John Marshall High School Synthetic Field Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The John Marshall High School Synthetic Field Replacement Project entails the removal and replacement of approximately 80,000 square feet of aging synthetic turf on the school’s football field, along with the installation of new perimeter drainage, a field cooling system, repairs to the adjacent track, accessibility upgrades to the bleachers, and the addition of five new field lights. The project also includes asphalt removal in existing parking areas and is designed to meet all applicable local, state, and federal regulatory requirements, including the Americans with Disabilities Act, the Division of State Architect, and the Department of Toxic Substances Control. All work must comply with the Los Angeles Unified School District’s Standard Conditions of Approval, adopted on December 12, 2023, and adhere to the California Environmental Quality Act guidelines, particularly those pertaining to existing facilities and replacement projects. The total authorized budget for the project is $5,887,414, approved by the Board of Education on November 14, 2023, and no option periods or variable cost provisions are included. The project site is located at 3939 Tracy Street in Los Angeles, California, with all inspections and final acceptance conducted on-site by LAUSD. The campus will benefit a broad community including over 485 student-athletes from 13 sports in the 2023–2024 academic year, as well as faculty, families, and the public who utilize the facility under the Civic Center Act. Environmental protections are integral to the project, with requirements such as nesting bird surveys prior to any tree removal, demolition waste recycling, and compliance with air quality regulations from the South Coast Air Quality Management District. The CEQA Project Manager, Bryan Ramos Fernandez, serves as the primary point of contact for the project. While comprehensive procurement details such as evaluation factors, contract clauses, line-item pricing, or contractor certifications are not provided, the project operates under LAUSD’s internal construction and environmental compliance framework rather than standard federal acquisition regulations, with all deliverables tied to district specifications and the attached campus site plan.
General Info
Agency
NAICS
Place of Performance
Los Angeles, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code