Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Joint Outfall C Unit 1 Force Main Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Joint Outfall C Unit 1 Force Main Rehabilitation project, managed by the Los Angeles County Sanitation District, involves the extensive repair and modernization of critical wastewater infrastructure in California. The primary scope of work includes the rehabilitation of approximately 9,600 feet of existing 54-inch diameter reinforced concrete pipe using a fiberglass-reinforced cured-in-place pipe liner. To support this rehabilitation, the project requires the installation of twelve new pressure manholes, the abandonment of eleven existing pressure manholes, and the construction of new diversion structures. Additionally, a new segment of 60-inch diameter force main will be constructed to achieve hydraulic separation between the 54-inch and 60-inch diameter force mains. The project's physical footprint begins at the Port of Los Angeles at Structure Manhole C 0039 and extends easterly through Southern California Edison property, along West Hill Street to Fashion Avenue, southerly through the Caltrans right-of-way to West 16th Street, and finally easterly to the Long Beach Main Pumping Plant at Structure Manhole C 0051 near the 710 Freeway. This project has been granted a Notice of Exemption under CEQA guidelines, as it constitutes the repair and rehabilitation of an existing public facility without expanding its use, and is deemed necessary to prevent or mitigate an emergency. Administrative oversight is provided by Patricia Horsley, Environmental Planner, and Ziad El Jack, Supervising Engineer.

General Info

LACSD project rehabilitating 9,600 feet of wastewater force main in Los Angeles, California.

Agency

California → Los Angeles County Sanitation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

DMS-#7607274-v2 Joint Outfall C Unit 1 Force Main Rehabilitation Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A
Contacts
Patricia L HorsleyEnvironmental Planner

Full Description

Show more
The project will rehabilitate approximately 9,600 feet of existing 54-inch diameter reinforced concrete pipe (RCP) of the Joint Outfall C Unit 1 Force Main with fiberglass reinforced cured-in-place pipe (FR CIPP) liner, install twelve (12) new pressure manholes and abandon eleven (11) existing pressure manholes, and all appurtenant work. Rehabilitation requires construction of new diversion structures and a new segment of 60-inch diameter force main to hydraulically separate the 54-inch diameter force main from the 60-inch diameter force main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 1 hour ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS