Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Kitchen Modernization Project At Beechwood School, Orangethorpe Elementary School, And Robert C. Fisler School

Open
FSD 2026-2027-BOND-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fullerton School District is soliciting proposals for a Kitchen Modernization Project across three sites: Beechwood School, Orangethorpe Elementary School, and Robert C. Fisler School. The project is structured as a Lease-Leaseback arrangement under California Education Code section 17406, with an estimated construction and equipment cost of $3,046,030.00. The anticipated lease period is twelve months, and the contractor is required to provide preliminary preconstruction services. Proposals must be submitted in PDF format to Mike McAdam by December 6, 2026, at 12:00 PM. Award selection is based on a best value score derived from a multi-step evaluation process focusing on the contractor's management expertise, strength, and proven track record of cost-efficient work. Key requirements include the provision of 100% performance and payment bonds, adherence to California prevailing wage laws, and compliance with ADA standards. The district emphasizes the use of local small businesses and has a 3% participation goal for Disabled Veteran Business Enterprises. Contractors must maintain strict confidentiality regarding student records and implement a comprehensive safety program, including an Injury and Illness Prevention Program. Final acceptance of the work is contingent upon a successful inspection by the Architect and Project Inspector, the completion of a punch list, and the verification of all life safety and mechanical systems.

General Info

Fullerton School District seeks proposals for a $3M multi-site kitchen modernization project.

Place of Performance

Fullerton, CA, 92833, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Due in 18 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 18 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fullerton School District
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #FSD 2026-2027-BOND-03: $2e

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility
Solicitation # PD 26-27.004
Solicitation PD 26-27.004 is an invitation to bid for the construction of a new, resilient Escambia County Area Transit (ECAT) facility in Pensacola, Florida. Funded by HUD Community Development Block Grant-Disaster Recovery (CDBG-DR) grants, the project aims to replace infrastructure damaged by Hurricane Sally and subsequent flooding. The scope of work is divided into multiple lots, including the construction of an Administration Building, a Maintenance Building, a Passenger Terminal Transfer Center with UL 752 Level 3 ballistic resistant ticket windows, a Bus Wash, and a Fuel Station. The new facility will be designed to Enhanced Hurricane Protection Area specifications to allow it to serve as an emergency shelter and will include a regional stormwater pond to mitigate local flooding. The contract will be awarded to the most responsive and responsible firm providing the lowest bid, primarily based on price. Bidders must comply with stringent federal and state requirements, including the Davis-Bacon Act for prevailing wages, HUD Section 3 guidelines for economic opportunities for low-income residents, and the Americans with Disabilities Act. Required submissions include a signed bid form, proof of active SAM registration, a Section 3 Project Implementation Plan, and performance and payment bonds. The response deadline for this solicitation is November 23, 2026, with all bids submitted through the County's e-procurement portal.
Purchasing

POSTED

about 2 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and ballasts. The project also requires repainting interior surfaces, installing new signage, and correcting plumbing deficiencies. This procurement is a Total Small Business Set-Aside under NAICS code 236220. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three equally weighted factors: Past Performance, Corporate Relevant Experience, and Price. The contractor must provide payment and performance bonds totaling 100% of the contract price and adhere to strict security and background check requirements, including FBI fingerprinting and DHS non-disclosure agreements. All work must comply with ADA/ABA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
Solicitation N4425527RB007 is an 8(a) Multiple Award Construction Contract (MACC) task order for a design-build project to repair fire sprinkler deficiencies at Building 290 and the adjoining Building 719 loading dock platform at Naval Base Kitsap, PSNS, in Bremerton, Washington. The contractor is responsible for final design documentation per FC 1-300-09N, labor, supervision, and all materials necessary to resolve critical hazards. Key deficiencies include a Risk Assessment Code Level 4 (RAC-4) deficiency regarding missing sprinklers at the loading dock, unmonitored and unlocked sprinkler control valves in basement elevator pits, and missing backflow preventers on wet pipe sprinkler system risers. Because Building 290 is on the historical register, any exterior modifications require approval from the State Historic Preservation Office (SHPO). The period of performance is 440 days from the award of the task order. Proposals are due by December 2, 2026, at 2:00 PM PST via the PIEE portal and will be evaluated based on price and MACC past performance. Required submissions include a cover letter, a completed schedule of prices, and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. The project mandates strict adherence to safety and technical standards, including EM 385-1-1, the International Plumbing Code, and UFC 3-420-01. Additionally, the contractor must provide a Quality Control Manager, a Site Safety and Health Officer, and comply with FAR 52.219-14 limitation of subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project has an estimated construction magnitude between $10 million and $25 million and involves the demolition and replacement of deteriorated components, the addition of a 400 square foot forklift battery charging area, and the installation of a prefabricated paint booth and new crane systems. A critical requirement of the project is a two-phase execution strategy that ensures the facility remains operational and mission-capable between phases, necessitating multiple mobilization and demobilization cycles. All design documents for both phases must be completed and approved during Phase 1. The project must comply with NAVFAC, UFC, and UFS criteria, as well as Puget Sound Clean Air Agency regulations. Technical requirements include the implementation of cybersecurity standards (ATO), JACE upgrades for UMCS continuity, and strict adherence to IBC, NFPA, and ASTM standards for secure space assemblies and acoustical testing. Proposals are to be submitted via the PIEE portal, with the basis of award being price only combined with MACC past performance. The contract requires the use of the Wide Area WorkFlow (WAWF) system for invoicing and mandates the provision of performance and payment bonds. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of Building 1963 LBJ at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks, missing shingles, and storm damage. The contract is a single lump sum award, with the selection based on best value rather than the lowest price. Evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is scheduled for December 3, 2026, and proposals are due by December 14, 2026. The successful contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and start work within 14 days. Requirements include a one-year workmanship guarantee, a two-year manufacturer's product warranty, and compliance with EPA, OSHA, and Indiana state and local building codes. Bidders must provide a valid Indiana Contractor's License, a W9, a completed vendor questionnaire, and proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Fullerton School District

Same awarding agency

NAICS: 236220
SLED
Gymnasium Replacement Project At Robert C. Fisler School
Solicitation # FSD 2026-2027-BOND-01
The Fullerton School District is soliciting proposals for the Gymnasium Replacement Project at Robert C. Fisler School in Fullerton, California. Utilizing a lease-leaseback delivery method, the project involves the construction of a new gymnasium and requires the contractor to provide comprehensive preconstruction and construction services, including general project management, constructability reviews, value engineering, budget refinement, and subcontractor procurement. The successful contractor must possess a Class B Contractors License and demonstrate extensive experience with public school facilities and compliance with OPSC, DTSC, and DSA regulations. Key requirements include adhering to a Community Workforce Agreement, prevailing wage laws, and the Americans with Disabilities Act, while maintaining a 3% participation goal for Disabled Veteran Business Enterprises. The selection process is based on a best value determination involving a multi-step evaluation: a pass/fail prequalification questionnaire, a proposal scoring phase with a minimum threshold of 750 points, optional interviews, and reference checks. Proposals must be submitted in PDF format to Mike McAdam by December 7, 2026, and should not exceed 50 pages. The contractor will be responsible for establishing a Guaranteed Project Cost and providing 100% performance and payment bonds upon award. All work must be executed according to DSA-approved plans, with final project acceptance granted only by the District's governing board.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 18 days
View Details
NAICS: 236220
SLED
Beechwood School Modulars Project
Solicitation # FSD 2026-2027-BOND-02
The Fullerton School District is seeking a qualified contractor for the Beechwood School Modulars Project, located in Fullerton, California. This project involves the addition of 16 modular buildings and the relocation of current portables, with an estimated construction cost of $12,000,000. The project will be executed using a lease-leaseback delivery method, requiring the contractor to provide preliminary services including value engineering, constructability reviews, and assistance with subcontractor procurement. Key requirements include adherence to prevailing wage laws, a Community Workforce Agreement, a 30% local resident hiring goal, and a 3% participation goal for Disabled Veteran Business Enterprises. Contractors must hold a Class B license and ensure MEP subcontractors hold appropriate C-class licenses. The selection process follows a best-value determination based on a multi-step scoring system consisting of a prequalification questionnaire, proposal evaluation, and optional interviews and reference checks. Proposals must be approximately 50 pages or fewer and include a letter of interest, executive summary, and evidence of experience with California K-12 districts over the last seven years. The contractor is responsible for providing a comprehensive safety plan, maintaining strict confidentiality of student records, and complying with CalOSHA and ADA standards. Deliverables include monthly as-built drawings, a four-week rolling schedule, and a logistics plan due within 30 days of the notice to proceed. Upon award, the contractor must furnish 100% performance and payment bonds.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS