Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Kissimmee River Restoration (KRR) Project, S-69 Weir Repair

Active
W912EP27Z1CVLFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Atlantic Jacksonville District of the U.S. Army Corps of Engineers is conducting a sources sought synopsis for the Kissimmee River Restoration Project, specifically focusing on the repair of the S-69 weir structure located in Okeechobee and Highlands Counties, Florida. This potential fiscal year 2027 project aims to restore floodplain hydrology by repairing the weir's concrete cap and ancillary driving slab. The scope of work includes partial demolition of the concrete cap at 29 expansion joints, blast cleaning of steel components, welding new anchor studs, and installing epoxy-coated stirrups. Additionally, the contractor will be required to perform subsurface void investigations via core drilling and remediate gaps between the slab and sheet piles using controlled low-strength material or approved flowable fill. The project is anticipated to be awarded as a Firm Fixed Price contract with a rough order of magnitude between 500,000 and 1,000,000 dollars. The expected period of performance is 90 calendar days from the notice to proceed. All work must adhere to strict ASTM standards for steel, fasteners, and hardware, with quality control monitored by both the contractor and government personnel. This announcement is for preliminary planning purposes to gauge industry interest and capabilities under NAICS code 237990. Interested parties must be registered in the System for Award Management and submit their qualifications and bonding capacity by November 9, 2026.

General Info

US Army Corps of Engineers seeks contractors to repair the S-69 weir structure.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Okeechobee, FL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
Tedra Thompson
William Wallace

Full Description

Show more

Sources Sought Synopsis



PROJECT TITLE: Kissimmee River Restoration (KRR) Project, S-69 Weir Repair



This is announcement constitutes a Source Sought Synopsis and seeks information from industry which will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR BIDS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Respondents will not be notified of the results of the evaluation.



The South Atlantic Jacksonville District of the U.S. Army Corps of Engineers (SAJ) is seeking interest from prospective bidders for a potential fiscal year (FY) 2027 contract award for the subject construction project. SAJ has a requirement for the repair of components of the existing S-69 weir structure inclusive of sheet pile’s concrete cap and ancillary concrete driving slab.



The purpose of this sources sought is to gauge interest, capabilities, and qualifications of contractors that have experience in completing similar projects. The scope of the contract is inclusive of but not limited to (a) partial concrete cap demolition, (b) inspection and cleaning of existing concrete, steel bars, anchor studs and steel sheet piles, (c) preparation of studs and rebar, (d) installation of new closed-loop epoxy coated stirrups routed through the sheet pile and new anchor studs welded to the sheet pile, (e) provision of new expansion joints, (f) repairing of concrete caps with structural concrete, (g) driving slab subsurface void investigation and subsequent repairs to address separation of the slab from sheet pile, and (h) all quality control and construction administration submittals relevant to the construction effort, including as-builts of the final repaired structure.



The proposed project will be a Firm Fixed Price (FFP) contract. The Jacksonville District anticipates the issuance of a Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow-up information requested.



DESCRIPTION OF WORK:
The S-69 Weir consists of driven sheet pile walls with a concrete cap that acts as a weir and is a key feature of the Kissimmee River Restoration (KRR) Project. Located in Okeechobee and Highlands Counties, Florida, the weir’s primary function is to restore the Kissimmee River’s floodplain hydrology to pre-canal conditions by controlling water stages and discharges into the C-38 canal.



Repair of components of the existing S-69 weir structure require sheet pile concrete cap and driving concrete slab. Anticipated work includes but is not limited to: concrete removal portions of the cap, addition of new reinforcement steel closed stirrups, welding of anchor studs, providing expansion joint material, casting-in-place new structural concrete, assessment of voids underneath the driving slab through concrete coring and grouting of cored holes, and filling of gaps between the slab and cap with Controlled Low Strength Material (CSLM) or equivalent approved flowable fill.


The overall project site components encompass work to done at the following approximate location: 27.334767, -81.032830; very close to the “Chandler Slough South Trailhead”.



Specific project components include the following items and incidental related work; refer to conceptual plans for further information:



Concrete Cap Repair
1. Concrete Cap Partial Demolition at Expansion Joints
a. At 29 expansion joint locations, demolish 36” of concrete cap on each side of expansion joint. Existing rebar and sheet pile studs to remain.


2. Inspection and Cleaning of Existing Concrete, Steel Bars, Anchor Studs, and Steel Sheet Piles prior to new repair.
a. Use blast cleaning techniques for steel. Demolish concrete beyond the 36” footprint if concrete material is weak and unsuitable.


3. Drilling/Burning of holes into sheet pile to allow for closed stirrups to pass through.
a. Drill or burn 2-inch diameter holes to allow installation of closed-hoop steel stirrups.


4. Welding of new anchor studs to sheet pile.
a. Anchor stud size is 1/2"(diameter) x 4”
5. Preparation of Studs and Rebar (Coating) prior to new repair


a. Apply inorganic zinc-based primer for all existing rebar as well as both existing and new studs (coating to be applied after welding).


6. Installation of new #5 closed-loop epoxy-coated stirrups at 6” on-center, with the bottom leg routed through the sheet pile.
a. First stirrup must be 3” from expansion joint, all others to follow the spacing requirement.


7. Provision of new expansion joints.
a. Expansion joint thickness must be increased to 2”. Use Class 50 system, with ASTM C920 elastomeric sealant rated for at least 50% movement an documented as suitable for the anticipated weather and ultraviolet exposures, temperature range, and substrate conditions.


8. Repair of concrete cap using structural cast-in-place concrete (f’c = 4,500 psi).
a. Concrete quality, placement, consolidation, and curing procedures per plans and specifications will be strictly monitored by both Contractor QC and Government QA personnel.


Ancillary North Driving Slab Repair
1. Coring layout and investigation of potential subsurface voids
a. Core drill 20 cores into the slab from approximately STA 23+80 to 25+20 (centered about the primary area of concern near STA 24+50). Cores will be spaced at approximately 20-foot intervals and positions 2 to 5 feet from the inner wall to characterize conditions directly adjacent to the gap. Core drill new cores spaced at approximately 40-foot intervals along the remainder of the Northern leg.
b. Investigate cored areas for voids underneath the slabs. Coordinate with the Government for any adverse conditions found.
c. Fill all core holes with non-shrink grout after Government inspection.


2. Repair of separated slab at North leg of weir.
a. The 3-inch separation as indicated in concept drawings and all other voids must be filled with Controlled Low Strength Material (CLSM) or an approved flowable fill.


3. Repair of slab’s expansion joints
a. Expansion joints of the driving slab must be mechanically routed or scraped out, joint faces cleaned and prepared, new closed-cell backer rod installed to achieve the proper depth-to-width ration, and heavy-duty, UB-resistant elastomeric joint sealant applied.


Construction Submittals and As-Builts
1. Providing quality control and all required submittals during construction, which includes but is not limited to, the void investigation report, concrete mix design, and all product data.


2. Providing as-built documentation once repair is completed.


ROUGH ORDER OF MAGNITUDE: $500,000 to $1,000,000


PRODUCT SERVICE CODE: Z2KA – REPAIR OR ALTERATION OF DAMS


NAICS CODE: The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990 - Other Heavy and Civil Engineering Construction.


SMALL BUSINESS SIZE STANDARD: $45,000,000


The anticipated period of performance is 90 calendar days after receipt of the Notice to Proceed (NTP).


SUBMISSION REQUIREMENTS:
Responses to this Sources Sought shall be limited to 5 pages and shall include the following information:
1. Company/Contractor name, address, point of contact, phone number and e-mail address.


2. Company’s interest in bidding on the subject requirement when issued.


3. Company’s capability to perform a work of this magnitude and complexity (include company’s capability to execute comparable work performed within the past 10 years), within an area of similar remoteness. Company should provide at least 3 examples which, at a minimum, include the following:
a. Brief description of the project
b. Customer name
c. Customer satisfaction
d. Timeliness of performance
e. Dollar value of the completed projects


4. Offeror shall identify their Small Business classification and Small Business Size:
a. Small Business
b. Small Disadvantage Business
c. 8(a) Small Business
d. HUBZone
e. SDVOSB
f. WOSB


5. If significant subcontracting or teaming is anticipated in order to deliver technical capability, firms should address the structure of such arrangement include Joint Venture information, if applicable – existing and potential.


6. Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from the bonding company.
 


NOTES:
DO NOT SUBMIT A RESPONSE TO THIS SOURCES SOUGHT IF YOU DO NOT INTEND TO BID ON THIS PROJECT.
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.
SUBMISSION INSTRUCTIONS:



Interested parties who consider themselves qualified to perform the work associated with the subject requirement, are invited to submit a response to this Sources Sought Notice no later than November 09, 2026, at 10:00 AM, EST. All responses under this Sources Sought Notice shall be sent to Ms. Tedra Thompson via email at contact@example.gov and Mr. William Wallace via email at: contact@example.gov. 



Prior Government contract work is not required for submitting a response under this sources sought synopsis.


You must be registered in the System for Award Management (SAM), in order to be eligible to receive an award from any Government solicitation. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at +1 (555) 000-0000 for assistance.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor across the full 25-foot width, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. The project also encompasses the delivery of complete electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a set-aside for Disadvantaged Business Enterprises. Interested parties must coordinate with the primary point of contact, Andrew Burk, regarding the submission requirements.
Granite Construction Company

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for the Tampa Harbor Improvements project, specifically focusing on Contract 1. This notice is for preliminary planning purposes and serves as a save-the-date for an Industry Day event scheduled for November 18, 2026. The project is intended for a fiscal year 2028 award, with an estimated construction magnitude between $100 million and $500 million. Falling under NAICS code 237990 for Other Heavy and Civil Engineering Construction, the overall initiative is planned as a series of six contracts spanning an estimated 8 to 10 years. The scope of work for Contract 1 involves the dredging and widening of several key areas within the federal navigation channel of Tampa Harbor, including Cut-C, Cut-D, the Port Sutton Channel, Port Sutton Turning Basin, and the East Bay Channel. Specific deepening targets range from 41 to 49 feet MLLW, with an allowable overdepth of one foot. Approximately 4.4 million cubic yards of material will be dredged and disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. The government is seeking industry feedback on construction methods, sequencing, turbidity control, and potential stability or safety concerns regarding the placement areas to refine the project design and permitting before the official solicitation is issued.
Other Heavy and Civil Engineering Construction

POSTED

about 13 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
Federal
St. Lucie South Jetty Repair Industry Day
Solicitation # W912EP27Z1CUE
The U.S. Army Corps of Engineers, Jacksonville District, is conducting a preliminary planning phase for the St. Lucie South Jetty Rehabilitation project in Martin County, Florida. This is currently a special notice for an Industry Day event scheduled for December 7, 2026, and is not a formal solicitation for proposals. The project is planned for a fiscal year 2027 award under NAICS code 237990, with a price target range between 25 and 50 million dollars and an estimated period of performance of 730 calendar days. The scope of work involves rehabilitating the seaward-most 400 to 500 feet of the south jetty structure. Key activities include excavating bed material to place a widened marine mattress foundation, installing 9- to 15-ton toe protection and armor stones, and removing the existing asphalt walkway. The project requires strict adherence to environmental protections for Endangered Species Act listed species, including turtle deterrents and turbidity control measures. The government is seeking industry feedback on construction methodologies, equipment, and safety constraints, specifically regarding water-control measures like cofferdams and operational strategies for winter coastal conditions. Interested parties are invited to submit capabilities statements and responses to a technical questionnaire by December 4, 2026.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS