Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Kalispel Tribe Dike Repair- Pend Oreille County, Washington

Active
12FPC326B0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

NRCS Washington is seeking proposals for the repair of the Kalispel Tribe Dike in Pend Oreille County, Washington. The scope of work includes site dewatering, erosion control, soil excavation, and the management of a 36 inch diameter dike culvert and anti seep collars. Depending on the condition of the existing materials as determined by the COR, the contractor will either reset the current culvert and collars or install new ones, followed by the placement of riprap, nonwoven geotextile, and the backfilling and compacting of the dike. This project is a total small business set aside with an estimated magnitude between 250,000 and 500,000 dollars. A site visit is scheduled for September 10, 2026, at 10:00am PT at the Kalispel WRP Dike. All quotes must be submitted by September 21, 2026, at 2:00pm PT.

General Info

NRCS seeks small business proposals for Kalispel Tribe Dike repairs in Washington state.

Agency

Department Of Agriculture → Fpac Bus Cntr-Acq DivisionView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Cusick, WA, USA

Set-Aside

SBA

Documents

(5)

Kalispell Dike Repair Drawings

PDFspecifications

Kalispel Tribe Dike Repair Construction & Material Specifications

PDF56 pagesspecifications

USDA Statement of Work - Kalispel Tribe Dike Repair

PDF4 pagessow

WA20260136 Wage Determination for Washington Heavy Construction

PDF5 pageswage-determination

12FPC326B0016 Kalispel Tribe Dike Repair IFB

PDF38 pagesifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Fpac Bus Cntr-Acq Division
Contacts1 person available
OfficeWASHINGTON, DC, 20250, USA
Organization / Agency
Department Of Agriculture → Fpac Bus Cntr-Acq Division
View Agency Profile
Office AddressWASHINGTON, DC, 20250, USA

Full Description

Show more

NRCS Washington is soliciting proposals to repair the Kalispel Tribe Dike located in Pend Oreille County, Washington. This project consists of dewatering the site, providing erosion control, excavating the existing dike soil and stockpiling, removing the 36" diameter dike culvert and anti-seep collars, if in suitable condition, as determined by the COR, resetting the existing dike culvert and anti-seep collars, placing riprap and nonwoven geotextile around the culvert outlet, backfilling and compacting the dike. If the existing 36" diameter dike culvert and anti-seep collars are not salvageable, then a new 36" diameter culvert and anti-seep collars will be installed as specified.



SITE VISIT: The Site Visit will take place on September 10, 2026, at 10:00am PT.
SITE VISIT LOCATION: Kalispel WRP Dike, Pend Oreille County, Washington Section 25, T33N, R43E Lat: 48.329193, Long: -117.311591



Quotes will be due on September 21, 2026 by 2:00pm PT.


The magnitude for this project is between $250,000 and $500,000.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse bond premiums. The solicitation specifically encourages quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms, and emphasizes the importance of maintaining labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Agriculture → Fpac Bus Cntr-Acq Division

Same awarding agency