Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on July 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JJE Pool Painting Project

Closed
25-0218-PRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Florissant is seeking a qualified contractor to perform painting work at the James J. Eagan indoor pool, with the project scheduled for completion during the annual shutdown in August 2025. The scope includes pressure washing the pool walls, railings, and bleachers, followed by masking and applying a primer coat. The contractor will then apply two coats of water-based catalyzed epoxy to the walls and soffit beneath the bleachers, with accent colors to be used on areas currently featuring blue stripes. Additionally, the project involves painting the railings with two coats of water-based urethane enamel and coating the hollow metal door and frame in the bleacher area. The work also encompasses preparing and applying epoxy primer and urethane finish to the slide structure and bridge. Site preparation, including the measurement of lifts or scaffolding, is a critical component of the bidding process. Final color selections will be made after the contractor is chosen, with paint samples required for approval. The project is managed by the Parks and Recreation Department, with Jimmy Kirincich serving as the primary contact. The contract value is estimated between $50,000 and $150,000, and interested bidders must submit their responses by July 24, 2025. The project emphasizes adherence to safety and quality standards, with detailed instructions provided for the bidding process to ensure compliance and proper evaluation.

General Info

Documents

8
PDF, High priority: read this firstifb
High
PDF, High priority: read this first2 pages · certification
High
PDF, High priority: read this first9 pages · general-conditions
High
PDF, High priority: read this first7 pages · instructions-to-bidders
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this first5 pages · special-conditions
High
PDF, High priority: read this first1 page · wage-determination
High
PDF, Low priority1 page · affidavit
Low

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Parks and Recreation
Contacts1 person available
OfficeN/A

Full Description

Show more
General work description: The City of Florissant is seeking a contractor to paint the walls, bleachers, and railings at James J. Eagan indoor pool. The scope of work should include the following.Pool Facility: Pressure wash pool walls, railings, and bleachersMask off and apply one coat of primerApply two coats of water based catalyzed epoxy to walls and soffit under bleachers Accent color to be applied to areas that currently have blue accent color, including stripes on the walls Painting of railing with two coasts of water based urethane enamel Paint the hollow metal door and frame in the bleacher area Demask and clean up areaLifts or scaffolding should be measured and taken into consideration prior to bidding. Slide Structure and Bridge: A. Prep and apply one coat of epoxy primer and one coat of urethane finish Additional Requirements: Work must be completed during the month of August 2025 during our indoor pool annual shutdown.All colors will be finalized once the contractor is selected and paint samples should be made available for selection. Work Site Location: 1 James J. Eagan DriveFlorissant, MO 63033Site Visit Contact: Jimmy KirincichDirector of Parks and Recreation Sign up to see this detail

More opportunities from Missouri → Parks and Recreation

Same awarding agency

NAICS: 238320
New
SLED
Eagan Civic Center Gymnasium Painting
Solicitation # 25-0272-PR
The City of Florissant is seeking a qualified painting contractor for solicitation 25-0272-PR to repaint the gymnasium at the James J. Eagan Civic Center. The scope of work includes painting the ceiling black and applying a base color to the walls with three specific accent color stripes. Additionally, the contractor must paint four single and six double door frames in black. An optional alternate is available for painting a 12-foot by 12-foot Parks and Recreation logo on one wall. The project requires the use of commercial-grade, durable, and washable paints, with all materials and colors subject to City approval. The contractor is responsible for all labor, equipment, and site protection, including the use of 3/4 inch plywood to protect gymnasium flooring when operating lifts. The project is scheduled to begin on January 18, 2027, with final cleanup and inspection by February 5, 2027, and final completion by February 8, 2027. Bidders will be evaluated based on pricing, technical capability, schedule, scope accuracy, and warranty. Award requirements include compliance with Missouri state and federal prevailing wage rates, submission of certified payrolls, and enrollment in a federal work authorization program such as E-Verify for contracts exceeding 5,000 dollars. Contractors must also provide a performance bond from a Missouri-authorized surety and certify compliance with the Anti-Discrimination Against Israel Act. Payment terms are net 30 days following written approval by the Director.
Painting and Wall Covering Contractors

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 238330
SLED
Eagan Gymnasium Flooring Resurface
Solicitation # 25-0273-PR
The City of Florissant, Missouri, is soliciting sealed bids from qualified flooring contractors to sand, refinish, and repaint the wood gymnasium floor at the James J. Eagan Civic Center. The scope of work includes mechanical sanding, minor repairs to water-damaged areas, and the application of a commercial-grade finishing system. A critical component of the project is the layout and painting of eight game-line configurations for basketball, volleyball, and pickleball across three courts, using specific colors for each sport. Additionally, the contractor must replace the gymnasium base and install new aluminum door thresholds. The project is scheduled to begin on February 8, 2027, with final cleanup and inspection completed by March 19, 2027, though this timeline may be adjusted due to phased ceiling work. The contract will be awarded to the lowest qualified bidder based on a firm lump-sum base bid. Bidders must provide a detailed project schedule, warranty information, and evidence of comparable experience. Key compliance requirements include the submission of a performance bond within two weeks of the executed contract, adherence to State of Missouri labor provisions and prevailing wage rates, and verification of E-Verify participation. Contractors must also provide certified payrolls with monthly billing and certify that they are not engaging in a boycott of the State of Israel. Final acceptance is contingent upon a successful walkthrough with the City, the removal of all debris, and the submission of all closeout documentation.
Flooring Contractors

POSTED

12 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS