J045--SOURCES SOUGHT NOTICE - REPLACE TWO STEAM PEDESTAL STYLE CONDENSATE PUMPS WITH TWO NEW PUMPS Washington DC VA Medical Center 36C24526Q0168
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
Set-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 20 days
- Springdale JCC –Recreation HVAC Repair or ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Sources Sought
Deadline has passed
Organization & Contact Information
Full Description
Response Instructions: Responses must be submitted by 10:00 AM (ET) by 12-23-2025, Responses to the information requested above must be submitted via email to Bill Pratt at •••••@•••••.•••Sign up to see this detail Respond: 36C24526Q0168 Sources Sought Notice | Company Name This request for information/sources sought notice is for planning purposes ONLY and does not constitute a solicitation, responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open competition, etc.).
Scope of Work:
STATEMENT OF WORK (SOW) STEAM CONDENSATE PUMP REPLACEMENT WASHINGTON DC VA MEDICAL CENTER 50 IRVING ST. NW, WASHINGTON DC 20422
1.0 Project Objective The objective of this project is to replace two existing pedestal-style steam condensate pumps (Pump P-1 and Pump P-2) with new, specified pump models, ensuring the reliable and efficient return of steam condensate to the boiler system. This includes all necessary mechanical, electrical, and piping modifications.
2.0 Scope of Work (SOW) The contractor shall furnish all necessary labor, supervision, materials, tools, equipment, and services required to complete the installation of the new pumps as specified below.
2.1 Pre-Installation and Safety     Safety Plan: Develop and submit a site-specific safety plan (including Lockout/Tagout procedures).     System Shutdown: Coordinate and execute the safe shutdown, isolation, and draining of the condensate return system and associate steam/utility lines for the existing pumps.     Containment: Provide necessary containment and temporary bypass for condensate overflow, if required, to ensure continuous facility operation where possible.
2.2 Removal and Demolition     Disconnect Utilities: Disconnect all associated electrical power, control wiring, and piping (suction, discharge, vent, and equalization) from the existing pumps.     Pump Removal: Safely remove and dispose of the two existing pedestal-style condensate pumps (P-1 and P-2) from the mechanical room.     Preparation: Prepare the existing pad or mounting surface for the new pumps, including minor modifications or cleaning as necessary.
2.3 Installation of New Pumps     New Equipment: Furnish and install two new specified steam condensate pumps and motors (or a pre-packaged duplex unit) on the prepared mounting surface.     Note: Specify the exact make, model, capacity (GPM), and total developed head (TDH) for the replacement unit here.         Mechanical Installation: Securely anchor the new pumps/unit to the foundation.         Piping Installation:         Install new condensate suction and discharge piping and fittings to connect the new pumps to the existing header lines.         Install new isolation valves (ball or globe) and check valves on the discharge side of each pump.         Install new vents, overflow lines, and equalization lines as required by the new pump specifications.         Instrumentation: Install new pressure gauges and/or thermometers on the system as required for monitoring pump performance.
2.4 Electrical and Controls     Power and Wiring: Connect the electrical power supply to the new pump motors and control panel (if a packaged unit is used), ensuring proper sizing and adherence to all electrical codes.     Controls: Install and wire the necessary level controls (floats, probes, or transmitters) and the alternating switch/starter panel for duplex operation, including Hand-Off-Auto (H-O-A) controls.     Alarms: Connect the high-level alarm and any fault signals to the existing Building Management System (BMS) or local alarm panel, as specified. 2.5 Commissioning and Closeout         Testing: Hydrostatically test any new or modified piping for leaks.         Start-up: Coordinate with the facility team to re-introduce steam and condensate, and perform the operational start-up of the new pump system.         Performance Verification: Verify proper pump rotation, flow, pressure, and automatic alternation/operation.         Insulation: Re-insulate all new or disturbed piping and components.         Clean-up: Remove all debris, leftover materials, and old equipment from the site.         Training: Provide basic operational and maintenance training to the facility staff.
3.0 Deliverables The contractor shall provide the following upon project completion:         Commissioning Report: Documentation of all tests performed, verified pressures, flows, and successful operational start-up.         As-Built Drawings: Updated drawings or red-line markups showing the final configuration of piping and electrical connections.         Operating Manuals: Two (2) hard copies and one (1) electronic copy of all O&M manuals, cut sheets, and parts lists for the new pumps.         Warranties: Formal manufacturer and labor warranties.         Safety Closeout: Confirmation that all Lockout/Tagout and safety permits have been properly closed. 4.0 Schedule and Milestones         Duration: The estimated time for project completion is [X] working days.         Key Milestones:     1    Submission of Submittals (Safety Plan, Equipment Data): [Date/Days from Notice to Proceed (NTP)]     2    Delivery of New Equipment to Site: [Date/Days from NTP]     3    System Shutdown and Removal of Old Pumps: [Date/Window]     4    Mechanical and Electrical Completion: [Date/Window]     5    Commissioning and Final Turnover: [Date/Window]
5.0 Responsibilities Party Responsibility Contractor All work defined in Section 2.0, including procurement, installation, testing, and clean-up. Provide all skilled traders and certified personnel. Owner/Facility Grant site access, coordinate and approve system shutdown timing, provide access to existing utilities (power, steam, etc.), and provide a point of contact for coordination.
More opportunities from Department Of Veterans Affairs → 245-NETWORK Contract Office 5 (36C245)
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS