36C25027Q0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Veterans Affairs, Network Contracting Office 10, has issued a Sources Sought notice for Repair Emergency Power Phase 2 at the Cincinnati VAMC. The project aims to restore full emergency backup power functionality for Building 1, which is currently vulnerable due to failed generators and associated paralleling switchgear. The scope of work includes replacing two damaged MFR13 and reverse power relays, performing necessary programming, wiring, and door modifications, and updating ABB systems drawings. The contractor must ensure the facility maintains generator availability throughout the project, with work performed on two separate weekends to minimize disruption. Technical requirements include providing a 125 percent load bank to test two 1500kW generators and verifying the paralleling switchgear functions as intended. The project has a performance period of 90 calendar days and requires a one year warranty on all labor and materials. Supervision will be provided by the Cincinnati VAMC Engineering Service, and final acceptance will be conducted by the Project COR. Interested firms are requested to provide their socio-economic status, available contract vehicles, and any alternative NAICS codes to the contracting officer for acquisition planning purposes.

General Info

Repair and restore emergency backup power systems at the Cincinnati VAMC facility.

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

OH

Set-Aside

NONE

Documents

1

Sources Sought: Emergency Switchgear Repairs 539 - Cincinnati VAMC

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Contacts1 person available
OfficeDAYTON, OH, 45428, USA
Office AddressDAYTON, OH, 45428, USA
Contacts
Ronald T HeidemannContracting Officer

Full Description

Show more
The Cincinnati Veterans Administration Medical Center (VAMC) has a requirement to provide repairs to generator operation to address failed generators & associated paralleling switchgear.
The intention of this Sources Sought is to obtain information only. Please do not send a proposal. Requested information:
To aid acquisition planning, we re seeking capable and interested firms for the information requested. If your firm meets the criteria please send the point of contract (ronald.heidemann@va.gov) the following, via email: Firm s Name Socio-Economic Status Whether or not your company has a contract vehicle we can order against If your company believes there is an alternative NAICS code please provide this If your company has any questions please provide. Contract Title. Repair Emergency Power Phase 2
Background. The chosen contractor shall provide repairs to generator operation to address failed generators & associated paralleling switchgear at the Cincinnati VAMC. The fulfillment of the project will allow for testing & repairs/replacement of existing equipment as required to restore full emergency backup generator functionality at this facility. Additional repairs required were identified by ABB during the initial repair of paralleling switchgear and the report is on the last page.
Scope.
The scope of this contract is to provide recommended repairs for both of the generators at Building #1. This system is currently functioning with only one generator, leaving the facility vulnerable in the event of a power failure at this site. Key task is to restore full emergency backup power for the facility to facilitate repairs of the existing equipment. Key task is test emergency power system and verify it works as intended.
Specific Tasks.
Maintain emergency generator availability for the facility
Maintain security of the generator/switchgear room during the entire project.
Work on generators can only be performed on weekend with prior coordination with the VA.
Work will need to be done on two separate weekends, one weekend per generator work.
Provide required repairs for the associated paralleling switchgear system per diagnose reports from ABB which includes Saturday work. Work includes the following items as identified in the ABB repair report: Replace two damaged MFR13 and reverse power relay to new protective relay and all installation/testing for both generators. Programming changes required for these replacement relays to ensure proper system functionality. Door modification to support the installation and operation of the upgraded relays. Wiring modifications to accommodate the replaced relays. Changes to the existing ABB systems drawings for these replaced relays.
The General Contractor (GC) must coordinate as needed with the VA COR for testing of the generator control panels. Two new control panels (one per generator) have been installed. One control panel has been tested and verified to function as intended. The control panel on the inoperable generator requires testing and verification to ensure proper functionality.
GC must provide a load bank for testing of both Generator 1 and Generator 2 on this day. 125% of load bank required.
GC/subcontractor for paralleling gear work must test paralleling both Generator 1 (1500kW, 3 PH, 4W, 480Y/277V) and Generator 2 (1500kW, 3 PH, 4W, 480Y/277V) and verify it works with the 125% load bank.
GC and subcontractor for paralleling gear must change priority of generators to verify they come back online/and shed as designed.
GC and subcontractor for paralleling gear must provide a complete testing of the emergency power system including both generators and paralleling switchgear after all repair work is completed and verify it works as intended.
Performance Monitoring
Contract supervision will be conducted by the Project Section of Engineering Service at the Cincinnati VA Medical Center.
Inspection will be made throughout the project and delivery and installation.
Security Requirements   7.1 The C&A requirements do not apply and a Security Accreditation Package is not required   Cincinnati VA Medical Center (CVAMC) Record Management Clause.    1.  Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.     2.  In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.     3.  In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.     4.  Cincinnati VA Medical Center (CVAMC) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of CVAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.  In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to CVAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230.    5.  The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the Statement of Work. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to CVAMC control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the Statement of Work. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).    6.  The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and CVAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.    7.  The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with CVAMC policy.     8.  The Contractor shall not create or maintain any records containing any non-public CVAMC information that are not specifically tied to or authorized by the contract.     9.  The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.     10.  The CVAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which CVAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.    11.  Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.     [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.  TMS Course 10203, VA Privacy & Information Security Awareness will be used to satisfy this requirement.      12.  The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this Statement of Work and require written subcontractor acknowledgment of same.     13.  Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.    Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).
None.
Other Pertinent Information or Special Considerations.
a. Identification of Possible Follow-on Work.
None.
b. Identification of Potential Conflicts of Interest (COI).
None.
c. Identification of Non-Disclosure Requirements.
None.
d. Packaging, Packing and Shipping Instructions.
None
e. Inspection and Acceptance Criteria.
Project COR to conduct the final acceptance of satisfactory installation. Risk Control None
Place of Performance.
This product will be used at the Cincinnati VAMC, specifically within the generator and electrical rooms.
Period of Performance.
90 calendar days including equipment/material lead time.
Delivery Schedule.
TBD
Technical/Administrative Requirements
Contracted work shall be conducted in accordance with the below VA Specifications.
Warranty
Contractor must provide a one (1) year warranty to include all materials and labor.
ABB Report
Julie,
After reviewing the project requirements and available options, it has been determined that the only viable solution is to upgrade the MFR13 Relay.
The upgrade is expected to be more expensive than originally anticipated because the scope of work extends beyond simply replacing the relay. The upgrade will also require: Programming of the upgraded relay to ensure proper system functionality. Door modifications to support the installation and operation of the upgraded relay. Wiring modifications to accommodate the upgraded relay Changes to the existing systems drawings for the upgrade.
Due to these additional labor and material requirements, the total project cost will be higher than our initial estimate. While this was not anticipated as the solution, these modifications are necessary to ensure the system functions properly.
Please let us know if you would like us to prepare a quote outlining the additional costs associated with this work for your review. I believe a similar quote was provided in 2025 for the relay upgrade.
If you have any questions or would like to discuss the project in more detail, please feel free to reach out.
Thanks, Brian Bednar Area Field Service Project Manager Mobile: 984-303-5371 fred.ervin@us.abb.com

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
Federal
J041--Walkin Freezer Repair
Solicitation # 36C24127Q0010
The Department of Veterans Affairs, Network Contracting Office 1, is soliciting quotes for a firm-fixed price contract to repair Freezer 10 at the West Haven VA Medical Center in Connecticut. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and falls under NAICS code 811310. The scope of work includes providing all labor, materials, and equipment to replace piping, cabling, and associated components to restore proper operating temperatures for Nutrition and Food Services. Key requirements include a mandatory pre-bid site visit on October 14, 2026, and a three-day temperature trending period following the repair to validate performance. To be eligible for award, contractors must be verified in the SBA VetCert database and maintain a field service representative within 200 miles of the facility. Personnel must hold OSHA 10-hour construction certifications, with the site competent person holding an OSHA 30-hour certification. The selected contractor must provide a minimum two-year warranty on all parts and labor and submit a final documentation report within 10 business days of completion. Evaluation will be based on the Lowest Price Technically Acceptable (LPTA) criteria, requiring a technical capability statement, an itemized price schedule, and proof of site visit attendance. Quotes are due by October 19, 2026, at 10:00 AM Eastern Time.
241-NETWORK Contract Office 01 (36C241)

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details
NAICS: 811310
New
Federal
CRAC Maintenance Service
Solicitation # W50S8R27Q0001
Solicitation W50S8R27Q0001 is a 100% small business set-aside request for quotation for a firm-fixed price contract to provide Computer Room Air Conditioning (CRAC) preventative maintenance and 24/7 emergency repair services. The work will be performed at B409, located at 1947 Harrington Memorial Road, Mansfield, Ohio. The contract consists of a one-year base period from November 15, 2026, to November 14, 2027, with four additional one-year option periods, for a total potential duration of five years. The scope includes all personnel, equipment, and materials necessary to maintain precise temperature and humidity levels in data centers, with a strict requirement for emergency on-site arrival within four hours of notification. Award will be based on the most advantageous offer considering price, technical capability, and past performance. Technical evaluations focus on technician qualifications, requiring EPA Section 608 Universal Certification and a minimum of two years of experience in mission-critical facilities, as well as a detailed technical approach narrative. Offerors must submit their quotes in three volumes covering technical factors, past performance, and price by October 26, 2026. The contractor is required to maintain a Quality Control Plan and adhere to OEM, ASHRAE, and EPA standards, while utilizing the Wide Area WorkFlow system for invoicing.
W7NU Uspfo Activity Ohang 179

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details
NAICS: 811310
New
Federal
Inspection & Testing of Electric and Diesel Fire Pumps, Engines, Controllers, and Oil/Water Separator at NWS Earle, BLDG R38
Solicitation # N4008526R0270
Solicitation N4008526R0270 is a firm-fixed-price request for proposal issued by NAVFAC/SYCOM Mid-Atlantic for construction services at Naval Weapons Station Earle in Leonardo, New Jersey. The project involves the comprehensive inspection and operational testing of electric and diesel fire pumps, motors, engines, controllers, and an oil/water separator located in Building R38. Due to previous fire damage and prolonged inactivity, the contractor must perform pre-start diagnostics, including borescope inspections and insulation resistance tests, before operating the equipment. All work must adhere to NFPA 20, NFPA 25, UFC, OSHA, and EPA standards. Key deliverables include a comprehensive written report with performance curves and deficiency assessments due within ten business days of completion. This requirement is a 100 percent set-aside for small business concerns and will be awarded using the Lowest Price Technically Acceptable process, evaluating total proposed price and past performance. The period of performance requires the contractor to begin within 15 calendar days and complete all work within 60 calendar days of the Notice to Proceed. Proposals must be submitted via email to the designated contracting personnel by October 16, 2026, at 1100 EST. There are no bonding requirements, but contractors must maintain specific insurance coverages and meet strict military base access security standards, including Real ID and criminal background checks.
Navfacsyscom Mid-Atlantic

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
J041--NTX – Preventive and Corrective Maintenance for Ice
Solicitation # 36C25727Q0009
The Department of Veterans Affairs, Network Contracting Office 17, is soliciting proposals for preventive and corrective maintenance of government-owned ice machines across the VA North Texas Health Care System, including the Dallas VA Medical Center and Herzog Veterans Resource Center. This SDVOSB set-aside contract, under NAICS 811310, requires the contractor to provide all labor, materials, and supervision to ensure machines from Scotsman, Follett, and Manitowoc remain safe and operational. The scope includes quarterly preventive maintenance—consisting of cleaning, descaling, sanitation, and mandatory water filter replacement—as well as timely corrective repairs. Performance must adhere to OSHA, NFPA, EPA Section 608, CDC sanitation standards, and The Joint Commission Environment of Care requirements. The contract structure consists of a base period from November 9, 2026, to November 8, 2027, with four subsequent option years. Award will be based on a competitive best value selection using comparative analysis of technical capability, including the proposed approach and certifications, and past performance. Key mobilization milestones include submitting a maintenance schedule within seven days, full mobilization within fourteen days, and completing the initial preventive maintenance visit for all units within forty-five days of award. Contractors must maintain specific insurance coverages, including $500,000 in general liability and $200,000 in automobile liability, and ensure all waste materials and faulty parts are disposed of off-station.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)

Same awarding agency

NAICS: 811210
New
Federal
J065--Cadwell EMG Support Agreement Intent to Sole Source For Louis Stokes Cleveland VA Medical Center
Solicitation # 36C25027Q0028
The Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 10, intends to negotiate a sole source, firm-fixed price contract for a Cadwell EMG Support Agreement. This acquisition is specifically for the Louis Stokes Cleveland VA Medical Center located in Cleveland, Ohio. The government intends to award the contract to Cadwell Laboratories, Inc., identified by SAM UEI QNE2HHANKR23, as it is believed that this candidate is the only source possessing the required capabilities to successfully meet the requirement. This action is being conducted in accordance with FAR Subpart 13.2 and NAICS code 811210. This notice serves as a publication of the proposed contract action per FAR 5.201(b)(1) and is not a formal request for competitive proposals or a solicitation. However, under FAR 5.207(c)(16)(ii), other contractors may submit a capabilities statement or quotation to Contracting Officer Sara Wood via email by October 15th at 10:00 a.m. Eastern Time. Any such response must provide clear and convincing evidence that competition would be advantageous to the government. Additionally, the contract includes a specific deviation regarding the prohibition of racially discriminatory diversity, equity, and inclusion activities by federal contractors.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details
NAICS: 562119
New
Federal
P100--Facility Scrap and Recycling Services (Corrected)
Solicitation # 36C25026Q1050
Solicitation 36C25026Q1050 is a Request for Quotation issued by the Department of Veterans Affairs Network Contracting Office 10 for Facility Scrap and Recycling Services. This small business set-aside contract covers the removal, recycling, and disposal of scrap materials, including metals, wood, plastics, ceramics, and unserviceable equipment, from the Louis Stokes VA Medical Center and associated Community Based Outpatient Clinics in Cleveland, Ohio. The services are performed on an indefinite-delivery, on-call basis, requiring the contractor to provide all labor, equipment, and transportation. Key performance requirements include picking up materials within 48 hours of notification and remitting recycling proceeds to the Agent Cashier within 14 days of sale. The contract structure consists of a base period and four option periods, extending performance through October 14, 2031, with a guaranteed minimum value of 20,000 dollars. Award will be based on a comparative evaluation of administrative compliance, technical approach, price, past performance, and veterans preference. Technical evaluation focuses on the contractor's methodology for pickup and disposal, communication plans, and quality control. Offerors must submit a three-volume proposal consisting of administrative documents, a technical volume, and a pricing volume in native Excel format. Security requirements include background investigations per VA Directive 0710 and adherence to the VA Information Security Rule of Behavior.
Other Waste Collection

POSTED

about 12 hours ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS