Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 13, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J--USNS KAISER LESLIE VALVE RPR

Awarded
N4044312T0113Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
NAVY NP FENDER RENEWAL
Solicitation # 70Z04027Q60514Y00
The U.S. Coast Guard Surface Forces Logistics Center is soliciting quotes for a Firm Fixed Price Purchase Order to perform a rubber fender system renewal on a 108-foot Yard Patrol Craft. The scope of work includes the removal of existing upper and lower fendering, securing bars, and hardware from the exterior hull and transom, followed by the installation of new rubber fenders and associated hardware. Specific requirements include replacing up to 60 linear feet of CRES securing flat bars and 75 linear feet of mounting plates and oak shims, as well as installing new studs, nuts, and washers. The government will provide 24 Type-D black EPDM fenders as government furnished material located at the Coast Guard Yard in Curtis Bay, Maryland, which also serves as the place of performance. This is a total small business set-aside conducted under FAR Part 13 Simplified Acquisition Procedures, with awards based on best value considering technical requirements, deadlines, and price. All work must be completed by December 11, 2026. Quotes must be submitted via email to Erica Gibbs by November 16, 2026, at 9:00 am Eastern. Payment will be processed via Net 30 terms through the IPP system, and no down or advanced payments will be provided. Vendors must be able to secure funding until delivery and may need to be registered in the Joint Certification Program to access export-controlled drawings.
CG-SEA-C23

POSTED

about 7 hours ago

DEADLINE

in 17 days
NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by NAVSUP FLC Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from November 12, 2026, to November 18, 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, cleaning and inspection of air conditioning and refrigeration plant condensers, rust and corrosion removal, replacement of lagging and insulation, furniture upholstery replacement, and the provision of rigging services and scaffolding. All work must adhere to NAVSEA Standard Items and SCF Part 1915 Occupational Safety and Health Standards for Shipyard Employment. Award will be granted to the lowest priced technically acceptable offeror, with technical capabilities rated as either acceptable or unacceptable. Prospective contractors must submit a completed J-1 Price Breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Required submission documentation includes Standard Form 18, completed Standard Form 30 amendments, and technical qualifications verified via the Attachment J-3 checklist. The deadline for proposal submission is November 2, 2026, at 13:00 CET. Post-award invoicing must be processed electronically through Wide Area WorkFlow.
Navsup Flc Sigonella Naples Office

POSTED

about 7 hours ago

DEADLINE

in 3 days
NAICS: 336611
New
Federal
Misty Barge Dry Dock Services
Solicitation # 1240BF27Q0002
Solicitation 1240BF27Q0002 is a total small business set-aside issued by the USDA-FS CSA Northwest 4 for dry dock services for the Misty Barge, currently located at Shelter Cove on Revillagigedo Island, Alaska. The scope of work includes hauling out the vessel, performing exterior hull sandblasting and painting, repairing the exterior deck and appurtenances, painting the interior hull, and cleaning bilge tanks. All painting must adhere to Preparation and Painting Specification 00300 and manufacturer recommendations, specifically utilizing PPG products. The period of performance extends from the date of award through April 1, 2027, with specific deliverables including a work schedule, coating products list, and interior bilge painting plan due shortly after the start date. Offers are due by November 6, 2026, following an extension granted by Amendment 0001. Proposals must be submitted via email as three separate attachments covering technical capability, past performance, and price. Award will be based on the most advantageous quote, with price serving as the primary evaluation factor. Technical evaluations will focus on the provided draft work schedule and proposed haul-out dates, while past performance will be assessed based on recency and relevancy within the last three years. The contractor is responsible for implementing a Quality Control Plan managed by a designated Quality Control Representative, while the government will maintain Quality Assurance through performance requirements measures.
Csa Northwest 4 Usda-Fs

POSTED

1 day ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Solicitation N4044312T0113, issued by the Military Sealift Fleet Support Command under the Department of Defense, is a total small business set-aside for the overhaul of a 16 inch Leslie valve on the USNS KAISER. The project requires a contractor to perform a class A overhaul of the valve, which involves removing approximately 3,000 gallons of CFW water for reuse, installing a temporary spool piece to maintain system operations for air conditioning and refrigeration, and transporting the valve to a shore facility for repair. Once the overhaul is complete, the valve must be reinstalled and the CFW water returned to the system. The performance period for this work is scheduled from April 16, 2012, through April 29, 2012, in Pearl Harbor, Hawaii. A shipcheck was scheduled for March 29, 2012, to allow interested parties to assess the requirements and provide recommendations. The contract falls under NAICS code 336611 and is managed by Contract Specialists Dominick J Fonte and Mary K Ablola.

General Info

Contract Value

$36,051

NAICS

336611 - Ship Building and Repairing

Place of Performance

AE, USA

Set-Aside

NONE

Award Issued Date

Documents

1

12-T-0113 Amendment 0002

DOC, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Fleet Support Command
Contacts2 people available
OfficeFPO, AE, 09622-0023, USA
Office AddressFPO, AE, 09622-0023, USA
Contacts
DOMINICK J FONTEContract Specialist
MARY K ABLOLAContract Specialist

Full Description

Show more
This Presolicitatioin is provided as notice of the scheduled shipceck for 0800, local time, Hawaii, 29 March 2012. The VR will be a total small business set-aside. Interested parties are to contact Chief Engineer (ChEng) Lars Andres, USNS KAISER,, Cell # +1 (555) 000-0000 to coordinate and confirm attendance. The shipcheck is to provide interested parties with the opportunity to assess the requirements, and entertain recommendations, as to approach in performing repairs to the CFW Valve. No work is to be performed during the ship check. Other work may be incorporated into the formal solicitation, which will be issued at a later date; along with applicable clauses. Please designate POC for shipcheck attendance confirmation. See www.msc.navy.mil contracts library for Rapid Gate, EPIC and SHIP ACCESS instructions. KAISER VR is scheduled to commence April 16, 2012, with Performance Period or 16 April thru 29 April. With regard to the eventual performance of repairs during the VR, the following description of the work scope, limited to the CFW valve, is provided: Remove approx 3,000 Gallons of CFW water and retain for re-use. The water must be back on board the same day because CFW effects the Air conditioning, chill and freezer boxes. Remove 16" Leslie valve from system and install fabricate and install a spool piece so the system can be put back on line the same day. Spool piece to be turned over to ship once removed for future use. 16" Leslie shall be transported to contractor's ship foe a class "A" Overhaul. Once valve is repaired the contractor shall have to remove and retain approx. 3,000 gallons of CFW and return back to system once Leslie valve is install. Pearl Harbor Hawaii Performance Period for VR is 16 APR 12 thru 29 APR 12.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS