Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stone Dike and Wave Berm Installation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
IFB No 134548 Billeting Retaining Walls, Drainage and Soil Stabilization
Solicitation # 134548
The California Military Department is soliciting bids for IFB No. 134548 to install a temporary K-rail retaining wall, drainage, and soil stabilization system at Camp San Luis Obispo. The scope of work includes the installation of 480 total feet of retaining walls using 24 precast concrete units, the installation of six grated inlets and six 6-inch-diameter solid outlet pipe routes, and the application of soil stabilizer to create hardened sections between buildings and walls. The project requires a prime contractor holding a California CSLB Class A General Engineering or Class C-12 Earthwork and Paving license. All work must adhere to California public works labor requirements, San Luis Obispo County prevailing wages, and Cal OSHA safety standards. Bidders must attend a mandatory pre-bid job walk on November 17, 2026, and submit all questions by November 20, 2026. Bids are due by November 30, 2026, at 2:00 PM, with the bid opening following at 2:15 PM. The contract will be awarded to the lowest responsive and responsible bidder, with a 5% preference for certified Small Business or Microbusiness enterprises and a 5% goal for Disabled Veteran Business Enterprise participation. Required documentation includes a bid bond, a completed rate sheet, and various certifications including non-collusion and civil rights compliance. Performance and payment bonds are required if the contract exceeds specific monetary thresholds.
California Military Department

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 237990
New
SLED
RFB No. 27-0017 Carver Lake Park - Phase 1
Solicitation # 27-0017
The Columbus Consolidated Government is soliciting bids for the Carver Lake Park Phase 1 project in Columbus, Georgia. The scope of work involves comprehensive site improvements, including demolition, clearing, grubbing, earthwork, and grading. Key deliverables include the construction of access drives, parking areas with permeable pavers, concrete sidewalks, curb and gutter, and a 10-foot-wide multi-use trail. The project also encompasses the development of playground and pavilion areas, improvements to the existing splash pad, fencing, site signage, landscaping, and associated storm drainage and utility improvements. The contract will be awarded to the responsive and responsible bidder submitting the lowest base bid. Qualified bidders must be licensed contractors in the State of Georgia, maintain a permanent place of business, and demonstrate sufficient financial resources and construction experience. The project requires substantial completion within 550 consecutive calendar days, with final payment readiness by 580 days. Successful bidders must provide performance and payment bonds totaling 100 percent of the contract amount. The project mandates strict adherence to various federal and state regulations, including the Davis-Bacon Act, the Copeland Act, and the Anti-Kickback Act, while emphasizing a preference for qualified local labor and businesses.
Columbus Consolidated Government

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Cheshire Park Adaptive Turf Field
Solicitation # 2627-03
The Town of Cheshire is soliciting competitive bids for the Cheshire Park Adaptive Turf Field project (ITB #2627-03) in Connecticut. This project utilizes the AIA Document A101-2017 Standard Agreement and requires a lump sum base bid, with optional alternates for field lighting, a scoreboard, dugout shelters, a batting cage, and a turf groomer. Sealed bids must be submitted in opaque envelopes—including one original, one copy, and one electronic copy on a USB drive—to the Department of Public Works and Engineering by 11:00 AM on December 1, 2026. Bids must be signed by a principal officer or owner and include a bid bond or certified check for 5% of the bid amount for contracts exceeding $50,000. The scope of work involves comprehensive site development, including grading, utilities, and sediment and erosion controls, supported by geotechnical and topsoil analysis. Technical requirements include a 25-year warranty on light levels and strict adherence to IESNA RP-6-22 for illumination measurements. Contractors must comply with prevailing wage laws, the Americans with Disabilities Act, and state set-aside requirements for minority and women-owned businesses. Quality control is rigorous, requiring specific handling and storage of coated reinforcing steel and mandatory field density testing. Project administration is overseen by the Town Engineer and the Director of Public Works, with payments processed using EJCDC Form No. C-620.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in 20 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of a boat ramp facility consisting of four launching bays, totaling eight launching ramps. Key activities include the removal of existing degraded concrete structures, dredging and grading of native soils, placement of various gravel fill gradations, and the installation of new concrete ramps designed to support vessels exceeding 35 feet with combined weights over 10 tons. The project requires the contractor to provide a final design, all necessary labor, equipment, and environmental protections, including the use of turbidity curtains and adherence to NPDES management measures. Additionally, the contractor must manage the temporary relocation and preservation of existing floating docks, gangways, and fixtures to ensure they are reusable and ADA-compliant upon completion. The contract period is 180 calendar days from the Notice to Proceed. Bidders must choose between two construction sequencing options: Alternate A, which utilizes a three-phase approach to minimize public disruption, or Alternate B, which allows for a simultaneous closure of all ramps for a maximum of 45 days. The contract will be awarded to the lowest responsible and responsive bidder. Submission requirements include a bid security equal to 10 percent of the maximum bid price, a current Florida contractor license, and various certifications regarding scrutinized companies and anti-human trafficking laws. Technical specifications mandate a minimum concrete compressive strength of 4,000 PSI and a design load of 300 PSF. The estimated value associated with the marine construction category for this project is 750,000 dollars.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This subcontract, titled Stone Dike and Wave Berm Installation, is issued by the Department of Defense under the W07V Endist New Orleans agency. The project focuses on foreshore risk reduction for prime contractors working on US Army Corps of Engineers projects. The primary scope of work involves the installation of stone armor and bedding, specifically placing stone for dike caps and wave berm repairs to maintain accurate cross-section profiles. Operations will be conducted using marine cranes and barges to deliver completed stone dike caps and wave berms. The contract falls under NAICS code 237990 and was posted on September 18, 2026, with a response deadline of October 19, 2026.

General Info

DoD subcontract for stone dike and wave berm installation for foreshore risk reduction.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

LA, USA

Set-Aside

NONE

Documents

This scope was carved out of W912P826BA009.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist New Orleans
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs stone armor and bedding for foreshore risk reduction for prime contractors on US Army Corps of Engineers projects. Places stone for dike caps and wave berm repairs to ensure correct cross-section profiles using marine cranes and barges. Delivers completed stone dike caps and wave berms.

More opportunities from Department Of Defense → W07V Endist New Orleans

Same awarding agency

NAICS: 562219
New
Federal
ENVIRONMENTAL WASTE REMOVAL FROM DREDGE WHEELER BPA
Solicitation # W912P826QA033
The Department of Defense, through the USACE New Orleans District, is establishing a Blanket Purchase Agreement for environmental waste removal from the Dredge Wheeler. The contractor is responsible for providing all labor, equipment, and materials necessary to safely remove waste oil, contaminated water, oily filters, and rags. Most services will be performed at the vessel's home port at 7400 Leake Avenue, New Orleans, Louisiana, and must comply with United States Coast Guard over-water transfer requirements and Environmental Protection Agency regulations. Key deliverables include the removal of waste oil and contaminated water billed per gallon, the provision of three-yard waste disposal containers, and the removal of 55-gallon drums and 330-gallon totes. This procurement is a total small business set-aside. Performance is monitored by a government inspector with a zero percent deviation allowed from specifications, and all work must adhere to the USACE Safety Manual. Invoicing is handled via email, with payments under 10,000 dollars processed via Government Purchase Card and amounts exceeding that threshold handled by the USACE Finance division. Proposals must be submitted through the PIEE Solicitation Module by the specified deadline, ensuring files are in PDF or Microsoft Office format.
Other Nonhazardous Waste Treatment and Disposal

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237990
Federal
Barataria Bay Waterway, Maintenance Dredging, Bar Channel
Solicitation # W912P826BA062
The US Army Corps of Engineers, New Orleans District, is soliciting bids for a firm fixed price contract for maintenance dredging of the Barataria Bay Bar Channel in Jefferson Parish, Louisiana. The scope of work involves the removal of shoal material and its disposal at the Grand Terre Island disposal site, with no dike work required. The project includes the dredging of an estimated 375,000 cubic yards for the primary requirement and an additional 100,000 cubic yards as an optional quantity, along with mobilization, demobilization, and bird nesting avoidance measures. The estimated time for completion is 90 calendar days after the receipt of the notice to proceed. Award will be made to a single bidder based on total price, with a 10 percent evaluation preference applied to HUBZone small business concerns and other successful small businesses. The contractor must adhere to EM 385-1-1 safety standards, the Seagoing Barge Act, and prevailing wage rates specified in General Decision LA20260007. Key deliverables include a preliminary project schedule within 15 days and an initial project schedule within 42 days of the notice to proceed. Final acceptance is contingent upon a formal inspection by the Contracting Officer, requiring 14 days advance notification from the contractor. Payments will be processed electronically through the Wide Area WorkFlow system.
Other Heavy and Civil Engineering Construction

POSTED

2 months ago

DEADLINE

in almost 2 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS