Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 9, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

John Day Avian Array Phase II

Awarded
W9127N-17-R-0066Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Portland District, is seeking a small business contractor for the John Day Avian Array Phase II project at the John Day Lock and Dam in Rufus, Oregon. The scope of work involves improving the Avian Array system by installing or replacing approximately 120 Vectran synthetic ropes across the Columbia River, implementing a new wire rope sling design to reduce shackle twisting, and adding winches and sheaves to 19 spillway towers for line tensioning. The project also requires carbon steel structural welding and cold galvanizing of components. This is a Total Small Business Set-Aside project with an estimated construction value between 1 million and 5 million dollars, awarded as a firm fixed-price contract based on best value. The performance period is scheduled from November 24, 2017, to June 30, 2018, with a strict window for in-water work within the boat restricted zone from December 1, 2017, to February 28, 2018. All interested offerors must be registered in the System for Award Management database and adhere to the NAICS code 237990.

General Info

Contract Value

$1,149,406

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

John Day Lock and Dam located in Sherman County Oregon and Klickitat County, Washington, RUFUS, OR, 97050, USA

Set-Aside

NONE

Award Issued Date

Documents

7

A.07.23JohnDayAvianArraySolicitationPackage.pdf

PDF

A.07.24Amendment1JohnDayAvianArray.pdf

PDF

A.07.24Amendment2JohnDayAvianArray.pdf

PDF

AttachmentA.pdf

PDF

AttachmentB.pdf

PDF

FIO_Drawings_-_John_Day_Avian_Array_Improvements_Phase_II.pdf

PDF

JD_AVIAN_ARRAY_PHASE_2_ADVERTISE_PLANS_R2.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Sources Sought → Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts1 person available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA

Full Description

Show more
1. General: This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) has been tasked to solicit a contract for Phase II of the John Day Lock and Dam Avian Array Improvements project. NO SOLICITATION IS CURRENTLY AVAILABLE. The official Synopsis citing the solicitation number will be issued on Federal Business Opportunities, www.fbo.gov, at a later date. The purpose of this Sources Sought is to gain knowledge of interest, capabilities, and qualifications of various members of the industry, to include the Small Business Community: Small Business, Small Disadvantaged Business to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Veteran Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small business (SDVOSB), Woman Owned Small Business (WOSB), to include Economically Disadvantaged Women-Owned Small Business (EDWOSB) are highly encouraged to respond. Point of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Carol McIntyre at +1 (555) 000-0000 or contact@example.gov. 2. Contract Information: The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) has been tasked to solicit a contract for the John Day Lock and Dam Avian Array Improvements Phase II. The proposed project will be a competitive, firm-fixed price (FFP) contract. Responses to this Sources Sought announcement will be used by the Government to support and make, if appropriate, a small business set-aside acquisition strategy decision. 3. Minimum Technically Acceptable Contractor Expertise Criteria: The Contractor must demonstrate through references, project lists, or reports, they possess experience completing projects which required splicing and rigging high strength synthetic rope for a marine or industrial application. The contractor must also demonstrate experience through references, project lists, or reports, they possess experience installing mechanical hoist systems, such as winches. Interested offerors are advised that AWS D1.1 certification is required for this project and are requested to state whether or not they possess this certification when submitting responses to this sources sought notice. Note: The Government may consider the relevant past experience and past performance of key individuals and predecessor companies in evaluating the company's past experience and past performance factors. North American Industrial Classification Code (NAICS): 237990, Other Heavy and Civil Engineering Construction The size standard: $36,500,000 Federal Service Code: Z2KA - Repair or Alterations of Dams 4. Project Description: The U.S. Army Corps of Engineers, Portland District's John Day Lock and Dam, located in Sherman County Oregon and Klickitat County, Washington uses an array of lines across the Columbia River to reduce avian predation of fish. USACE, Portland District has a requirement to make improvements to the John Day Avian Array at the John Day Lock and Dam. The repairs consist of installing/replacing sixty (60) Vectran synthetic ropes spanning the Columbia River, incorporating a new wire rope sling design such that shackle twisting is minimized, adding a sheave and winch to nineteen (19) spillway towers so that operations personnel can tension lines. Structural welding of carbon steel and cold galvanizing of affected components is required. The work is required to be carried out between November 24, 2017, and June 30, 2018. The in-water work shall occur between December 1, 2017, and February 28, 2018. Work over water may occur after February 28th, 2018, but no contractor personnel or vessels will be allowed to enter the water. The estimated Magnitude of Construction for this project is between $1,000,000 and $5,000,000. 5. Submission Instructions: Responses to this Sources Sought notice must be submitted electronically (via email) SUBJECT: W9127N-17-R-0066 John Day Avian Array Improvements Phase II. Please send to Brandon M. Lasich, Contract Specialist, at contact@example.gov in either Microsoft Word or Adobe Portable Document Format by 2:00 pm Pacific Standard Time Wednesday, April 5, 2017. An acknowledgement will be sent to verify receipt. A Firm's response to this Sources Sought shall be limited to five (5) pages and shall include the following information: a. Firm's name, address, point of contact, phone number, e-mail address, CAGE and DUNS number, and the Construction Bonding Level per contract. b. Firm's small business category and Business Size: Small Business, Small Disadvantaged, 8(a) firm, Historically underutilized Business Zones (HUBZone), Woman Owned (WOSB), Economically Disadvantaged Women-Owned Small Business (EDWOSB), and Service-Disabled Veteran-Owned Small business (SDVOSB). c. Provide relevant information on the Firm's experience/Capabilities as it pertains to the proposed work outlined in the Project Description and the elements found in Paragraph 3. d. Provide a minimum of one project similar in size, scope and complexity with a brief description of the project, customer name, timeliness of performance, contract number, customer satisfaction and the dollar value. The Government may verify information in CPARS or PPIRS. e. Recent and relevant rigging experience within the last five (5) years using high strength synthetic rope for a marine or industrial application. 6. Disclaimer and Important Notes: This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. After a review of the responses a solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov and remain current for the duration of the contract to be eligible for award of a Government contract.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 16 hours ago

DEADLINE

N/A
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Solicitation # W9127N27BA007
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project, identified by solicitation number W9127N27BA007, has an estimated construction value between 25 million and 100 million dollars. The scope of work involves replacing primary chillers, installing four new chiller skid packages with 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system integrated with fire protection systems. The project requires extensive structural modifications, the installation of air-cooled and water-cooled systems, and the use of refrigerants that are not subject to future phase-out schedules. Construction is expected to take 1,004 calendar days following the Notice to Proceed and will occur within an active powerhouse containing high-voltage electrical equipment. Due to the nature of the work, contractors must adhere to strict safety protocols and may be required to perform asbestos abatement and lead mitigation. A critical requirement for award is CMMC Level 2 (Self) certification for the prime contractor and relevant subcontractors processing Controlled Unclassified Information. This is an unrestricted, full and open competition under NAICS code 238220, with a tentative solicitation issuance date of October 29, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 16 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Solicitation # W9127N27BA009
The U.S. Army Corps of Engineers Portland District is soliciting firm-fixed-price bids for the repair and rehabilitation of Tainter Valves TV3 and TV4 at the John Day Lock and Dam in Klickitat County, Washington. The project scope includes crack and weld repair, seal replacement, and the procurement of spare bushings, with an estimated construction magnitude between $1,000,000 and $5,000,000. The work is categorized under NAICS 237990 and is a full and open competition. Mandatory requirements include adherence to EM 385-1-1 safety standards, CMMC Level 1 certification, and the provision of performance and payment bonds. Bidders must also comply with the Davis-Bacon Act and Buy American requirements. The solicitation includes mandatory price items for mobilization and the removal, transport, and repair of TV3, with optional line items for the same services for TV4. Evaluation will include a 10 percent price preference for HUBZone small business concerns and a review of subcontracting plans to ensure goals for small businesses and HUBZone firms are met. Bids must be submitted in PDF format to the designated contracting personnel by 11:00 A.M. PDT on November 19, 2026. Site visits were scheduled for November 3, 2026, requiring attendees to be U.S. citizens with a REAL ID. Performance is expected to begin within 10 calendar days of award, with specific completion timelines of 143 to 233 calendar days depending on the line item.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS