Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

J045--BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS

Active
36C24226Q0816Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)View Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Hudson Valley VA Healthcare System Montrose Campus, Montrose, NY, 10548-1454, USA

Set-Aside

SBA

Documents

(5)

ATTACHEMENT+A+23+21+11-Boiler+Plant+Piping.pdf

PDF

Attachment+D+-+Field+Devices+To+Be+Replaced+on+Boiler+2.pdf

PDF

Attachment+C+-+SAMPLE+of+Combustion+Calibration+Test+Report.pdf

PDF

36C24226Q0816.docx

DOCX

Attachment+B+-+VA+Standard+Detail+SD+235239-04.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
Contacts1 person available
OfficeALBANY, NY, 12208, USA
Organization / Agency
Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
View Agency Profile
Office AddressALBANY, NY, 12208, USA
Contacts
Natalie AcevedoContract Specialist

Full Description

Show more
Provide the services of a mechanical contractor to replace in kind one (1) existing Webster burner assembly on Boiler #2 in the Boiler Plant (Building 20) at the VA Hudson Valley Healthcare System Montrose Campus. The Scope of Work also includes the replacement of the existing burner train field devices for both gas and oil and the replacement of existing field devices in the front of the boiler. All replacement of the field devices must be in kind. Replace burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Other repairs required are listed below. All work shall be performed in accordance with attached VA specifications, VA Design Manual, and VA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition. Background: Boiler # 2 is a Victory Energy, D-type Water-tube boiler rated at 30,000 lb/hr steam (approximately 37.5MMBtu/h input). The boiler was originally installed in 2011 with a Webster model HDSXC-105C-9V-750 Burner. The Micro-Mod Parallel Positioning (Metering) Combustion Controls were installed in a separate project, in 2019. The burner is equipped for Natural Gas Firing, as well as Number 2 Fuel Oil with the option for either compressed air or steam atomization. The back-up (Propane) pilot system is via a small (portable) bottle, connected by a temporary hose- when needed. The Burner Flame Safeguard system is a Fireye YB110, with a Fireye YZ300 Expanded Annunciation Module and a Fireye 45UV5 Scanner- all original to the 2011 project. Item #1 Replace Boiler #2 Burner Assembly and Controls - The existing Webster Burner for Boiler #2 is damaged from a fire side explosion and shall be replaced in kind as listed as the same model identified in the above background (Webster model HDSXC-105C-9V-750 Burner). All existing burner fuel train field devices (for both gas and fuel oil) located downstream of their associated isolation valve shall be replaced in kind. All burner atomization field devices located downstream of associated isolation valve shall also be replaced in kind. Replace the burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Replace all existing field devices for combustion air in kind (See Attachment D - List of field devices to be replaced). All existing field devices being replaced shall be handed over to the VA for spare parts. The existing MICROMOD and Fireye controls systems shall remain. a.) The contractor shall inspect the existing burner, field devices, and control systems serving Boiler #2 including all wiring and integrations points. Document current operational parameters and deficiencies. The VA shall provide the contractor with the as-built wiring diagrams of the existing MICRO MOD Burner Management System. Contractor shall field verify information from as-built documentation in the field and notify the VA COR of any discrepancies. b.) Provide submittals of all equipment, field devices, and materials to be installed under contract for VA review and approval. c.) Delivery Upon approval of submittals, Contractor shall order and then deliver the replacement equipment and material to site. d.) Removal - Once the replacement burner is delivered to site, the contractor shall safely disconnect and remove the existing burner, field devices, associated wiring, and fuel connections. Contractor shall hand over existing equipment and field devices to VA who will use equipment for spare parts. e.) Installation and Integration Contractor shall set the replacement burner and field devices in place and make all necessary connections to the existing Victory boiler and existing MicroMod system as well as all electrical and utility connections. Make connections to fuel supply, electrical systems, and control panels. Integrate new controls with existing boiler hardware. f.) Start Up - Contractor shall start up replacement burner. g.) Testing & Commissioning a. Once boiler is refilled, Contractor shall perform a hydrostatic test to ensure that there are no potential tube leaks on Boiler 2. b. Contractor shall calibrate all gauges and transmitters and test for proper operation on Boiler #2. Submit all test reports to VA COR c. Perform operational tests, combustion analysis, and adjustment to ensure optimal performance. Submit a completed Combustion Test Report showing the results from the combustion test. Use the attached Combustion Test Report, Attachment C. d. For controls, program control logic for optimal efficiency and safety. Conduct functional and safety tests, including failover and alarms systems. Submit all test reports to VA COR e. Contractor shall test all safety devices and tune the combustion on Boiler 2 using the testing methods specified in the VHA Boiler and Associated Safety Device Testing Manual, Eighth Edition (See Attachment A). Submit the completed test reports from the Safety Device Testing Manual to the VA COR. h.) Training Provide basic operational and maintenance training to VA staff i.) Deliverables - Contractor shall provide all manuals and warranty documentation, test and commissioning reports, operator training completion certificates. j.) Standards and Compliance All work must comply with applicable local, state, and federal codes, as well as manufacturer s specifications and safety regulations. Acceptance Criteria The project will be considered complete when Boiler 2 with its replacement burner operates in accordance with manufacturer s specifications and testing requirements, passes all VA performance and safety inspections, and documentation is delivered to the VA. VA performance and safety inspections shall be considered passed when Boiler #2 with its replacement burner successfully passes the tests mentioned in this Statement of Work (SOW) and all tests outlined in the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition and all fully completed test reports, as described in this SOW and the Safety Device Testing manual, is submitted to the VA. OTHER REPAIR SERVICES TO BE PERFORMED UNDER THIS CONTRACT The scheduling and completion of work items not contingent upon the delivery and installation of the replacement burner for Boiler 2 can be scheduled and performed any time after the issuance of the NTP but must be completed and accepted by the VA prior to the completion date of the contract. Item #2: Replace the damaged refractory in Boiler #2 Replace the refractory around the boiler throat to match existing refractory as installed by boiler manufacturer. Consult with Victory Boiler on their recommended replacement method and design. Provide Victory s recommendation to the VA COR prior to replacement. (NOTE: This work item must be performed prior to the installation of the replacement burner). Item #3: Provide hard piped atomizing train to Burner #2 Current piping configuration on the atomizing train (for steam and air) does not meet VA requirements. Re-pipe both steam and air atomization chains to be in compliance with VA Standard Detail SD235239-04 (See Attachment B). Item #4: Install propane header sized for proper capacity to accommodate all four boilers in the Boiler Plant. Propane is used for fueling each burner s pilot ignition. The existing propane delivery system in the Boiler Plant is inadequate per VA specifications. Contractor shall hire engineering services to evaluate the capacity needed for the Webster burners on all four (4) boilers and to size an alternate pilot propane tank, main header, and branch piping to the Boiler #2 burner. Main header shall have T connection for future installations to burners on Boilers 1, 3, and 4. The size of the propane tank and main header shall have the capacity to supply four (4) Webster burners in the plant. For bidding purposes, assume that a 200 gallon pad mounted propane tank is needed just outside of the Boiler Plant and a 250 long header of 1 black iron pipe is needed to be hung in front of all four (4) existing boilers. Install black iron branch piping down to Boiler #2 replacement burner per standard detail 235239-04. Replace (2) existing Low Pressure Gas (LPG) Pilot field devices in kind (Low Pressure Cutoff Switch and LP Safety Solenoid Valve). Provide tee connections on main header for future hard pipe branch piping to other 3 boilers in Boiler Plant. Hydrostatic test new tank and piping per VA specifications. When ready for testing of new burner for Boiler #2, fill tank full with propane. Item #5: Replace Oxygen Sensor on Boiler #2 Contractor shall install one (1) VA furnished sensor on breach of Boiler #2. Calibrate and test operation with new controls system. Item #6: Hydro blast or mechanically clean internal tubes on Boiler #2 to reduce build up. Item #7: Repaint the exterior of Boiler #2 around the burner casing with high temperature resistant paint. Prep surface of boiler prior to painting. (NOTE: This work item must be performed prior to the installation of the replacement burner). GENERAL REQUIREMENTS . Prior to submission of proposal, all prospective bidders shall make at least one site visit to the Montrose Campus to become familiar with the scope of work and the existing conditions. During this visit, bidders must document all of the field devices on the fuel and atomizing train to be replaced. These devices will be tagged by VA personnel prior to the visit. Coordinate the date and time of the visit with the VA COR.
After award, the VA will provide the contractor with the existing floor plans of the Boiler Plant in AUTOCAD and PDF format along with all pertinent information of the existing equipment and controls. All work shall be designed in strict compliance to the VA Boiler Guide and VA specifications. . Contractor shall complete required paperwork to obtain PIV badges for all workers in compliance VA badging policy. . The contractor shall submit submittals of all materials and equipment to be used on the project. All materials and equipment submittals shall be APPROVED prior to purchase of items. . The contractor shall submit a project CPM schedule per VA specs. . Provide four (4) week advance notice to VA COR for planned utility shutdowns required to perform work. . Follow facility s Lock Out Tag Out (LOTO) policy procedures. . Follow facility s Confined Space policy procedures prior to and during work inside of boiler. . All the other existing controls systems in the Boiler Plant serving Boiler s 1, 3, and 4 shall remain and their system functionality shall not become impaired or rendered inoperable in any way due to the actions required under this contract for the duration and the completion of the contract.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
SLED
Bradshaw Unit - Install HVAC Inmate HousingThe Texas Department of Criminal Justice is soliciting proposals to install new heating, ventilation, and air conditioning systems at the Bradshaw Unit in Henderson, Texas, specifically targeting inmate housing areas. The project requires the installation of new 10-ton condensers and air handlers equipped with gas duct furnaces to replace existing infrastructure and ensure proper climate control within the facility. The solicitation, identified as 696-FD-26-P050, was posted on July 21, 2026, with proposals due by August 31, 2026, and is being managed by the state-level agency under the SLED classification. All work must be performed at the designated location in Texas, and interested bidders are expected to meet technical and operational requirements for institutional HVAC installations. Alicia Duke of the Texas Department of Criminal Justice serves as the primary point of contact for inquiries, reachable via phone at 936-437-3839 or email at alicia.duke@tdcj.texas.gov. The procurement is conducted through the Texas SmartBuy portal, where additional details and submission guidelines can be accessed. There is no specified set-aside or NAICS code provided in the solicitation, and all eligible contractors are encouraged to respond with comprehensive proposals detailing equipment specifications, installation timelines, staffing, and compliance with safety and security standards applicable to state correctional facilities.
Texas Department of Criminal Justice

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
SLED
Fire Station 1 Tower Fire Suppression ReplacementThe City of Oxnard is soliciting sealed bids for the Fire Station 1 Tower Fire Suppression Replacement Project under Solicitation No. FD 26-99, with a required submission deadline of 2:00 p.m. on August 12, 2026. The project entails the complete repair and restoration of the existing fire suppression system located at 491 South K Street in Oxnard, California, and requires bidders to provide all labor, materials, equipment, and related incidental work necessary to meet the specifications outlined in the contract documents. Bidders must obtain all project information exclusively through the City’s electronic bidding portal on Planet Bids, and no bid documents or inquiries will be accepted through any other channel, including the Public Purchase platform, which is not the official plan room for this solicitation. All inquiries must be directed through the designated point of contact, the Public Works Projects Department, via email at pw-publicprojects@oxnard.org or by phone at (805) 385-8280. The city has explicitly instructed prospective bidders not to post questions on any public forum, emphasizing direct communication through official channels. The solicitation is issued under the authority of the City of Oxnard, a state and local government entity operating in California, with no specific set-aside or NAICS code designated. Bidders are expected to review all contractual terms, scope requirements, and submission protocols through the Planet Bids portal to ensure full compliance with bidding procedures and project expectations.
City of Oxnard

POSTED

about 17 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238220
New
International
Provision for the Renovation of the Morgue and the Supply, Installation, Commissioning and, Five (5) Years of Preventative Maintenance of a 30-ton Air Conditioning Unit for the Morgue at the Kingston Public HospitalThe contract entails the comprehensive renovation of the morgue at Kingston Public Hospital alongside the supply, installation, commissioning, and five years of preventative maintenance for a 30-ton air conditioning unit specifically designed to meet the rigorous environmental demands of the facility. The scope requires full integration of the cooling system into the renovated space, ensuring temperature and humidity control critical for proper body preservation and operational hygiene. All work must comply with applicable health and safety standards, and the five-year maintenance period mandates regular servicing, prompt repairs, and performance monitoring to guarantee uninterrupted system reliability. This solicitation is issued by the South East Regional Health Authority under the Government of Jamaica, with the response deadline set for August 26, 2026. The project is part of broader infrastructure improvement efforts within public health facilities and emphasizes long-term service sustainability through included maintenance obligations. All bids must demonstrate capacity to execute both construction and technical installation tasks, with experience in medical facility upgrades and industrial cooling systems strongly implied as essential. The contract is publicly accessible through the Jamaica Government e-Procurement Portal, though no set-aside provisions or NAICS classification have been specified.
South East Regional Health Authority

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
SLED
HVAC Maintenance FY27The Contractor is required to provide comprehensive HVAC maintenance and repair services for all building systems, ensuring routine preventative care that minimizes downtime through scheduled inspections and proactive servicing performed to the highest industry standards. This includes full labor and material coverage for all necessary components such as filters, belts, refrigerant, oil, grease, water treatment, touch-up paint, and mechanical and electrical parts required to keep equipment operating per manufacturer specifications. The scope extends to refrigeration units like ice machines and walk-in coolers, and requires replacement of worn or failed moving parts including bearings, motors, actuators, controls, and burners, with prior system troubleshooting before any work begins. The Contractor must maintain on-site staffing, tools, equipment, and vehicles to support service during normal business hours Monday through Friday, 8:00 A.M. to 5:00 P.M., excluding recognized holidays, and must also respond to urgent issues outside those hours. All work must comply with Federal, State, CARB, AQMD, OSHA, and all other applicable regulations. The Contractor is responsible for providing a detailed inventory of all repairable and replaceable equipment and must consult with the City representative prior to replacing any non-repairable unit, offering an estimate for an equivalent replacement. Work explicitly excluded from this contract includes original system design and installation, utility service issues, non-moving components like heat exchangers and piping, gas and water supply lines, ductwork, air balancing, thermal insulation, damage from misuse or vandalism, alterations by third parties, catastrophic natural events, structural modifications, electrical service beyond HVAC equipment, electrolysis, government or insurance-mandated work, and individual ceiling-mounted restroom ventilation fans. The solicitation, titled HVAC Maintenance FY27 and identified as 320-190526AG, is issued by the City of Rocky Mount in North Carolina, with responses due by August 6, 2026, and primary point of contact listed as Alicia Gaines.
City of Rocky Mount

POSTED

about 18 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238220
New
Federal
Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC -The contract pertains to the Replace Boiler Stack Rome CBOC project under solicitation number 36C24226R0084, issued by the Department of Veterans Affairs, Network Contracting Office 2, with a placement of performance at 125 Brookley Road, Rome, NY 13441. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside procurement under NAICS code 238220, with an estimated contract value between $500,000 and $1,000,000. The scope of work requires the contractor to supply all labor, materials, tools, equipment, and supervision to demolish two existing boiler exhaust stacks, one generator steam relief stack, and the associated concrete/masonry chimney structure, followed by the installation of two new steel boiler exhaust stacks, a steel support structure, and one steel generator exhaust pipe, including sealing the existing roof. All technical specifications, including details on boiler type, condensing or non-condensing characteristics, are to be obtained from an attached Boiler Spec document, which is not provided but referenced as available through SAM.gov. The solicitation is in presolicitation phase, with formal RFP documents to be accessed only via the SAM.gov portal, and all amendments, including the continuation of SF 30 Block 14 Amendment Description 0002, must be downloaded and incorporated by offerors. Proposals must be submitted exclusively via email to the Contracting Officer at Michael.Spivack@va.gov or the Contract Specialist at Ryan.Seburn@va.gov by the deadline of April 14, 2026, at 10:00 AM Eastern Time, and bid bonding is mandatory upon the release of the formal solicitation. The contracting office is located at 3495 Bailey Avenue, Building 3, 2nd floor, Buffalo, NY 14215, and no details regarding delivery schedules, payment terms, invoicing methods, or point of contact for contract administration beyond the contracting officer and specialist have been disclosed.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 23 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238220
New
Federal
R425--Fire Sprinkler Inspection, Maintenance & RepairsThis solicitation is a combined synopsis and request for quotations issued under FAR subpart 12.6 for commercial items, seeking Fire Sprinkler Inspection, Maintenance & Repair Services for the San Diego VA Medical Center. The procurement is designated as a Service-Disabled Veteran-Owned Small Business Set Aside under NAICS code 238220, with a small business size standard of $19 million in average annual receipts. The contract requires contractors to perform inspections, testing, and maintenance of fire sprinkler systems and fire pumps in strict compliance with NFPA 13, NFPA 25, and The Joint Commission standards, and all offerors must possess valid asbestos certifications. All communications must be directed solely to the Contracting Officer, Charity Cazee, at Charity.Cazee@va.gov, and contractors are prohibited from contacting any VA Medical Center personnel directly. Proposals must be submitted in writing via email by July 27, 2026, at 12:00 PM PST, with no late submissions accepted. The place of performance is clearly identified as San Diego, California, and all vendors must be currently registered in SAM.gov with a valid Unique Entity Identifier and provide a Taxpayer Identification Number. Payment will be processed through the Treasury’s Automated Clearing House system, requiring EFT/ACH enrollment. While no contract value is specified, the requirement includes comprehensive documentation of all work performed and adherence to federal procurement regulations. Offerors are reminded that no separate solicitation document will be issued, and all instructions must be followed as outlined in the RFQ’s Instructions to Offeror.
262-NETWORK Contract Office 22 (36C262)

POSTED

about 23 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)

Same awarding agency

NAICS: 334516
New
Federal
6515--SomnoFlo Electronic Vaporizer Systems Brand Name or EqualThe Department of Veterans Affairs is conducting market research to identify qualified small business vendors capable of supplying SomnoFlo LowFlo Electronic Vaporizer systems or equivalent equipment for use across four surgical stations at the VA New Jersey Health Care System. The system is designed to directly connect to animals via an induction chamber and nose cone for both anesthesia induction and surgical procedures, automatically calculating and delivering precise isoflurane doses based on individual animal weight to minimize risks of over- or under-anesthetization. The purchase includes four dedicated electronic vaporizers along with matching low-profile anesthesia masks in small, medium, and large sizes for animals under 100g and 300g, as well as XX-small and small induction chambers compatible with low-flow vaporizers. The goal is to replace an aging, portable system that has caused wear and safety concerns, by installing fixed, station-specific units to improve reliability, extend equipment lifespan, and enhance staff safety. Vendors must demonstrate the ability to supply the specified brand-name equipment or acceptable equivalents, provide product literature for alternatives, and confirm their business size classification including Small Business, SDVOSB, VOSB, or other small business designations. Responses must include company details, UEI and SAM registration status, capability statements related to surgical or endoscopic equipment supply, estimated delivery timelines—ideally within seven days of order receipt—and any existing federal contract vehicles such as GSA, VA FSS, or SAC that facilitate purchase. Warranty information and compliance with the specified technical requirements are also required. This sources sought notice is strictly for market research and does not represent a solicitation or commitment to award a contract; all responses must be submitted by 10:00 AM Eastern Time on July 21, 2026, and the government will not reimburse any costs incurred in responding.
Analytical Laboratory Instrument Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details
NAICS: 334516
New
Federal
6640--EQUIPMENT - on-demand slide labeling system and cassette labeling printerThe Department of Veterans Affairs, through its VISN 02 Network Contracting Office, is issuing a Request for Information (RFI) to identify potential sources capable of supplying on-demand slide and cassette labeling systems for the Hudson Valley Medical Center in Wappingers Falls, NY. This RFI is strictly for market research and planning purposes and does not constitute a solicitation or binding obligation. The VA seeks two on-demand slide labeling printers and one cassette labeling printer, both designed for high-volume, unattended operation in a histology laboratory environment. The systems must print durable, legible text and barcodes directly onto standard microscope slides and tissue cassettes, with the capability to withstand standard histological processing including formalin fixation and paraffin embedding. Both devices must support 1D and 2D barcodes, operate with universal power input, meet specific environmental and dimensional requirements, and comply with CE marking and IEC 61010-1 safety standards. The cassette printer must have a minimum input/output capacity of 150 cassettes, print at 600 cassettes per hour, and use thermal transfer without ink or labels. The slide printer must accommodate a minimum of 320 slides, operate at high speed, and be compatible with frosted and specialty-coated slides. Vendors must also provide 10 thermal transfer ribbons and five rolls of hot foil transfer paper for five years, and replacement equipment must be new, not refurbished. Responses are requested from manufacturers, distributors, or providers of equivalent solutions who can demonstrate compliance with the salient characteristics and acceptance criteria, including a 99.5% barcode scan success rate and seamless integration with laboratory information systems. Respondents must disclose their business size classification under NAICS code 334516, whether they are small or large businesses, their status as SDVOSB, VOSB, WOSB, HUBZone, or large business, and whether the products are manufactured domestically. Federal contract holders must indicate relevant contract numbers and availability of items under those agreements. Pricing information is encouraged for market research only and will not be used for evaluation. Responses must be submitted via email by August 3, 2026, and must include company details, point of contact, Sam.gov Unique Entity ID, and feedback on the specifications. The VA prefers U.S.-manufactured items and will review all responses to determine whether to proceed with a formal solicitation at a later date. Participation in this R
Analytical Laboratory Instrument Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 12 days
View Details
NAICS: 339113
New
Federal
6530--STERILE PROCESSING SERVICE STORAGE SYSTEMThe U.S. Department of Veterans Affairs is seeking commercial solutions through a total small business set-aside solicitation for a custom-designed Sterile Processing Service Storage System at the Brooklyn Campus of the VA New York Harbor Healthcare System. The acquisition, identified by solicitation number 36C24226Q0756 and NAICS code 339113 with an 800-employee small business size standard, requires a mobile, modular, stainless steel storage system configured precisely to the layout of the Sterile Storage area as specified in Drawing SR-5324.001.03REV1. The system must include 11 Elevation A Mobile Starter Bays, 28 Elevation A Mobile Addon Bays, 3 Elevation B Mobile Starter Bays, and additional specialized bays across Elevations B through F, totaling 57 units, along with 11 aisle signs. Each rack must be color-coded by service, have labeled individual tray locations, adjustable open-wire or fine-mesh shelves with rounded corners to prevent damage to sterile wraps, and include drawers with adjustable dividers for loose instruments in peel packs. All racks must be mounted on wheels with removable covers to enable safe, efficient movement during environmental anomalies and to facilitate cleaning. The vendor is responsible for conducting a mandatory site walkthrough to verify dimensions and ADA compliance, submitting installation documentation, assembling and installing all components within three business days during normal work hours, and providing a ten-year warranty with a 30-day period for free on-site modifications post-installation. The contract requires full compliance with Federal Acquisition Regulation provisions related to small business set-asides, Buy American Act certifications, limitations on subcontracting, tax matters, trafficking in persons, recovered materials, and security prohibitions. Offerors must be small businesses that either manufacture the end product or qualify as nonmanufacturers under SBA regulations, and must submit signed certifications for both the Buy American Act and subcontracting limitations, as well as proof of being an OEM or an authorized dealer, distributor, or reseller. The system must be delivered to and installed at 800 Poly Place, Brooklyn, NY 11209, with all shipping and handling included. Contractors must complete VA Privacy Training annually for employees, and must affirm their adherence to non-discriminatory DEI practices. Quotations must include a signed statement accepting all solicitation terms without modification, submitted in PDF format, and received no later than July
Surgical Appliance and Supplies Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Z2LZ--Project: 528A7-25-502 Replace Trench DrainsThe Department of Veterans Affairs, through Network Contracting Office 2, intends to award a construction contract for replacing trench drains and performing associated improvements at the Syracuse VA Medical Center located at 800 Irving Avenue in Syracuse, New York. This project includes replacing existing trench drains and sump boxes in Parking Lot 1 and at Building 16, installing a new off-grid solar security light with reinforced concrete foundation, and performing asphalt crack sealing, seal coating, and pavement striping in Parking Lot 1. Additional work encompasses excavation, demolition, concrete placement, underground drainage connections, site restoration, and traffic control measures, all to be completed in accordance with the final solicitation documents. The total project value is estimated between $100,000 and $250,000 and must be completed within 120 calendar days from the Notice to Proceed. This procurement is exclusively reserved for Service-Disabled Veteran-Owned Small Businesses, with the North American Industry Classification System code 237990 and a size standard of $45 million in annual revenue. All prospective bidders must be currently registered in SAM.gov and D&B’s DUNS database and must be verified as an SDVOSB through the SBA’s certification portal at the time of submission and before award. The official solicitation is expected to be posted on SAM.gov on or about August 10, 2026, with proposals due by August 24, 2026. Contract details, including drawings, specifications, and submission instructions, will be available only through the official solicitation, and all inquiries should be directed to Contract Specialist Delf Saco Mizhquiri at the provided contact information.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 811210
New
Federal
J059--Special Notice of Intent to Sole Source - FY27 SERVICE - Motorola LMR Service and Maintenance (Base Plus 4) | Canandaigua VA Medical CenterThe Department of Veterans Affairs, VISN 2 Network Contracting Office, intends to award a sole source contract to Motorola Solutions, Inc. for comprehensive maintenance and support of the existing Motorola Land Mobile Radio (LMR) system at the Canandaigua VA Medical Center in New York. The contract will include a one-year base period beginning October 1, 2026, followed by four optional one-year periods, all on a firm-fixed-price basis. The work involves full service and preventative maintenance of VA-owned Motorola LMR infrastructure, including service desk operations, remote and onsite technical support, hardware repair, security patching, software updates, hardware upgrades, system integration, and compliance with original equipment manufacturer specifications. Only Motorola Solutions, Inc., as the authorized OEM, is considered capable of fulfilling the requirement under FAR 6.103-1, due to its exclusive authority to service the proprietary equipment. All services must be performed using certified personnel and facilities qualified directly by Motorola Solutions, Inc., and the government reserves the right to verify these qualifications at any time during the contract period. The contractor is required to provide labor, tools, materials, and oversight necessary to ensure continuous operational reliability and alignment with VA security and federal standards. A detailed service desk system must track all service requests and incidents, and all repairs must include depot-level capabilities for both Motorola and specified third-party components. Responses to this special notice are requested within ten calendar days for market research purposes only, to identify potential small business competitors, but no competition is anticipated. The NAICS code is 811210 with an estimated value of $34 million. No funding has been appropriated, and responses are not reimbursable. All parties must be registered in SAM.gov and submit business information, socioeconomic status, and demonstrated technical capability via email to the designated Contract Specialist by the specified deadline.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 8 days
View Details