Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Kost Road Improvements at UPRR Crossing Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Galt is proposing the Kost Road Improvements at UPRR Crossing Project to enhance safety and accessibility for all users, including vehicles, pedestrians, and cyclists, at the existing at-grade railroad crossing. The project aims to bring the crossing up to current standards by widening Kost Road within the Union Pacific Railroad right-of-way to accommodate Class II bicycle lanes and ADA-compliant pedestrian facilities, ensuring equitable access for individuals with disabilities and promoting multimodal transportation. These improvements are designed to reduce conflict points and increase overall mobility and safety in the area. The initiative is publicly forecasted with a posted date of June 16, 2026, and the place of performance is located in Galt, California, with a zip code of 95632. Betsy D Flores, Assistant Engineer with the City of Galt, serves as the primary point of contact and can be reached via email at bflores@cityofgalt.org or phone at 209-366-7295. Additional project details and documentation are available through the California Environmental Quality Act portal at the provided uiLink, though no solicitation number or set-aside information is currently specified.

General Info

Galt to improve Kost Road crossing with bike lanes, ADA access, and safety upgrades by June 2026.

Agency

California → City of Galt

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Kost Road between Joy Drive/Wilder Way and Maria Way, Galt, CA, 95632

Set-Aside

NONE

Documents

(2)

CEQA Categorical Exemption Justification Memorandum for Kost Road Improvements 20260610

PDFenvironmental-clearance-memo

Notice of Exemption for Kost Road Improvements at UPRR Crossing Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Galt
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Galt
Office AddressN/A
Contacts
Betsy D FloresAssistant Engineer

Full Description

Show more
The City of Galt proposes the Kost Road Improvements at UPRR Crossing Project to improve safety for all modes of travel (vehicle, pedestrian, and bicycle) through the existing at-grade railroad crossing and improve the crossing to current standards. The project would widen Kost Road within the UPRR right-of-way to provide Class II bicycle lanes and ADA-compliant pedestrian facilities.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS