Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Janfred Existing Utility Facility Infrastructure Maintenance Project Eliminating Tree Encroachments

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Janfred Existing Utility Facility Infrastructure Maintenance Project is a local utility maintenance initiative led by the Helix Water District in La Mesa, California, aimed at removing tree encroachments from an existing easement housing a 51-inch water transmission main. The work, scheduled between November 1, 2025, and February 14, 2026, is designed to ensure unobstructed access for ongoing and emergency maintenance without expanding or altering existing facilities. All tree removal activities are conducted outside the bird nesting season, and no trees involved are protected under state or local permitting regulations, allowing the project to qualify for CEQA Class 1 and Class 4 categorical exemptions that eliminate the need for environmental impact reviews or permits. The project site is located between 9475–9539 Janfred Way, with inspection and acceptance occurring on-site by the Helix Water District, which serves as the sole oversight entity. No federal contracting clauses, pricing structures, line-item costs, or standardized contract types such as FFP or IDIQ are included, as this is a non-competitive, administrative maintenance action governed solely under California environmental law. Administrative fees paid to San Diego County for filing are not reflective of service costs, and the project contains no formal invoicing, packaging, marking, or delivery requirements, nor any designated contracting officer, technical representative, or offeror certifications. The documentation provided is limited to a Notice of Exemption, a vicinity map, and project description, with no formal contract terms, evaluation criteria, or payment details beyond county filing procedures.

General Info

Tree removal in La Mesa easement for water main access, Nov 2025–Feb 2026, no environmental permits needed.

Agency

California → Helix Water District

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Janfred Way and Water Street, La Mesa, CA, 91942

Set-Aside

NONE

Documents

(1)

Janfred Existing Utility Facility Infrastructure Maintenance Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Helix Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Helix Water District
Office AddressN/A
Contacts
Debbie LundySenior Right of Way Agent/Environmental Analyst

Full Description

Show more
Tree removal and grooming to clear existing easement with existing utility facilities. Work is being done outside of the bird nesting season and none of the trees are protected by local or state permit regulations. This project enables crucial facility maintenance activities and facility access for ongoing and emergency maintenance. Work will commence between November 1, 2025- February 14, 2026.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Nez Perce - Clearwater National Forest - Kelly Forks Work Center Emergency Electrical Repairs
Solicitation # 1240LU26Q0105
The U.S. Department of Agriculture, through the Csa Intermountain 9 Usda-Fs office in Ogden, Utah, is soliciting quotations for Emergency Electrical System Repairs at the Kelly Forks Work Center in North Fork, Idaho, under solicitation number 1240LU26Q0105. This is a combined synopsis and solicitation issued under FAR Part 12 for commercial items, with no separate written solicitation to follow. The requirement is exclusively set aside for small business concerns, classified under NAICS code 237130 with a size standard of $45 million in annual receipts, and is structured as a Total Small Business Set-Aside, allowing all responsible small business sources to submit quotations. The opportunity was posted on July 16, 2026, and responses are due by August 3, 2026, at 11:00 PM Eastern Time. The place of performance is located in North Fork, Idaho, with the contract award expected to be managed from the agency’s office in Ogden, Utah. Primary point of contact for questions is Wes Dudley, Contracting Officer, reachable via email at wesley.dudley@usda.gov, with secondary support available from Ethan Hoctor at 208-702-3785. All proposed quotations must demonstrate the ability to perform emergency electrical repairs promptly and effectively in accordance with the scope of work, and submissions must be made through the SAM.gov platform using the provided UI link. Only small businesses meeting the size standard and deemed responsible will be considered for award.
Csa Intermountain 9 Usda-Fs

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237130
New
Federal
Solar Construction on New Building
Solicitation # 1232SA26Q0880
This contract solicitation, identified as 1232SA26Q0880, is a combined synopsis and solicitation issued under FAR Part 12 for the installation of a new solar array on the rooftop of an existing building at the Southwest Watershed Research Center in Tucson, Arizona. The acquisition is structured as a Total Small Business Set-Aside under NAICS code 237130, with a small business size standard of $45 million, and is open only to responsible small business concerns. The solicitation is an RFQ and no separate written solicitation will be issued; all quotations must be submitted by the deadline of August 7, 2026. The work includes electrical installations for a 12.47 kV primary and 208V/120V secondary system, final connections to the existing transformer, patching and repair of the roof membrane, and full project management. The performance period is set at 200 calendar days from the Notice to Proceed. All proposals must comply with numerous mandatory contract clauses, including labor standards under the Davis-Bacon Act, whistleblower protections, anti-trafficking requirements, and security protocols for information systems. Offerors must submit a fully completed SF 1442, a summary cover letter with SAM UEI and Tax ID, an acknowledgement of all amendments, and all specified attachments, including the Statement of Work, project specifications, PV drawings, pricing schedule, and wage determination. Failure to provide any required document renders the offer non-responsive. The award will be made using a Lowest Priced Technically Acceptable methodology, where technical acceptability and past performance serve as pass/fail gates. Acceptability depends on meeting all specifications, safety standards including EM 385-1-1, material handling and labeling requirements, and submission of a Site Specific Safety Plan approved by the Government. Contractors must provide an on-site superintendent with five years of relevant experience and a certified Site Safety and Health Officer, maintain workforce integrity, adhere to Buy American requirements, and comply with prevailing wage rates as specified. Performance and Payment Bonds are required, along with specific insurance coverage. Invoices must include detailed information including TIN, SAM UEI, contract number, and deliverables, and submission must follow a dual process: an original and copy to the Contracting Officer and COR, followed by electronic submission through the Treasury’s IPP portal. Inspection and acceptance follow a multi-stage process with formal notifications, required attendance by contractor representatives
USDA Ars Afm Apd

POSTED

1 day ago

DEADLINE

in 10 days
View Details