Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on May 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Kennedy Bridge Drainage Improvements (PE24271)

Closed
PE-77068-NONST-2025-000000007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Kennedy Bridge Drainage Improvements project involves comprehensive construction work to enhance the drainage system of Kennedy Bridge, including building upstream and downstream concrete aprons, tying into existing wingwalls, and performing structural repairs at the culvert's northwest corner. The scope also includes regrading behind the upstream wingwalls, installing rip-rap for erosion control, and replacing the southbound lane and shoulder of Kennedy Bridge Road through full-depth, full-width removal and reconstruction, with excavation depths reaching three feet in specified areas. The project must be completed within 90 calendar days, with bids due by June 11th, 2025, at 2:00 PM, at the Evans County Commissioners Office, where they will be publicly opened and read. Bidders are required to submit a bid bond or certified cashier’s check amounting to at least 10% of the bid, and must demonstrate valid licensing as a Utility Contractor under Georgia law, including employing a Utility Manager certification holder for oversight. Contract documents are available for purchase from Parker Engineering, LLC, for $150 per set, with all work classified as utility contracting under O.C.G.A 43-14-2(17). The project is funded under the NAICS code 921120 and is overseen by the Evans County Board of Commissioners in Georgia.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

202505_supportingdocs_PE-77068-NONST-2025-000000007-2025-05-13_15_28_51-03a07f7d-7a74-4928-b0c5-9ac785b65061.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 77068 EVANS PE-77068-NONST-2025-000000007 to PE-77068-NONST-2025-000000007.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Evans County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Sealed bids for construction of Kennedy Bridge Drainage Improvements will be received until June 11th, 2025 at 2:00 PM at the Evans County Commissioners Office at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: This project involves the construction of upstream and downstream concrete aprons, including securely tying into the existing wingwalls. It also includes structural repairs to the northwest corner where the culvert meets the wingwall. Additional work includes the removal and regrading of existing material behind the upstream wingwalls, installation of rip-rap on both sides of the culvert for erosion control, and the full-depth, full-width removal and replacement of the southbound lane and shoulder of Kennedy Bridge Road. This includes excavation to a depth of 3 feet in two designated areas behind the headwall & wingwalls. Time allotted for final completion of work is 90 calendar days. Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: +1 (555) 000-0000, Email: contact@example.gov, upon payment of $150.00 for each full-size set (non-refundable). The Scope of Work as described herein is defined as ¿utility contracting¿ in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a ¿Utility Contractor¿ and must also employ a ¿Utility Manager¿ certification holder who will have oversight of all the work. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS