The City of St. Joseph, Missouri is seeking sealed bids from qualified contractors for: Krug Pool Demolition Bid proposals must be submitted electronically through the City of St. Joseph's electronic bidding system as it helps to expedite the bidding process and alleviate errors. No paper, emailed, or faxed submissions will be accepted. A mandatory prebid conference will be held on January 27, 2026 at 11:00 a.m. at Krug Pool in St. Joseph, MO. The Work generally consists of construction of the demolition and removal of the existing pool at Krug Pool, including dirt work, grading, and seeding. Bid will be received on a Lump Sum basis. Bid security in the amount of Five Percent (5%) is required. The Successful Bidder will be required to furnish a Performance and Maintenance Bond and a Payment Bond on the forms set forth in the Contract Documents as security for the faithful performance of, and the payment of all bills and obligations arising from the performance of, the Contract. The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids, and to reject the Bid of any Bidder if the City believes that it would not be in the best interest of the City to make an award to that Bidder. The City also reserves the right to waive informalities. Bidders will be required to comply with the following requirements: Wage Rates Equal Opportunity in Employment All other applicable Laws and terms and conditions set forth in the General Conditions of the Contract for Construction Nondiscrimination in Employment. Bidders on this Work will be required to comply with the President’s Executive Order Number 11246. Requirements for Bidders and contractors under this order are explained in the Specifications. No Bid may be withdrawn within a period of Sixty (60) days after the date fixed for opening Bids. Safety Training Bidders are hereby informed that this project is subject to the requirements of R.S.Mo. 292.675, which requires all contractors or subcontractors doing work on the project to provide, and require its on-site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. All on-site employees must have the required OSHA training completed within 60 days of the date which work on the project commences. Any on-site employees found on the worksite without documentation of the required training shall have 20 days to produce such documentation. Special Needs : If you have special needs addressed by the Americans with Disabilities Act, please notify the City of St Joseph, Summer Deatherage at
+1 (555) 000-0000 or through Missouri Relay System, TDD
+1 (555) 000-0000, at least five (5) working days prior to the bid opening.