This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
John Glenn HS Freezer Build & Cooler Reline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract is for the installation of a prefabricated modular walk-in freezer in an existing storage room at John Glenn High School in Norwalk, California, along with the demolition and reline of an existing walk-in cooler into a new walk-in cooler. The scope includes the installation of new refrigeration systems, electrical work, interior lighting, roof modifications, shelving, and new door assemblies for both units. All work must comply with applicable federal, state, and local regulations, including Title 24 of the California Code of Regulations and standards enforced by the Division of the State Architect (DSA). The contractor is required to submit shop drawings, product data, finish samples, and as-built documentation for approval prior to installation, and all work must be free of defects and fully operational upon final acceptance. The project demands strict adherence to DSA 152 inspection protocols and final sign-off for acceptance. The solicitation is issued by the Norwalk-La Mirada Unified School District under bid number 202627-2, with responses due by August 19, 2026, and submissions required in sealed physical envelopes delivered to the district office. The contract follows a Lowest Price Technically Acceptable (LPTA) award methodology, meaning the bid with the lowest price that meets all technical and responsibility requirements will be selected. Bidders must demonstrate financial capability, relevant experience, organizational capacity, and a track record of on-time project completion. The contractor must hold a California Class B general building license, comply with prevailing wage laws, carry required insurance including workers’ compensation and builder’s risk, and submit a certified safety program. DVBE participation must be reported, with a final close-out statement required upon completion, and background checks for personnel are mandated. The contract does not contain federal FAR clauses, and no specific pricing table, contract value, or FOB terms are provided. Work must be completed under the District’s Notice to Proceed, with a baseline schedule submitted within ten days, and final acceptance occurs on-site following successful inspection and DSA approval.
General Info
Place of Performance
Norwalk, CA, 90650, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
