: read this firstspecifications
High

VA DALLAS Hydraulic Calculation Improvement K11-2

PDF, High priority: read this first9 pages · specifications
High

Lancaster TX Consolidated Mail Outpatient Pharmacy Warehouse Fire Suppression Modify

DOCX, Low priority10 pages · sources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cmop Office (36C770)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA
Office AddressLEAVENWORTH, KS, 66048, USA
Contacts
Christina (Tina) B SmithContract Specialist

Full Description

Show more
This is a Sources Sought notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to obtain information regarding the availability and capability of all qualified sources to perform a potential requirement. Purpose and Objectives: Your responses to the information requested will assist the Government in determining the appropriate acquisition method. NAICS code: 238220 Plumbing, Heating, and Air-Conditioning Contractors; and size standard is $19M. NOTE: Respondent claiming SDVOSB and VOSB status must be registered and CVE verified in VetBiz Registry Veteran Small Business Certification (sba.gov). Project requirements: This requirement is for DALLAS CMOP FIRE PROTECTION SYSTEM MODIFICATIONS at the Lancaster CMOP, Project Number: 763-24-101 INTRODUCTION The Dallas Consolidated Mail Outpatient Pharmacy (CMOP) located in Lancaster, TX needs a licensed contractor to modify the fire protection system. In July 2023, VA completed an assessment with a fire protection engineer to determine what impact additional storage systems would have to the building, specifically fire protection. The engineer made recommendations to accommodate the VA s storage plans. The facility consists of two buildings built under two phases. The original Building #1 (West side) covers 24,900 SF and the 2002 addition of Building #2 (East side) covers 60,000 SF. Both buildings are currently protected with previously approved and functioning wet-pipe sprinkler systems. Each building has an individual fire service entrance taking supply from an existing 8 city water supply main located in South Longhorn Drive. The scope of work is limited to the fire protection system located in the original Building #1 portion only. The fire protection systems in the 2002 addition known as Building #2 are to remain as-is, except where the new pipe connects to the fire pump. The Dallas CMOP is located at 2962 South Longhorn Dr, Lancaster, TX 75134. SCOPE The contractor is responsible for the following to the existing system in Warehouse #1: Replace existing K-5.6 upright fire sprinklers with new CMSA K-11.2 high-temperature upright sprinklers throughout the entire warehouse area, equal to Viking VK540, attached datasheet. Existing fire sprinklers in the areas separated from the rack storage, such as offices, restrooms, and breakrooms can remain as-is. Abandon the existing riser in Building #1. Add a new 8 system riser/zone to the existing pump house and install an 8 express main to Building #1. Also, to provide adequate flow to meet the new design criteria of the system and reduce friction loss throughout the sprinkler piping, add a new 4 bulk-main from the top of the existing riser in Building #1 to the existing 4 cross-main on West. Connect new 8 express main to existing system cross main per Attachment. This will eliminate the existing Building #1 fire department connections. The entire facility will be served by a single existing connection located outside of Building #2. Provide signage for the interior Building #1 riser and exterior fire department siamese connections to show they are out of service, following NFPA guidelines. Also, remove the siamese connections and cap the pipe located in the parking median. Any specific manufacturers noted, such as Viking, are the basis of design. The contractor may propose the same or equal. In addition, the following are general requirements that the Contractor is responsible for: Design, installation, and testing shall be in accordance with NFPA 13. Any and all necessary equipment, such as lifts. Preparation of all required documentation and shop drawings. Licensure as required by the City. Any fees required by the City. City permitting. City inspections. Coordinating outages. Scheduling to limit impact to warehouse space and productivity by performing overhead work after hours. Tie-ins likely during regular hours to manage interim life safety measures. Required fire alarm devices, integration, and testing. Normal work hours are 7:00AM to 12:00AM, local time, Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site s normal working hours the contractor must submit a written request for approval to the Contracting Officer s Representative (COR) at least seven (7) working days prior to the proposed start of such work. PROJECT ACTIVITIES The entire activity of the project will follow the following sequence of events: Pre-proposal Site Visit Request for Proposal Submission Award Post Award Kick-off Meeting Notice to Proceed Bonding & Insurance Plans, Security, Schedule, Progress Reports/Meetings (weekly) Shop Drawings and Permits Demolition, Construction, and Installation Testing, Commissioning, and Training (focused on the fire alarm devices and fire pump operation) Final Inspection and Punch List Acceptance Operations and Maintenance Manuals (focused on fire pump operation) AutoCAD Drawings (Design, Construction, As Built) Progress Payments Warranty DELIVERABLES Period of Performance: 120 Calendar days after Notice to Proceed Performance and Payment bonds: Due 10 Calendar days after award Proof of Insurance: Due 10 Calendar days after award Schedule: The Contractor shall develop a schedule demonstrating fulfillment of the contract requirements (Project Schedule) and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). See the Specifications for details. Safety Plan: Comprehensive safety plan, AKA the Accident Prevention Plan or Construction Safety & Health Plan, shall be implemented by the Contractor in accordance with the Specifications prior to mobilization. The plan shall be site and job specific, and address all prime and subcontractor work operations. Work cannot proceed without an accepted Safety Plan. The Plan can include Fire Safety rather than having a separate Fire Safety Plan. See the Specifications for details. Progress Meetings: Will be held approximately every week, will be approximately 1 hour in length, scheduled by the Contractor and shall be attended by COR. The frequency and duration may change depending on the work activities occurring. Permits: Contractor shall submit all permits associated with this project to the COR. This shall include permits necessary with City of Lancaster and local Fire departments. The contractor shall be responsible for coordination with these offices. Installation will be allowed to begin only after VA s acceptance of all permits. Submittals: Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders, or electronically in PDF, and provide an index referencing the appropriate specification section. Submittals shall include, but not be limited to, the following: Qualifications: Provide a copy of the installing contractor s license. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA 13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location. Manufacturer s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet. Calculation Sheets: Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and Calculations chapter of NFPA 13. Valve Charts: Provide a valve chart that identifies the location of each control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location. Final Document Submittals: Provide as-built drawings, and testing and maintenance instructions. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment. Warranty Plan: Contractor shall provide a Warranty Management Plan at least thirty (30) days before the planned pre-warranty conference in accordance with the Specifications. APPLICABLE PUBLICATIONS National Fire Protection Association (NFPA): 13-Installation of Sprinkler Systems 25-Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems 101-Life Safety Code 170-Fire Safety Symbols Underwriters Laboratories, Inc. (UL): Fire Protection Equipment Directory Factory Mutual Engineering Corporation (FM): Approval Guide INSTALLATION Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Piping shall not obstruct the minimum means of egress clearances required by NFPA 101. Pipe hangers, supports, and restraint of system piping, shall be installed accordance with NFPA 13. Welding: Conform to the requirements and recommendations of NFPA 13. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector. Supervisory Switches: Provide supervisory switches for sprinkler control valves. Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations. Inspector's Test Connection: Install and supply in accordance with NFPA 13, locate in a secured area, and discharge to the exterior of the building. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm (1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction. Provide pressure gauges at each water flow alarm switch location and at each main drain connection. Firestopping shall be provided for all penetrations of fire resistance rated construction. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following: Identification Signs: Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector s test. Provide valve tags for each operable valve. Coordinate nomenclature and identification of operable valves with COR. Where existing nomenclature does not exist, the Tag Identification shall include no less than the following: (FP-B-F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone (if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire Protection, Building 500, First Floor East, Number 001.) Instruction/Information Signs: Provide signage for each control valve to indicate valve function and to indicate what system is being controlled. Provide signage indicating the number and location of low point drains. Hydraulic Placards: Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each alarm check valve. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government. Impairments to existing sprinkler systems shall be kept to a minimum. These systems shall remain functional as long as possible during the installation of the new system. Work with facility safety staff to develop appropriate interim life safety measures (ILSM) when the sprinkler system is taken out of service or impaired. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the COR. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption. INSPECTION AND TESTING A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed. Hydrostatically test system, including the fire department connections, as specified in NFPA 13, in the presence of the COR or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests. B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test. Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test. INSTRUCTIONS/TRAINING FURNISH THE SERVICES OF A COMPETENT INSTRUCTOR FOR NOT LESS THAN TWO HOURS FOR INSTRUCTING PERSONNEL IN THE OPERATION AND MAINTENANCE OF THE SYSTEM, ON THE DATES REQUESTED BY THE COR. SECURITY The Dallas CMOP is a secure facility and not open to the public. The contractor shall follow all requirements for parking, site access, and temporary badging. VA PRIVACY POLICY REQUIREMENTS Information Systems Officer, Information Protection: The contractor will not have access to VA Desktop computers nor will they have access to online resources belonging to the government while conducting services in the application of complex adaptive system theory to health care organizations. The certification and accreditation requirements do not apply to this procurement nor is a security accreditation package required. Privacy Officer: The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA. All research data available for Contractor analyses is de-identified. Records Manager: There will be no federal records created, maintained, used or disposition with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] BID ITEMS ITEM I, GENERAL CONSTRUCTION: Work includes fire alarm and fire sprinkler and alarm systems. Contractor shall Utilize Davis-Bacon (prevailing) wages. ATTACHMENTS Fire Protection Engineer Design Analysis Report Drawing of existing system as-is with K5.6 CMDA Sprinklers and existing city water supply. Hydraulic calculation of existing system Drawing of existing system with improvement K11.2 CMSA sprinklers and connection to existing fire pump Hydraulic calculation of improvement with K11.2 CMSA and existing fire pump Datasheet -Viking CMSA VK540 K11.2 upright sprinklers Information sought: Response to this announcement shall not exceed 10 pages and should include the following information: (1) A tailored capability statement indicating the firm s ability to provide a product and related services; (2) The respondents DUNS number, organization name, address, point of contact, and size and type of business (e.g., SDVOSB/VOSB, etc.,) pursuant to the applicable NAICS code; (3) Information should be provided electronically in a Microsoft Word or Adobe PDF format. Please e-mail your response with the above information to Christina.Smith7@va.gov with the subject line Sources Sought Notice # 36C24924Q0290 by 5:00pm on 16 May 2024. Any questions should be emailed to Christina.Smith7@va.gov. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization s qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation. Confidentiality. No proprietary, classified, confidential, or sensitive information should be included in your response. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s).

More opportunities from Department Of Veterans Affairs → National Cmop Office (36C770)

Same awarding agency

NAICS: 322220
Federal
Tucson CMOP Shipping Box/Coolers
Solicitation # 36C77026Q0047
The Department of Veterans Affairs, through the National CMOP Office, has issued a Sources Sought Notice to conduct market research for the procurement of insulated recyclable small shipping container boxes for the Tucson Consolidated Mail Outpatient Pharmacy. These specialized coolers are used to transport temperature-sensitive Veteran prescriptions and must maintain a Mean Kinetic Temperature at or below 45 degrees Fahrenheit for at least 48 hours. The required containers must be 11.5 x 10 x 6 inches, constructed from Kraft board grade 200B DC with weather-resistant adhesive, and feature a specific tear-away zipper and bold black stenciling that reads Refrigerate Upon Arrival. The anticipated requirement involves a total of 143,242 units, with a demanding delivery schedule of 3,456 units delivered daily, Monday through Friday, to the Tucson facility. Logistics requirements specify that boxes must be shipped with flaps folded and bottoms taped, secured on 40x48 pallets with corner boards and stretch wrap, and not stacked inside one another. Interested vendors must provide their SAM Unique Entity ID, business classification, and a capability statement by November 20, 2025. This notice is strictly for market research purposes to identify capable suppliers and does not constitute a formal solicitation or a commitment to award a contract.
Paper Bag and Coated and Treated Paper Manufacturing

POSTED

about 1 month ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS