Kennel Creek Cabin Installation

Awarded
AG-0116-S-11-0089Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236115
New
26-139 Panic Hardware Installation & correcting egress door swing
Solicitation # 26-139
Solicitation 26-139 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc. to correct non-compliant door swing and clearance conditions at four electrical rooms in Edinburgh, Indiana. The project requires the removal and reinstallation of commercial door leaves, frames, and hinges to ensure doors swing outward in the direction of egress, preventing encroachment into corridors and maintaining required electrical working clearances. The contractor must furnish and install listed panic hardware allowing one-motion emergency exit and perform all necessary patching and finishing to match adjacent surfaces. All work must adhere to NFPA 101 Life Safety Code, NFPA 70 National Electrical Code 2020, and local Indiana building and fire codes. Proposals must be submitted as a single lump sum contract with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Mandatory requirements for bidders include attending a site visit on November 4, 2026, providing a valid Indiana Contractor's License, and certifying compliance with Davis Bacon Act wage rates. The successful contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work must commence within 14 days of the Notice to Proceed, and final acceptance is contingent upon a substantial completion walk-through and the submission of certified payroll records and a completed SF 1413.
Atterbury Job Corps. – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 236115
New
SLED
F&W, Residential House, Resident Fish Hatchery - Sturgeon
Solicitation # RFP-Template_format_fixed_CCT_Sturgeon-Residence-10-1-2026-xbmk.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for the design, site development, and construction of a move-in-ready residence at the Sturgeon Fish Hatchery site in Bridgeport, Washington. The project entails the creation of a code-compliant, one-story dwelling of approximately 1,598 square feet featuring three bedrooms, two bathrooms, and an attached two-car garage. The contractor is responsible for all labor, engineering, permits, and utilities, with the Teton floor plan by Adair Homes serving as the design reference. Proposals must be submitted by 3:00 p.m. PST on October 30, 2026, and must include a detailed cost proposal, a realistic project schedule, and a statement of qualifications. Award selection is based on a criteria evaluation process that considers total proposed cost, personnel qualifications, project understanding, experience, and Tribal Employment Rights Office (TERO) preferences. Preference is heavily weighted toward Colville Business Enterprises, and a responsible Indian Offeror may be awarded the contract if their price is within 10 percent of the lowest non-Indian offer. Financial requirements include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Final acceptance of the project requires a certificate of occupancy, completion of all punch-list items, and the provision of warranties and owner training.
Confederated Tribes of the Colville Reservation

POSTED

about 18 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The US Forest Service solicitation AG-0116-S-11-0089 involves the transportation and installation of a two-story cedar timber cabin and attached front deck from Hoonah to Kennel Creek on Chichagof Island, Alaska. The scope of work includes comprehensive site preparation such as excavation, foundation construction, access road resurfacing, and the creation of accessible paths. Additionally, the contractor is responsible for building a side deck, stairs, an access ramp, and a wood shed, as well as installing a prefabricated toilet. The contractor must provide all necessary labor, materials, equipment, and transportation to complete the project at a site with no existing utilities. This project is designated as a Total Small Business Set-Aside. Prospective bidders are required to be registered in the Central Contractor Registration and Online Representations and Certifications Application to be eligible for an award. The solicitation is managed by the Tongass National Forest under the Department of Agriculture, with Kim Toland serving as the primary point of contact for the acquisition.

General Info

Contract Value

$145,228.75

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)

Place of Performance

Hoonah Ranger District, HOONAH, AK, 99829, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment 1 to Solicitation AG-0116-S-11-0089

PDF, High priority: read this firstamendment
High

AG-0116-S-11-0089+Kennel+Creek+Cabin+Installation.pdf

PDF

KennelCreekCabin_Appendices.pdf

PDF

KennelCreekCabin-FINAL_DWGS.pdf

PDF

S-11-0089+Amd+2.pdf

PDF

S-11-0089+Amd+3.pdf

PDF

S-11-0089+Q%26A2.pdf

PDF

S-11-0089+Q%26A3.pdf

PDF

S-11-0089+Q%26A.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Jun 24, 2011. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 24, 2011 to Jun 30, 2011. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → R10 Alaska Regional Office
Contacts1 person available
OfficeJUNEAU, AK, 99802, USA
Office AddressJUNEAU, AK, 99802, USA
Contacts
Kim B TolandContracting Officer

Full Description

Show more
AG-0116-S-11-0089 Kennel Creek Cabin Installation Questions and Answers No information given on this document amends the solicitation. Question 1: I have a question pertaining to the woodstove. I spoke with the registered vendor and we were unable to find the height from the cabin floor to peak of the roof in the plan, which is needed in order to get the correct measurements for the stove's venting pipe. Answer 1: Distance from the cabin floor to peak of roof is approximately to be 17' 9". Question 2: Deck bull rail calls for 5/8"x13" lag bolts. What's the spacing? Answer 2: There are 2 lag bolts per 2x4 block, 3" from each end (12" O.C.). Question 3: Any finishing applied to the added deck, picnic table, sign posts or boards, or woodshed? We used cedar tint x100 (standard USFS cabin finish) on the cabin. Answer 3: The standard USFS cabin finish should be applied to the woodshed and picnic table. Use Sikkens Cetol SRD, color: Cedar, or approved equal. Apply two coats to call exposed surfaces except signposts, according to manufacturer's directions. Question 4: Decking plans call for 50d spikes to hold planks down. At 8 fathom we used 6" log screws on the deck (permachink LBC). Log screws have more holding power and are easier to install. Are we allowed this change for the deck? Answer 4: Yes. Question 5: Materials for the picnic table specs indicate they are rough sawn. Do you want them planed? Answer 5: Yes. Lumber for the picnic tables should be S4S. Question 6: The woodshed overhand. Roof overhang appears to be 12 inches on the sides, but all are undefined, clarify? Answer 6: The overall dimensions of the roof are 9' deep (along the slope) and 10' wide. Back and sides have an overhang of 1'. Front overhang is 1'10". Question 7: What amount is the bid guarantee? Answer 7: The amount of the bid guarantee is 20% or $3,000,000, which ever is less. Question 8: 6/20/11, In regards to SST toilet do the floor plan, elevation, foundation drawings, and Romtec building specifications supplied from the manufacturer (Romtec) meet the required submittal guidelines in section 01330? Answer 8: 6/23/11, The manufacturer of the SST should be able to provide the required documents for the submittal as specified in section 01330. Question 9: 6/20/11, Can you tell me if the cabin at Icy Straits Lumber in Hoonah is in a position to be trucked down the road? Can you tell us more details about that. Answer 9: 6/23/11, The cabin is very large and requires a large trailer to be moved. The roads to the project site are narrow, have limited sight distance and sharp turns and may be difficult to truck the cabin over. It is the contractors' responsibility to determine. It is expected that most contractors will choose to barge the cabin to the site. Question 10: 6/20/11, Also is there D1 in a stockpile that would work as government furnished materials? Or is there a commercial source nearby? Answer 10: 6/23/11, The nearest, full-time commercial source for graded rock is in Juneau, Alaska. There are times where graded rock may be available in Hoonah. The government will not be furnishing D-1. Question 11: 6/20/11, In regards to the removal of the existing cabin; are we demolishing it or transporting to a new site? Answer 11: 6/23/11, The removal of the existing cabin is not a part of this contract. Question 12: 6/20/11, For the stone blanket would you like the rocks to be rounded or are fractured rocks suitable? Answer 12: 6/23/11, Crushed rock can be used for the stone blanket as long as it meets the specifications. Question 13: 6/20/11, After the cabin is in place; will the government stake the remainder of all "project elements" or does the contractor need to stake and survey required elements as well? Answer 13: 6/23/11, The government will stake one or more corners of the remaining site elements after the cabin is in place. Additional surveying and staking may be required for construction and is the responsibility of the contractor. Question 14: 6/20/11, The Beach Access ramp on page 12 of the drawing plans does not give a length to the proposed beach access ramp; was that done intentionally? Answer 14: 6/23/11, The Beach Access ramp is approximately 25' long over the horizontal distance, and has a change in elevation of approximately 5'. The ramp should be constructed to meet the specified slope.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS