Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on February 5, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Justification for Other than Full and Open Competition for Construction Services for the Traumatic Brain Injury Project, for the Rehabilitation Medicine Department

Closed
HHS-NIH-ORF-AECCB-HQB90191Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 9 days

General Info

Agency

N/A

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

National Institutes of Health OA-ORF, Building 13, 2E48 9000 Rockville Pike, BETHESDA, MD, 20892, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Monali ParikhContracting Officer
Tiffany D. DavisContracting Officer

Full Description

Show more
The National Institutes of Health intends to award a sole source contract to Tishman Construction Corp. to provide Construction Services for the Traumatic Brain Injury Project, for the Rehabilitation Medicine Department. This project will allow Rehabilitation Medicine Department to modernization spaces and equipment to facilitate ongoing and new research and treatment endeavors. Several spaces require reconfiguration to accommodate a change in staffing and support work. Tishman was issued a construction contract to provide services for the defined construction, which is currently on-going. Tishman received the NTP on Sept. 15, 2009 and is scheduled to complete the work on April 10, 2010. Construction is continuing construction, at this time, but there have been some additional IC initiated changes as well as unforeseen or hidden conditions, which require additional work and perhaps time extension. During the construction, Tishman's contract expired, so no additional construction funds could be available without an extension to their contract. The contract vehicle is a not to exceed Price contract. The total contract award value including, the option year shall not exceed $136,000.00. NIH anticipates soliciting and negotiating with only one source under the statutory authority of 41 U.S.C. 253(d)(1)(B) to provide this service to meet mission critical requirements for the following reasons: This project was fully planned and designed by CMB and DTR. Change is required due to new IC requirements, discovered hidden conditions, and drawing revisions which occurred after construction began. Tishman has performed the construction to date and they are familiar with NIH issues pertaining to the field conditions and IC constraints and documentation developed to date. Tishman has the design intent knowledge that was developed during the preparation of the construction documents and master plan and has spent hundreds of man hours getting familiar with the drawings, the building, and the client. To repeat this process with a new contractor would require an extensive effort that would be extremely disruptive to the IC, unnecessarily time consuming, and cost-prohibitive. To compete for these construction services would require a significant amount of time that would delay the project and adversely impact the IC and the Clinical Center. Scope of Required Construction Services: - 1. Data Collection Room: - a. Change the configuration of the desk/knee wall and the credenza to provide more space between the wall and the treadmill and more room and sight lines for the camera equipment. - b. Modification to newly constructed desk/knee wall, to provide better observation of the study subjects. - c. Modify the location of the new steel beams to meet revisions in the track/harness system, repair drywall where the beams are moved, and touch up paint on the drywall and the beams. - d. Add new 2" conduit for additional IC requirements for the TV/monitor. - e. Replace the data access flooring with a High Tech data flooring to meet very stringent requirements for the IC. Upgrade the VCT surface on the High Tech flooring with colors in a pattern requested by the IC, including painting of the top surface of existing Force Plate measuring equipment. - f. Remove strip ceiling lighting along the east side of the room, which are in the way of the new steel beams. - g. The IC requested the steel beams to be painted different colors for additional room effect for their patients. - h. Additional work on sprinklers and fire protection as required by the Fire Marshall. - i. Move an electrical control panel for the light dimmer system. - j. Provide modifications to the duct system, per modified drawings. - 2. Neurocom Room: provide enclosure for existing piping to remain. - 3. Metabolic Room: remove gas valves installed on the oxygen and vacuum system and add medgas. - 4. Provide conduit and box installations for rerouting existing Nurse Call systems. - 5. Provide added project management, site supervision, and additional cost for work to be accomplished outside of normal construction hours, to coordinate modifications to the work required by drawing modifications, and to address modifications required by the Fire Marshall and the Clinical Center. - 6. Room 1-2341: - a. Move the hallway door to coordinate with modifications to the furniture. - b. Add furniture partitions, conduit, and data poles to provide for CIT requirements. - c. Add electrical circuits as required by modified furniture and electrical drawings, to address existing conditions. - 7. Room 1-2340: modify sprinklers per the Fire Marshall. - 8. Room 1-2445: install additional shelving, per IC request. - 9. Room 1-2420: - a. Provide duct and electrical conduit modifications due to drawing modifications and CIT requirements. - b. Provide additional circuits to meet CIT requirements and address existing power conditions. - 10. Deliverable Schedule: - a. If Tishman is permitted to do the work, there is no additional time required for the modifications and added work and the current construction schedule can be maintained.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS