This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on October 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
J045--Repair Boilers #2 and #3 White City SORCC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive repair and maintenance services for Boilers #2 and #3 at the White City Southern Oregon Rehabilitation Center and Clinics (SORCC) in Oregon. The scope of work includes removing and reinstalling burner components, replacing damaged studs, and repairing refractory materials on the boilers’ burner mounting rings and Morrison tubes. The contractor will also reattach all piping and electrical connections, ensure proper firing on natural gas and fuel oil, and perform refractory curing as needed. Additional tasks include replacing studs on the windbox access cover of Boiler #3 while onsite. All work must be performed by licensed professionals, with welding supervised by a licensed boiler maker and electrical work by a licensed electrician, with proof of licensing required prior to commencement. The project is expected to take approximately 30 to 45 days, with a final schedule to be confirmed in the solicitation. The procurement process is managed by the VA’s 260-NETWORK Contract Office 20, with a solicitation posted on October 21, 2025, and responses due by October 28, 2025. The project is categorized under NAICS code 238220, indicating specialized industrial repair services, and is valued at an estimated $19 million. The solicitation includes amendments to clarify site visit details, which are scheduled for October 24, 2025, at 10:00 AM Pacific time. The work will adhere to wage standards set by the Department of Labor’s Wage Determination 2015-5571, Revision 26, ensuring compliance with prevailing wage and fringe benefit requirements. The contract aims to ensure the boilers are fully operational, firing on both natural gas and fuel oil, and to document all findings and recommendations in a comprehensive report.
General Info
Contract Value
$32,000Place of Performance
White City SORCC 8495 Crater Lake Hwy, WASet-Aside
Awardee
STERILECO LLCAward Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
SITE VISIT: 10/24/2025 @ 10AM Pacific, White City SORCC Bldg. 229 - ask for Trevor or Stephen
Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.
More opportunities from Department Of Veterans Affairs → 260-NETWORK Contract Office 20 (36C260)
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
