Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Joint Air-Transportable Containerized Kitchen (JACK) System

Closed
FA488722Q0051Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

332312 - Fabricated Structural Metal Manufacturing

Place of Performance

Luke AFB, AZ, 85309, USA

Set-Aside

SBA

Documents

2

JACK+System+-+Salient+Characteristics.pdf

PDF

Solicitation+-+FA488722Q0051.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA

Full Description

Show more
56 CONS at Luke AFB, Arizona is seeking to acquire a Joint Air-Transportable Containerized Kitchen (JACK) System as specified in the attached Solicitation and Salient Characteristics. Quotes in response to the Request for Quote (RFQ) MUST be emailed to the point of contact listed below. Contractors that respond to this RFQ acknowledge and agree to all instructions and procedures described herein. Quotes are due no later than 12 August 2022 by 4:00 PM PDT. **Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.** Point of Contact: SSgt Zachary Farel; contact@example.gov

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
Solicitation F3YCFA6173AC01 is a firm-fixed-price requirement for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting various critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and several meteorological and navigation stations. The scope includes the installation of 13 fiber optic distribution panels, the replacement of TC Communications equipment, and the provision of UPS and training. Work will utilize a combination of existing manhole/handhole duct systems and direct burial, with the latter requiring a minimum depth of 36 inches or the manufacturer's specification. This requirement is set aside 100% for SBA Certified Women-Owned Small Businesses under NAICS code 335921. The contract performance period is not to exceed 180 calendar days, with a target completion date of July 1, 2027, and a requirement to finish all facets within 120 days of award. Award will be based on the lowest priced, technically acceptable quote, evaluated through technical subfactors including installation design and a quality control plan, as well as past performance via the Supplier Performance Risk System. Contractors must be certified telecommunications professionals and adhere to strict environmental and security guidelines, including the submission of an OPSEC plan and compliance with Luke AFB environmental standards. A mandatory site visit is scheduled for November 4, 2026, and final offers are due by November 9, 2026.
Fiber Optic Cable Manufacturing

POSTED

about 13 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS