Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

K063--Crescent House EST4 Fire Alarm Upgrade

Closed
36C24126Q0434Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561621
New
Federal
CGSC Access Control System Replacement
Solicitation # W91QF4-26-Q-A040
Solicitation W91QF4-26-Q-A040 is a request for quote for the life-cycle replacement and upgrade of the Access Control Systems (ACS) and Network Video Management Server at the Command and General Staff College (CGSC) located at Fort Leavenworth, Kansas. This total small business set-aside project requires the migration of existing Lenel systems to Software House C-Cure 9000, involving the replacement of 19 Lenel controllers with iSTAR Ultra G2 controllers across 218 access-controlled doors. Additionally, the contractor must replace the current Network Video Server with a new AI-driven Smart Video Management System. The scope of work is phased by building and includes installations at the Lewis and Clark, CARL, GIF, Flint, Muir, and Truesdale facilities. The contractor must ensure all equipment is FIPS 140-2 pre-hardened and maintains Army STIG compliance. Key requirements include the submission of a written Quality Control Plan within thirty days of award and the completion of a Performance Verification Test in the presence of a government official. All personnel must be U.S. citizens fluent in English, and the contractor must adhere to NIST SP 800-171, DoDD 8140.01, and AR 25-2 cybersecurity standards. Proposals are due by September 16, 2026, at 4:00 PM CST, with a question cutoff date of September 11, 2026. Offerors must be registered in the System for Award Management (SAM) to be eligible for award.
W6QM Micc-Ft Leavenworth

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 561621
New
SLED
Collier County Security Modernization
Solicitation # 26-8694
Collier County Procurement Services has issued Request for Information solicitation 26-8694 to identify vendor capabilities for a large-scale modernization of its physical security infrastructure across 83 locations. The objective is to implement a unified, event-driven enterprise security platform utilizing open architecture and cybersecurity-first design principles. The scope includes the full replacement of the legacy Pelco Endura Video Management System with a Linux-based, ONVIF-compliant platform managing approximately 1,175 cameras, as well as a complete replacement of the JCI P2000 access control system supporting 894 doors. The project also involves the integration of 210 Code Blue emergency call boxes, burglar alarm systems, and IP Videowall technologies to enable intelligent workflows, such as automatic camera call-ups triggered by security events. This RFI is a non-bidding method used to assess potential timelines, resource considerations, and technical capabilities; consequently, vendors are explicitly prohibited from including pricing information in their responses. Requirements include detailed descriptions of cybersecurity standards, patching and vulnerability management processes, and a phased migration strategy starting with pilot sites. Vendors must also provide information on onsite validation testing, training for operators and technicians, and service level agreements for support. Responses must be submitted electronically via the Collier County Procurement Division Online Bidding System by October 12, 2026. Future enhancements under consideration include AI-assisted prioritization, mobile credentials, license plate recognition, and facial recognition.
Procurement Services

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to the upgrade of the fire alarm system at the Crescent House Transitional Residence Program in Lowell, Massachusetts, replacing the existing Edwards EST3 control panel with the mandatory Edwards EST4 system. This is a Firm-Fixed-Price contract awarded under Simplified Acquisition Procedures as a Service-Disabled Veteran-Owned Small Business Set Aside, with the NAICS code 561621. The scope includes full removal and replacement of the fire alarm control panel, associated battery backups, remote annunciators, and integration with existing sprinkler and wireless fire department notification systems. While the contract allows for the reuse of some components, only newly installed, replaced, or reused equipment by the contractor is covered under the required one-year warranty; legacy devices such as non-addressable smoke detectors, which are independent of the panel system, are excluded from warranty obligations. The EST4 panel is non-negotiable—no alternative manufacturer-supported or UL-listed panels are acceptable, even for cost savings, due to requirements for system uniformity across VA facilities. All work must comply with NFPA 72, NFPA 13, UL standards, and VA facility regulations, with final acceptance subject to VA’s internal Authority Having Jurisdiction and the Project Manager/COR at the performance site. The contractor is allotted a fixed 10 hours of labor under CLIN 0003 for troubleshooting unforeseen wiring or programming issues related to the installation of the EST4 panel, with any additional time requiring a contract modification or a separate NTE task order. The government will not provide funding for replacing degraded field wiring or addressing ground faults beyond this allocation; such issues would necessitate a new solicitation or on-site resolution by local personnel. All non-addressable smoke detectors are standalone 120V devices not connected to the main panel, and the horn/strobes in Unit 110 can be replaced with identical or better-rated units that meet NFPA 72 requirements without modification. The existing Edwards SDU program configuration is available on a flash drive at the panel but cannot be transferred to government systems. Technical support is limited to a single one-hour exit briefing for staff training and handover of documentation, with no ongoing support included. The response deadline has been extended to May 6, 2026, and proposals must be submitted electronically to the Contract Specialist, Yolanda Rankin, at va.gov, including a completed Price Schedule and up to three Past Performance references. Offerors must be registered in SAM.gov with a valid

General Info

Upgrade fire alarm system with Edwards EST4 panel at Lowell residence, fixed price, VA compliance, no alternatives, one-year warranty on new installs.

Agency

Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)View Agency

Contract Value

$42,500

NAICS

561621 - Security Systems Services (except Locksmiths)View NAICS

Place of Performance

Crescent House Transitional Residence Program 15 Veterans Way, ME

Set-Aside

SDVOSBC

Awardee

BOISSONNEAULT ELECTRIC CORPView Profile

Award Issued Date

Documents

(2)

RFQ 36C24126Q0434 Crescent House EST4 Fire Alarm Upgrade

DOCXrfq

Amendment 0001 to Solicitation 36C24126Q0434 for Crescent House EST4 Fire Alarm Upgrade

DOCXamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Organization / Agency
Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
View Agency Profile
Office AddressTOGUS, ME, 04330, USA
Contacts
Yolanda RankinContract Specialist

Full Description

Show more
Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will be extended to May 6, 2026. Question: Are manufacturer-supported, UL-listed fire alarm control panels compatible with the existing devices acceptable as an alternative to the specified EST4 fire alarm control panel? Answer: No. Compatible alternative panels will not be accepted. An Edwards EST4 fire alarm control panel is specifically required for this upgrade. Question: If troubleshooting the "unforeseen" issues or the known MAP fault exceeds the 10 hours allocated in CLIN 0003, will the government issue a contract modification, or is the contractor expected to absorb the cost of indefinite repairs under the strict Firm-Fixed Price terms? Answer: No, the contractor is not expected to absorb the cost of indefinite repairs. The unit is a single floor that occupies approximately 1100-1200sqft. It is 5 rooms with 2 bedrooms and drop ceilings throughout, that is located one apartment away from the main panel. Unit 110 has 5 peripheral devices in it: 1 addressable and 2 non-addressable listed smoke detectors, 1 horn/strobe, and 1 pull station. The replacement of all peripherals in the apartment is already included elsewhere in the contract and that cost will be accounted for under that portion. 10 man hours is reasonable to do any remaining troubleshooting/repairs to correct any remaining wiring or programming problem(s). Question: Can the government provide the historical maintenance logs or the specific trouble codes currently displayed on the EST3 panel regarding the "known MAP fault" so contractors can accurately assess the severity of the issue? Answer: The system is annually tested, and all devices have reported to have passed all required tests. Something was bypassed; I was told it was in apartment 110. I was told there was an issue there. I was not told what the issue was and/or it could not be made clear what the issue was. The last alerts on the panel are: 0001 Local Trbl Act Cresent House Building 0002 Disabled Active 01020687 Ground Fault Data Card 2 0003 Local Trbl Act 01020682 Map Fault Data Card 2
Question: Can you confirm if the new EST4 panel will require specific legacy loop controller cards or modules to communicate effectively with the 77 existing non-addressable smoke detectors? Answer: The non-addressable smoke detectors are not tied into the fire alarm panel. They are independent and function to alert residents of cooking issues prior to creating a fire and setting off the addressable smoke detectors that are tied into the panel. Question: If existing field wiring is found to have ground faults or degradation that prevents proper I/O point-to-point testing with the highly sensitive new EST4 panel, will the government provide a contract modification to correct these issues? Answer: No, depending on the location and scope of the problem outside of the 10 hrs already allotted, there would either be another contract solicitation to replace all the wiring, or the wiring would be replaced on site by local personnel. Question: Can the government provide the exact make, model, K-factor, and temperature rating of the "primary style" sprinkler heads currently installed? Answer: (See Pic) Viking VK302, Model M, 5.6K, Standard Pendent, QR, ½ NPT, Chrome, 155deg F, equivalent or better.
Question: Can the government confirm the specific candela rating of the existing horn-strobes in Apartment 110, and verify that replacing them with "identical units" will still meet current NFPA 72 spacing and visual notification requirements for a multi-bedroom unit? Answer: Yes, identical units or better if desired will meet the requirements.
Question: Section B of the scope of work states shop drawings are to be approved by the VA and AHJ. Can you clarify who the AHJ is in this case? In our experience, the VA is the AHJ, so we re just looking for clarity regarding who else needs to approve the shop drawings. Answer: The Authority Having Jurisdiction will be part of VA s internal approval process. Question: Section G of the scope of work requires a minimum one-year warranty on all equipment and installation labor to include all reused/reinstalled equipment components. Can you clarify what the warranty is intended to cover with respect to reused equipment? Are you expecting existing smoke detectors, or other similar equipment which we do not touch as part of this upgrade, to be covered under the warranty? Upgrading this fire alarm panel wouldn t typically warrant the entire fire alarm system, especially those components which are existing to remain. Answer: The contractor is not expected to warrant the entire system with all peripheral devices for 1 year. Only the things that the contractor replaces, installs, or reuses. Example: If the contractor decides to reuse one of the modules from the old panel, then they just need to warrant that module for a year for replacement including parts and labor at no additional cost to the government. Question: Section G of the scope of work also requires post-installation technical support by contract terms. What are these terms and how long is this support intended to last? Outside of the warranty, any additional support would need to be handled via contract modification or a NTE line item for a fixed number of support hours. Offerors cannot provide fair and reasonable pricing by including an unknown amount of additional undefined support. Answer: After the new system is completely installed, tested, and there are no issues, there should be up to a 1-hour exit brief to answer any questions and provide answers to the staff if they have any questions. This would also be a good time to hand-over any paperwork, manuals, testing certificates, etc Question: Is this system a Speaker Strobe System or Horn Strobe System? The RFP says "Horns Strobes with Speakers" Answer: Horn Strobe.
Question: If speaker strobe system, are we installing a Microphone in the Main Panel and/or the Annunciator? Answer: Microphone is not necessary. Question: Can we get a copy of the existing Edwards SDU program from the original installer? This would answer most questions about system architecture and will be needed for the conversion from EST3 to EST4 Answer: We have a copy of the original installation on a flash drive at the panel. This would be made available at the time of the upgrade. The VA does not allow us the capability to transfer that information from the USB onto a government computer to send out. I will attach a modified printout copy of Q1/FY26 Fire/Life Safety System Inspection, Testing and/or Maintenance Certificate. This lists all the devices. Question: Are there local 120v Devices in the apartments (maybe these are the non-addressable detectors) or do they need sounder bases with the smoke detectors for general alarm? Answer: The local 120v devices listed are not tied into the panel system. (Deeper explanation under response for question 4) Question: Are manufacturer-supported, UL-listed fire alarm control panels compatible with the existing devices acceptable as an alternative to the specified EST4 fire alarm control panel if there s a cost savings available for the government? Answer: No, the facility wants uniformity among the multiple buildings at multiple sites. This affords the government a separate cost savings not included in this upgrade.

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 333310
New
Federal
Pacific Floor Care-Floor Scrubbers/Vacuum COMBINED SYNOPSIS/SOLICITATION–FAR 19.502-2(a) SB SET-ASIDE -BRAND NAME
Solicitation # 36C24126Q0821
Solicitation 36C24126Q0821 is a brand-name request for quote issued by the Department of Veterans Affairs Network Contracting Office 1 to provide industrial-grade floor care equipment for the Manchester VA Medical Center. This procurement is a total small business set-aside under NAICS code 333310, specifically targeting the acquisition of Pacific Floor Care equipment to standardize cleaning operations in patient-care corridors and high-traffic areas. The required equipment includes two 28-inch disk scrubbers with lead-acid batteries, two QS-12 walk-behind scrubbers, and eight V15ED upright dual-motor vacuums. All units must be delivered fully assembled and tested, accompanied by necessary accessories such as pads, chargers, and safety labels, as well as required documentation including safety data sheets and battery maintenance guides. The contract is awarded to the responsible service-disabled veteran-owned small business that meets all technical specifications and offers the lowest evaluated price. Performance is structured across five tasks, with delivery required within 30 days of award, installation and training within 45 days, and final inspection and acceptance within 50 days. Acceptance is contingent upon successful functional tests and an operational simulation in a patient-area corridor. The equipment must adhere to Environmental Management Service cleanliness standards and include specific safety features such as BatteryShield motor-disable protection. Quotes are due by September 18, 2026, and must be submitted electronically to the designated contracting officials.
Commercial and Service Industry Machinery Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 339113
New
Federal
STERIS InnoWave Irrigator
Solicitation # 36C24126Q0765
The Department of Veterans Affairs, through the Network Contracting Office 01, is soliciting quotes for the procurement of one STERIS InnoWave PCF Sonic Irrigator for the Sterile Processing Services Department at the Manchester VA Medical Center in New Hampshire. This combined synopsis and request for quote is set aside for small businesses under NAICS code 339113. The scope of work includes the delivery, installation, and operational verification of the equipment, as well as the deinstallation and disposal of an existing inoperable ultrasonic cleaner and all associated packaging materials. The equipment must feature thermal disinfection and robotic program capabilities, with the ability to process up to 20 lumened devices or 44 pounds of instruments per cycle. The contractor is required to provide onsite operational training for staff covering maintenance, safety, and troubleshooting. Delivery must be completed within 45 days of the order receipt, with full installation and verification finalized within 90 calendar days of the award. Award decisions will be based on price, past performance, and speed of delivery. Interested offerors must submit their quotes by September 21, 2026, including their Unique Entity Identifier and a statement of agreement with the solicitation terms. The procurement is justified as a single-source requirement due to the specific manufacturing by Steris Corporation and the need for compatibility with existing workflows, though it remains open to small business distributors.
Surgical Appliance and Supplies Manufacturing

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS