Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 27, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

KC-135 Hydraulic Starter Motor Redesign

Closed
FA8212-20-R-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 13 hours ago

DEADLINE

in 16 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

UT

Set-Aside

NONE

Documents

5

A001+thru+A009.pdf

PDF

A010+Thru+A018.pdf

PDF

FA821220R0004.pdf

PDF

KC+HSM+Statement+of+Objectives+DRAFT6.3.pdf

PDF

PWS+Eaton+starter+Redesign.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8212 Afsc Olh Pzaba
Contacts2 people available
OfficeHILL AFB, UT, 84056, USA
Office AddressHILL AFB, UT, 84056, USA

Full Description

Show more
With aging aircraft hardware, new mission requirements, and a desire to keep weapon systems operational beyond original projections, the Government has an increasing desire to improve safety, reliability and maintainability while driving down the cost of ownership of aircraft systems and subsystems. The Government answers this requirement by funding improvement projects under the Component Improvement Program (CIP). Secondary Power Systems (SPS) is comprised of those parts which are used to start main engines with start carts, Auxiliary Power Units (APU), or Jet Fuel Starters (JFS) as well as those parts which are integral for continual aircraft power generation via Accessory Drive Gearboxes (ADG) or Aircraft Mounted Accessory Drive (AMAD) gearboxes and Power Take-Off (PTO) shafts. This performance work statement is specifically tailored for the KC-135 Hydraulic Starter Motor for which Eaton is the Original Equipment Manufacturer (OEM). The use of sound engineering is required to research and develop the necessary solution.

More opportunities from Department Of Defense → FA8212 Afsc Olh Pzaba

Same awarding agency

NAICS: 3364
New
Federal
Sources Sought: F-16 Transparencies
Solicitation # FD20202700027
The United States Air Force is conducting a Sources Sought notice to identify and qualify new manufacturers for F-16 polycarbonate canopy transparencies across six specific National Stock Numbers. Currently, PPG Aerospace is the sole qualified source, and the government aims to expand its industrial base to support both USAF and Foreign Military Sales requirements. The anticipated acquisition strategy is a five-year Multiple Award Indefinite Delivery/Indefinite Quantity contract with an expected award date of September 2027, forecasting a monthly demand of 40 to 50 units. The contract will likely include on-ramping provisions to add newly qualified contractors after the initial award. To become eligible for award, interested manufacturers must complete a rigorous qualification process estimated to take 365 days and cost approximately 329,000 dollars. This process requires the submission of a qualification test plan for approval and the provision of a pre-contract award qualification article at the contractor's expense for form, fit, and function evaluation. Technical requirements include strict adherence to MIL-STD-130 and DFARS 211.274 for permanent Item Unique Identification marking. Access to necessary engineering data requires a JCP printout or DD 2345, and foreign parties must be cleared through the Foreign Disclosure Office.
Aerospace Product and Parts Manufacturing

POSTED

7 days ago

DEADLINE

in 4 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS