This Solicitation opportunity from District of Columbia was posted on December 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the award of a design-build agreement for the John Thompson Jr. High School addition project, formerly known as MacArthur High School. The selected Offeror will be responsible for providing full design and construction services to add approximately 18,100 square feet to the existing Thompson High School facility. This expansion aims to align the school’s footprint with the District of Columbia Public Schools' educational specifications as outlined in the contract attachments. Thompson High School, acquired by the District in 2021, recently opened in August 2023 following initial capital improvements completed under a separate contract, which included the installation of key infrastructure like a new kitchen, cafeteria, fire alarm, and sprinkler system to support partial occupancy.
The solicitation was posted on December 18, 2025, with a response deadline set for January 29, 2026. The project is managed by the District of Columbia’s Contracts and Procurement office, with primary and secondary points of contact provided for inquiries. The focus of this project is to enhance the existing school structure to better meet current educational facility standards and accommodate future student needs through a well-integrated design-build approach, ensuring both efficient design and construction within the District of Columbia.
General Info
Design-build contract awarded for 18,100 sq ft addition to Thompson High School, DC.
PDF, High priority: read this first320 pages · sow
HighAI Summary for ADA Compliance QA-QC Manual v2 for DGS-DCPS Modernization Projects: This document is the ADA Compliance Quality Assurance-Quality Control (QA-QC) Manual version 2, prepared for the Department of General Services (DGS) for DC Public Schools (DCPS) Modernization & Stabilization Projects. It outlines the QA-QC program and procedures to ensure ADA code compliance during design and construction phases of school building projects. The manual covers primary focus areas including accessible entryways, interior furniture, elevators, bathrooms, sidewalks, parking lots, and ADA code integration in construction documents. It includes detailed methodology, construction phase checks, and scope specific checklists in appendices to guide contractors and design teams in achieving high-quality ADA compliant construction from parking lots to interior spaces. The manual emphasizes coordination, oversight, and field implementation to meet ADA standards effectively.
PDF
PDF, High priority: read this first24 pages · contract-document
HighAI Summary for Attachment H1 - Standard Contract Provisions for Construction Contracts: This document contains the District of Columbia Department of General Services Standard Contract Provisions for construction contracts. It defines key terms such as Government, Executive, Contracting Officer, and Contract Documents. It outlines the priority and binding nature of contract specifications and drawings, procedures for handling discrepancies, and the hierarchy of contract documents. The document also details the process for changes to the contract, including designated change orders, other change orders, notification requirements, and equitable adjustments. It specifies the breakdown for change order costs including labor, bond, and materials. The provisions ensure proper administration and execution of construction contracts under DGS authority.
PDF
PDF, High priority: read this first2 pages · past-performance
HighAI Summary for Attachment L - Past Performance Evaluation Form: This document is Attachment L, a Past Performance Evaluation Form used to assess an offeror's performance on a project. It includes rating categories such as Quality of Services/Work, Timeliness of Performance, Cost Control, Business Relations, and Customer Satisfaction. The form requires evaluator details, contract information, and remarks on performance. The second page provides detailed rating guidelines with scores from 0 (Unacceptable) to 5 (Excellent) to guide evaluators in assigning ratings based on compliance, cost control, timeliness, and business relations. The form is designed to support evaluation of contractor past performance for procurement decisions.
PDF
PDF, High priority: read this firstbid-bond-form
HighAI Summary for Bid Bond Form for Proposal Guarantee: This document is a Proposal Bond form used as a bid guaranty for construction, alteration, and repair work. It includes sections for the Principal's legal name and address, type of organization, state of incorporation, penal sum of bond, and surety information. The bond obligates the Principal and Surety to the District of Columbia Government to ensure the bid is not withdrawn and that performance and payment bonds are furnished if the bid is accepted. The form requires signatures, corporate seals, and certification by corporate officers. Instructions specify usage, authority for signing, surety qualifications, and execution requirements. The form is essential for guaranteeing bid compliance and contract performance assurance.
PDF
PDF, High priority: read this first6 pages · certification-form
HighAI Summary for Bidder/Offeror's Certification Form: This document is a Bidder/Offeror's Certification Form associated with a solicitation. It contains five sections covering bidder responsibility, additional certifications, compliance with the Buy American Act and Walsh-Healey Act, and requires the bidder's signature. The form requires detailed information about the bidder's business entity, individual responsibility of principals, business responsibility, and certificates/licenses status. It includes questions about legal, financial, and organizational status, past sanctions, suspensions, investigations, contract terminations, and other compliance matters. The form is designed to assess the responsibility and eligibility of the bidder/offeror for government contracting purposes.
PDF
PDF, High priority: read this first6 pages · sow
HighAI Summary for Concept, Schematic, and Design Development Milestone Requirements: This document outlines the milestone requirements for Concept Design, Schematic Design, and Design Development phases as referenced in Section 2 of the contract. It details deliverables for each phase including conceptual floor plans, education specifications updates, zoning analysis, cost estimates, value engineering, net zero energy reports, quality control plans, permitting and approvals process, and design narratives. The schematic design phase includes further plan development, presentation materials, agency meetings, community engagement, and detailed submittal checklists. The design development phase requires detailed plans, specifications, code compliance analysis, and equipment layouts. The document serves as a comprehensive guide for design-builder submissions to the Department.
PDF
PDF, High priority: read this first10 pages · wage-determination
HighAI Summary for Davis-Bacon Wage Rates for District of Columbia Building Construction 2024-2025: This document is the Davis-Bacon wage determination for building construction projects in the District of Columbia, effective from 2024 to 2025. It supersedes General Decision Number DC20240002 and includes wage rates and fringe benefits for various construction trades such as asbestos workers, bricklayers, carpenters, electricians, elevator mechanics, ironworkers, and laborers. The document references compliance with Executive Orders 14026 and 13658 regarding minimum wage rates for covered federal contracts. It also details paid holidays and vacation contributions. The wage rates are updated with multiple modification dates through 2025, ensuring contractors pay prevailing wages as required by law.
PDF
PDF, High priority: read this first17 pages · contract-document
HighAI Summary for DCAM-22-CS-RFQ-0016 First Source Employment Agreement for Construction Projects: This document is the First Source Employment Agreement for construction projects under contract DCAM-22-CS-RFQ-0016 with the District of Columbia Department of General Services. It outlines the employer's obligations under the Workforce Intermediary Establishment and Reform of the First Source Amendment Act of 2011 and Apprenticeship Requirements Amendment Act of 2004. The agreement mandates hiring percentages for District residents based on government assistance thresholds and defines key terms such as apprentice, beneficiary, employer, and government-assisted project. It establishes the Department of Employment Services as the first source for recruitment and requires good faith efforts to meet hiring goals. The document includes employer and project information fields and specifies compliance requirements retroactive to the project start date.
PDF
PDF, High priority: read this first432 pages · specifications
HighAI Summary for DCPS Educational Specifications 2021 with Appendices A, B, & C: This document titled 'DCPS Educational Specifications 2021 with Appendices A, B, & C' provides detailed educational space programming and adjacency diagrams for a high school prototype program. It includes specifications for various academic core areas, library, visual arts, performing arts, physical education, JROTC, career technical education, administrative spaces, and health services. The document outlines room types, space programs, and adjacency requirements for classrooms, labs, offices, and specialized educational and support areas. It serves as a technical guide for educational facility planning and design, dated 2021, and includes appendices for additional reference.
PDF
PDF, High priority: read this first128 pages · contract-document
HighAI Summary for Design-Build Agreement for John Thompson Jr. High School Addition DCAM-26-CS-RFP-0003: This document is the Design-Build Agreement for the John Thompson Jr. High School Addition project (formerly MacArthur High School) under contract number DCAM-26-CS-RFP-0003. It outlines the agreement between the Department of General Services and the Design-Builder for design, preconstruction, construction, and construction administration services. The agreement includes project details such as the project address, budget of $17,500,000, guaranteed maximum price (GMP) basis submission date of October 1, 2026, substantial completion date of July 15, 2028, and final completion date of January 17, 2029. It specifies fees, allowances, liquidated damages, disincentive fees, and key personnel replacement costs. The document also defines terms and conditions governing the contract and the roles of involved parties.
PDF
PDF, High priority: read this firstsow
HighAI Summary for DGS Project Turnover Manual 2024: This document is the Projects Turnover Protocol prepared by the Capital Construction Division of the District of Columbia's Department of General Services (DGS) for 2024. It outlines the internal process for transferring construction projects from the Capital Construction Services Division to the Facilities & Maintenance Division. The manual details step-by-step procedures during design and construction phases, including roles of key personnel, review schedules, meetings, and documentation required for successful turnover. It aims to ensure timely transfer of maintenance responsibilities and documents to the Facilities Division immediately upon project turnover. The document includes contact information for turnover managers and references various forms and appendices to support the process.
PDF
PDF, High priority: read this first242 pages · specifications
HighAI Summary for DGS Supplemental Design Guidelines 2023.12.21: This document titled 'Supplemental Design Guidelines' from the District of Columbia Department of General Services Capital Construction Services, version dated 2023.12.21, provides supplementary technical specifications and design requirements for designers, contractors, and consultants. It covers mechanical systems, electronic lockdown hardware, doors and hardware, security systems, interior plantings, projectors, artificial turf fields, athletic equipment, special warranties, emergency evacuation maps, furniture and equipment, attic stock, fire alarm systems, phone lines, and standby generators. The guidelines take precedence over other technical specifications and owner's project requirements in case of conflict and include detailed instructions on installation, hardware functions, security protocols, warranty durations, and emergency preparedness.
PDF
PDF, High priority: read this first85 pages · geotechnical-report
HighAI Summary for Geotechnical Engineering Report for MacArthur High School Addition: This Geotechnical Engineering Report dated February 9, 2024, prepared by Schnabel Engineering DC, Inc., presents the subsurface exploration and geotechnical analysis for the MacArthur High School Addition project located at 4530 MacArthur Boulevard NW, Washington, DC. The report includes scope of services, site description, subsurface exploration program, laboratory testing, site geology, foundation recommendations, floor slab recommendations, site grading, lateral earth pressures, subdrainage recommendations, construction considerations, and general specification recommendations. It provides detailed findings on soil conditions, groundwater, seismic site classification, infiltration rates, and earthwork criteria to support foundation and construction design. Appendices contain subsurface data, test results, and laboratory data.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Living Wage Act Fact Sheet - District of Columbia 2025: This document is a fact sheet for the Living Wage Act of 2006 in the District of Columbia, effective January 1, 2025 through June 30, 2025, with updated wage rates effective July 1, 2025. It outlines the required living wage rates of $17.50 and $17.95 per hour respectively for contractors and recipients of government assistance meeting certain thresholds. The fact sheet defines key terms such as 'affiliated employee' and details exemptions to the Act, including federal wage determinations, collective bargaining agreements, and specific contract types. It also describes enforcement responsibilities and reporting procedures for non-compliance. This document serves as an informational guide for contractors and subcontractors subject to the Living Wage Act requirements.
PDF
PDF, High priority: read this first6 pages · letter-contract
HighAI Summary for Notice to Proceed and Letter Contract for John Thompson Jr. High School Addition Design-Build Services: This document is a Letter Contract serving as a Notice to Proceed for the Design-Build Services for John Thompson Jr. High School Addition, issued under RFP No. DCAM-26-CS-RFP-0003. It outlines the scope of work, deliverables, not-to-exceed amount, construction phase compensation, insurance requirements, contract duration, billing instructions, and key personnel obligations. The Letter Contract governs the relationship until a final contract is executed and includes provisions for disincentive fees for late deliverables and replacement fees for key personnel changes. It is effective upon signing by the Contractor and the Department of General Services and merges into the Definitized Contract once executed.
PDF
PDF, High priority: read this first4 pages · bond
HighAI Summary for Performance and Payment Bonds for Construction: This document contains the Performance Bond and Payment Bond forms for construction contracts with the District of Columbia Government. It includes instructions for execution, requirements for principals and sureties, and conditions of the bonds. The bonds guarantee the principal's faithful performance of the contract and payment obligations, including indemnification of the District against claims and damages. The document specifies the need for signatures, corporate seals, and power-of-attorney for sureties, and outlines the penal sums and contract details. It is a critical legal and financial instrument ensuring contract compliance and protection for the District.
PDF
PDF, High priority: read this firstoffer-letter
HighAI Summary for RFP DCAM-26-CS-RFP-0003 Design-Build Services Offer Letter: This document is an offer letter submitted in response to the District of Columbia Department of General Services RFP DCAM-26-CS-RFP-0003 for Design-Build Services for the John Thompson Jr. High School Addition(s). It outlines the Offeror's proposal including Design Fee, Design-Build Fee, Permit Allowance, Exploratory/Existing Building and Site Investigation Allowance, Lump Sum General Conditions Cost, and Bonds and Insurance. The letter confirms the Offeror's agreement to hold the proposal open for 120 days and to enter into a contract within 10 days of award notification. It also includes representations regarding authority to bind the Offeror, anti-collusion, and certification related to participation of LSDBE Certified Companies. The document is intended to formalize the Offeror's proposal under the terms of the RFP and associated Proposal Documents.
PDF
PDF, High priority: read this first85 pages · rfp
HighAI Summary for RFP DCAM-26-CS-RFP-0003 John Thompson Jr High School Additions: This Request for Proposals (RFP) DCAM-26-CS-RFP-0003, issued December 18, 2025, solicits design-build services for additions to John Thompson Jr. High School (formerly MacArthur High School) in Washington, DC. The project involves designing and constructing approximately 18,100 square feet of additions including cafeteria expansion, fitness room, and auditorium with support spaces. The school is currently occupied and undergoing phased renovations. The Design-Builder will coordinate with school leadership, DCPS, and the community, using a secure electronic project management system. Key dates include a pre-proposal conference on December 29, 2025, questions due by January 5, 2026, and proposals due by January 29, 2026. The RFP includes detailed project requirements, evaluation criteria, and contract provisions.
PDF
PDF, High priority: read this first8 pages · sbe-subcontracting-plan
HighAI Summary for SBE Subcontracting Plan FAQs and Instructions: This document provides FAQs and a checklist to assist in completing the Small Business Enterprise (SBE) Subcontracting Plan required for government-assisted construction and non-construction contracts exceeding $250,000. It outlines who must submit the plan, subcontracting percentage requirements (typically 35%), conditions for Certified Business Enterprises (CBE), crediting rules for subcontracting work, and submission instructions. The plan must list all SBE and CBE subcontracts at every tier and include fully executed subcontract copies for credit. It also covers waiver procedures, certification requirements, and compliance with District laws. The document is intended to ensure adherence to subcontracting goals and proper documentation for agency contracts and private projects with District subsidies.
PDF
PDF, High priority: read this first29 pages · contract-document
HighAI Summary for Standard Contract Provisions for A&E Services - District of Columbia DGS Oct 2018: This document contains the Standard Contract Provisions for Architectural and Engineering Services Contracts issued by the District of Columbia Department of General Services, released in October 2018. It defines key terms such as Architect-Engineer, Contract, Contracting Officer, and Scope of Services. The provisions outline general responsibilities, authority of the Contracting Officer, performance period, and standards of care. It also details reporting requirements including monthly and biweekly progress reports with schedule updates in Primavera format, narrative explanations of delays, and conditions precedent to payment. The document serves as a foundational contract framework governing the professional services relationship between the District and the Architect-Engineer for projects.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Thompson HS Addition Educational Specifications: This document provides educational specifications for the Thompson High School Addition project under the District of Columbia Public Schools. It details projected enrollment, school type, building capacity, and total square footage (18,089 sq ft). The document includes space descriptions and sizes for performing arts, physical education, and student dining areas, with specific room types and quantities listed. The specifications serve as a technical guide for the design and construction of the school addition, dated as the current version provided.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Title 29 CFR Labor Standards Provisions Wage Determinations: This document is an excerpt from Title 29 of the Code of Federal Regulations (CFR), focusing on labor standards provisions related to wage determinations under the Davis-Bacon and Related Acts. It outlines classifications of laborers and mechanics, including 'helper' classifications, and defines wages to include basic hourly rates and bona fide fringe benefits. The document specifies contract clauses for construction projects financed wholly or partly by federal funds, requiring payment of wages and fringe benefits at rates not less than those in the Secretary of Labor's wage determination. It also details procedures for adding new labor classifications and wage rates, and mandates posting of wage determinations and Davis-Bacon posters at work sites. The version includes amendments up to 2000 and is critical for ensuring compliance with federal labor standards in construction contracts.
PDF
PDF, High priority: read this first10 pages · sow
HighAI Summary for Waste and Recycling Design Guidelines for DCPS Modernizations: This document provides detailed waste and recycling design guidelines specifically for DC Public Schools (DCPS) modernizations, issued by the D.C. Department of General Services, Sustainability + Energy Division. It includes recommendations for disposal container types and sizes based on student enrollment, design considerations for dumpster pads, driveways, and loading docks, and specifications for front-end load dumpsters and compactors. The guidelines address practical issues such as truck maneuverability, weight load capacity, overhead clearances, and prevention of illegal dumping and parking problems. It also covers dumpster enclosure design, compactor usage, and flow of waste materials within school buildings. The document aims to ensure efficient, safe, and sustainable waste management practices in DCPS facilities.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Attachment P - Conflict of Interest Disclosure Statement: A mandatory disclosure form requiring offerors to identify any organizational conflicts of interest in accordance with 27 DCMR §§ 4705 and 4707. It requires the disclosure of contractual relationships, employment ties, or financial interests that could influence the procurement process.
PDF
PDF, Low priority5 pages · eeo-policy-statement
LowAI Summary for Attachment R - Equal Employment Opportunity (EEO) Policy Statement: This document is the Equal Employment Opportunity (EEO) Policy Statement required for compliance with Mayor's Order 85-85 and the D.C. Human Rights Act. It includes the contractor's written commitment to non-discrimination and affirmative action in employment practices, covering various protected categories. The document outlines obligations for posting notices, compliance with labor unions, and permitting access for investigations. It also includes an Employer Information Report section for submitting EEO data to the Office of Contracting and Procurement. The policy ensures adherence to equal opportunity requirements in contracts with the District of Columbia government.
PDF
PDF, Low priority3 pages · self-certification
LowAI Summary for Attachment Y - Campaign Finance Reform Self-Certification Form: This document is a Contractor Self-Certification form related to the D.C. Campaign Finance Reform Amendment Act of 2018. It requires businesses to disclose political contributions made by the business or its principals since November 9, 2022, to specified officials including the Mayor, Attorney General, and Councilmembers. The form asks for details of contributions, contract holdings at the time of contributions, and any violations of D.C. Official Code § 1-1163.34a. It also requires certification that the business is not and will not be in violation of the Act. The form includes sections for business and principal information, modifiers, and a notary acknowledgment.
PDF
PDF, Low prioritycertification
LowAI Summary for Bid Guarantee Certification for Alternate Bid Security: This document is a certification letter for offerors submitting a cashier's check or irrevocable letter of credit as an alternate bid security instead of a bid bond. It requires notarization and acknowledges that if awarded the contract, the offeror must promptly post a payment and performance bond equal to the contract value. Failure to do so results in the Department drawing on the alternate bid security as liquidated damages, contract termination, a two-year restriction on using alternate bid security, and waiver of protest rights. The document includes a notary section for official acknowledgment.
PDF
PDF, Low prioritycertification
LowAI Summary for Certification to Furnish Performance & Payment Bond: This document is a Certification to Furnish Performance & Payment Bond issued by the Government of the District of Columbia Department of General Services. It certifies that the contractor will provide the required Performance & Payment Bond in the amount of the submitted bid or a specified maximum amount if awarded the contract. The bond guarantee remains valid and irrevocable for 120 days from bid submission. The document requires authorized signatures and notarization to be legally binding.
PDF
PDF, Low priority46 pages · guide
LowAI Summary for National Building Information Modeling (BIM) Guide for Owners: This document is the National Building Information Modeling (BIM) Guide for Owners, published by the National Institute of Building Sciences in January 2017. It provides building owners with guidance on developing and implementing BIM requirements in contracts and internal policies to plan, design, construct, and operate buildings. The guide covers BIM uses, project delivery methods, intellectual property, team roles, BIM execution planning, standards, file structures, model requirements, and project execution plans. It aims to help owners maximize building value throughout the lifecycle by facilitating better decision-making, coordination, and asset management. The guide includes acknowledgements from various agencies and experts and emphasizes the increasing adoption and business value of BIM in the construction industry.
PDF
PDF, Low priority4 pages · release-of-lien-forms
LowAI Summary for Release of Lien and Final Release of Liens and Claims Forms - DC Department of General Services: This document contains Release of Lien and Final Release of Liens and Claims forms used by the District of Columbia Department of General Services. The forms are intended for contractors or consultants to indemnify, waive, and release the District of Columbia from claims, liens, and stop work notices related to a specific project. The forms require details such as project name, contract number, task order number, work performed, contract date, contract amount, and payment amounts. Both forms must be signed and notarized by authorized individuals. The document serves as a legal release to facilitate payments and final disbursements under contract terms.
PDF
PDF, Low prioritytax-affidavit
LowAI Summary for Tax Certification Affidavit for DC Contract Compliance: This document is a Tax Certification Affidavit from the Government of the District of Columbia, Office of the Chief Financial Officer, Office of Tax and Revenue. It is to be completed by entities registered to conduct business in DC, authorizing the release of tax compliance information to a DC agency for contract eligibility verification. The affidavit certifies compliance with DC tax filing and payment requirements and includes a penalty warning for false statements. The authorization is valid for one year from the date signed.
The Department anticipates awarding a design-build contract (the "Agreement" or "Contract" or "Design-Build Agreement" ) to the Offeror whose Proposal is most advantageous to the District pursuant to the evaluation and award criteria in Part 3 of this RFP. The Project includes full design and construction services for Thompson HS, which will be approximately 18,100 square-feet addition(s). The Design-Builder shall design and construct a combination of additions to increase the existing footprint to accommodate the square footage required in the educational specifications ("Ed Specs(s)" or "Educational Specifications") to bring it in line with the District of Columbia Public Schools ("DCPS") Ed Specs as set forth in Attachment A3 . The Thompson HS was purchased by the District in 2021 from the Georgetown Day School. Thompson HS opened its doors to students and staff for the first time in August 2023. Before opening, there was a small capital improvement project performed in 2022 and 2023 under a separate contract to allow for partial occupancy including but not limited to a new kitchen and cafeteria space, fire alarm, and sprinkler system.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.