Keene Pavement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Keene Pavement Project, managed by the California Department of Transportation as the lead agency, involves infrastructure improvements at 38 stream locations along State Route 58 in Kern County, California, specifically between highway post mile 76.38 and PM R88.59. The scope of work includes the extension of existing culverts and the installation or replacement of concrete headwalls, alternate flared end sections, rock slope protection, and drainage inlets. Additionally, the project requires the construction of a new stormwater retention basin. This project is executed under Lake and Streambed Alteration Agreement number EPIMS-KER-62886-R4 in accordance with Fish and Game Code section 1602. The California Department of Fish and Wildlife, acting as the responsible agency, issued a Notice of Determination on June 11, 2026, stating that the project will not have a significant environmental effect within its jurisdiction based on a Mitigated Negative Declaration. The project is classified under NAICS code 237310 for highway, street, and bridge construction.

General Info

Caltrans extends culverts on SR-58 in Kern County with environmental protections, starting June 2026.

Agency

California → Caltrans, District 9 - Bishop

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 9 - Bishop
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 9 - Bishop
Office AddressN/A
Contacts
Grant PiepkornEnvironmental Scientist
Cecilia BoudreauLead Agency

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number EPIMS-KER-62886-R4, pursuant to Fish and Game Code section 1602, to the project Applicant, the California Department of Transportation. The project involves the extension of existing culverts at 38 stream locations along SR 58 in Kern County. Additional work includes the replacement or addition of concrete headwalls (HW), alternate flared end sections (AFES), rock slope protection (RSP), drainage inlets (DI), and construct a new stormwater retention basin.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving and storm sewer improvements. Key work items include the installation of 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter, along with manholes and catch basins. The engineer's estimate for the project is 1,111,000 dollars. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. To be considered, bidders must be prequalified by the City of Zeeland and include a proposal guarantee in the form of a bid bond or certified check for five percent of the total bid. The contract will be awarded based on the summation of unit prices, and unbalanced or incomplete bids will be disqualified. The project is entirely funded by the City of Zeeland and must be completed by April 30, 2027, with liquidated damages of 1,000 dollars per calendar day for delays. The selected contractor must provide performance and lien bonds each totaling 100 percent of the contract value and file certification of Workmen's Compensation Insurance. Payments will be made monthly at 90 percent of the value of work performed, with the City retaining 10 percent until final acceptance, subject to a 5 percent cap for Public Agency Contracts under MI PA 524 of 1980. Inspection and materials testing will be managed by Moore & Bruggink, Inc., and the contractor is required to implement a quality control plan following Division 5 of the MDOT Standard Construction Specifications.
Moore & Bruggink, Inc

POSTED

about 9 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS