This Solicitation opportunity from Georgia was posted on February 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Clendenin Building Envelope Repairs - Addendum 1: Addendum 1 for Project No. 275-25-252 (Clendenin Building: North, South, West Building Envelope Repairs) at Kennesaw State University, dated March 5, 2025. This document provides a response to a Request for Information (RFI) clarifying that existing task order contractors must still submit a Statement of Qualifications and pricing per the RFQ instructions.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for Clendenin Building Envelope Repairs - Addendum 2: Addendum 2 for Project No. 275-25-252 regarding building envelope repairs for the North, South, and West buildings at Kennesaw State University. Dated April 9, 2025, it provides supplemental architectural drawings, structural reports from Epsten Group and Shear, and approved submittals to assist contractors in their review.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Clendenin North South and West Building Envelope Repairs - Supplementary Conditions: Dated April 2, 2025, this document outlines the Supplementary Conditions for project 275-25-252 at Kennesaw State University. It defines the roles of the Owner's Representative, project administration procedures, campus safety and smoking policies, pre-construction meeting requirements, security, bond requirements, and site-specific logistics including trash disposal and ID badging for long-term visitors.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Kennesaw State University - Clendenin Building Envelope Bid Requirements: Dated April 2, 2025, this document outlines the Bid Requirements and Instructions to Bidders for Project No. 275-25-252 (Clendenin North South and West Building Envelope) at Kennesaw State University. It specifies a lump sum contract basis, surety and insurance requirements, procedures for addenda and interpretations, and detailed rules regarding trade name substitutions and the approval process for substitute products.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kennesaw State University Clendenin Building Water Leakage Investigation Report: An investigation report dated September 6, 2023, prepared by Epsten Group, Inc. for Kennesaw State University. The document details a building enclosure investigation of the Clendenin Building to identify causes of water leakage. It includes visual observations, destructive and non-destructive testing (ELD roof scans, spray rack tests), a review of original 2001 architectural plans, and provides conclusions and recommendations for corrective actions regarding masonry veneer, curtain walls, and roofing systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kennesaw State University - Project No. 156 - Ann & John Clementin Building: Project documentation for the Ann & John Clementin Computer Science & Mathematics Building at Kennesaw State University, Project No. 156. The document appears to be a set of technical specifications or architectural plans for the facility in Kennesaw, Georgia.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Bailey Sports Complex - DW-10HS Veneer Anchors Submittal: A product submittal dated 9/9/24 for the KSU Bailey Sports Complex Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical specifications/drawings for DW-10HS Veneer Anchors manufactured by Hohmann & Barnard, Inc., detailing material standards (ASTM), dimensions, and installation recommendations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Bailey Sports Complex - Stucco Assembly Submittal: Submittal dated 9/23/24 for the KSU Bailey Sports Complex Envelope Repairs project. Submitted by FH Paschen, the document includes a submittal cover sheet and technical product data for Parex WeatherSeal Spray & Roll-On Waterproof Membrane & Air Barrier, detailing composition, application instructions, and coverage rates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Basecoat & Adhesive Submittal: A technical submittal dated 7/19/24 for the Kennesaw State University Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and detailed product data for Parex USA 121 Dry Basecoat & Adhesive, including ASTM test results, application instructions, and coverage specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Double-V Control Joint Submittal: A product submittal dated 7/19/24 for the KSU Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical product data for Clark Dietrich #15 Double-V Control Joints, including material specifications, ASTM compliance, and installation requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Expanded Corner Bead Submittal: A submittal package dated 7/19/24 for the KSU Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical product data for Clark Dietrich #1A Expanded Corner Bead, including material specifications (26 Gauge G-60 Galvanized Steel), ASTM compliance standards, and installation requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Expanded Flange Casing Bead Submittal: A product submittal dated 7/19/24 for the KSU Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical product data for Clark Dietrich #66X Expanded Flange Casing Beads, including material specifications, dimensions, and ASTM compliance standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Mesh Lath Submittal: A product submittal for Mesh Lath by Clark Dietrich for the KSU Clendenin Building Envelope Repairs project. Dated 7/19/24, the document includes a submittal cover sheet with architect/engineer review notes and detailed technical product data, including material specifications (G60 Galvanized Steel), sizing, and ASTM compliance standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Self Adhering Flashing Submittal: A technical submittal for the KSU Clendenin Building Envelope Repairs project, submitted by FH Paschen on 9/27/24 and approved by Olu Oshinubi (Epstein Group) on 09/30/24. The document includes a submittal cover sheet and technical data sheets for Textroflash Self Adhering Flashing manufactured by Hohmann & Barnard Inc., detailing material properties, tensile strength, and installation components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Tremco ExoAir 230 Submittal: A product submittal for the KSU Clendenin Building Envelope Repairs project, dated September 27, 2024. The document includes a submittal cover sheet from contractor FH Paschen and technical product data for Tremco ExoAir 230 Fluid-Applied Synthetic Permeable Air Barrier Membrane, detailing its uses, features, coverage rates, and applicable ASTM/NFPA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Veneer Anchor Plates Submittal: A submittal package dated September 27, 2024, for the Kennesaw State University Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical product data for Hohmann & Barnard Inc. HB-213-2X Adjustable Veneer Anchor Plates, detailing material conformance, load capacities, and installation specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Waterproof Membrane Submittal: Submittal cover sheet and product data sheet dated 7/19/24 for the KSU Clendenin Building Envelope Repairs project. The document specifies the use of Parex USA WeatherSeal Spray & Roll-On Waterproof Membrane & Air Barrier, including application instructions, coverage rates, and technical compliance (ASTM 2357, ASHRAE 90.1). Submitted by contractor FH Paschen.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - WeatherFlash Submittal: Submittal cover sheet and technical data sheet dated 7/19/24 for WeatherFlash Liquid Flashing & Joint Filler by Weather Tech (Parex USA, Inc.). The document is part of the KSU Clendenin Building Envelope Repairs project, submitted by contractor FH Paschen. It includes product descriptions, technical performance data (tensile strength, elongation, UV rating), and detailed installation instructions for use in exterior wall rough openings and joint filling.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Weather-Resistive Barrier Submittal: A submittal package dated 7/19/24 for the KSU Clendenin Building Envelope Repairs project. It includes a submittal cover sheet from contractor FH Paschen for a Henry Jumbo Tex Weather-Resistive Barrier, along with the manufacturer's technical data sheet detailing performance standards, ASTM compliance, and installation guidelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Envelope Repairs - Weep Holes/Vents Submittal: A product submittal for Weep Holes/Vents (Quadro-Vent) by Hohmann & Barnard Inc. for the KSU Clendenin Building Envelope Repairs project. Includes a submittal cover sheet dated 9/27/24, approved by the architect on 09/30/24, and technical product data sheets specifying materials and dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Structural Assessment Report: A structural conditions assessment report dated October 25, 2024, prepared by Shear Structural, LLC for Kennesaw State University. The document details a visual inspection of the brick façade support at the Clendenin Building, identifying structural deficiencies, foundation wall cracks, and installation errors with brick relief angles. It provides specific remediation recommendations for the east, south, and north elevations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for KSU Clendenin Building Structural Assessment Report: A structural conditions assessment report dated August 7, 2024, prepared by Shear Structural, LLC for Kennesaw State University. The document details a visual inspection of the brick façade support at the south end of the east building elevation of the Clendenin Building. It identifies critical structural deficiencies in the steel angle hangers and lintels, noting poor weld quality and missing kickers, and recommends substantial rebuild, reinforcement, or replacement of the support system.
DOC
DOC, High priority: read this firstrfq
HighAI Summary for KSU Clendenin North South and West Building Envelope Repairs Project Manual: Project manual and solicitation package dated April 2, 2025, for Kennesaw State University (Project No. 275-25-252). The scope involves removing and replacing brick cladding, waterproofing, and repairing structural deficiencies on the North, South, and West facades of the Clendenin Building. The document includes bid requirements, general conditions, a sample contract, and technical specifications.
DOC
DOC, High priority: read this firstrfq
HighAI Summary for KSU Project No. 275-25-252 Clendenin Building Envelope Repairs RFQ: Kennesaw State University is soliciting Statements of Qualifications (Step I) from General Contractors for Project No. 275-25-252, involving building envelope repairs (brick removal and replacement) for the Clendenin North, South, and West facades. The stated cost limitation is $1,600,000. Qualifications packages are due by March 26, 2025. Qualified firms will be invited to submit competitive sealed bids (Step II).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PE-54300-RFQC-2025-000000063 General Notes and Specifications: Technical supporting documentation for solicitation PE-54300-RFQC-2025-000000063, containing general notes for the general contractor regarding field verification of dimensions, structural inspections, and adherence to the scope of work narrative and supplemental project manual technical specifications for repair design.
PDF
PDF, Low prioritysubmittal
LowAI Summary for KSU Clendenin Building Envelope Repairs - Aluminum Termination Bar Submittal: A product submittal dated September 27, 2024, for the Kennesaw State University Clendenin Building Envelope Repairs project. The document includes a cover sheet from contractor FH Paschen and technical specifications for a T2 Aluminum Termination Bar manufactured by Hohmann & Barnard Inc., which was reviewed and approved by architect Olu Oshinubi on September 26, 2024.
PDF
PDF, Low prioritysubmittal
LowAI Summary for KSU Clendenin Building Envelope Repairs - Multipurpose Sealant Submittal: A submittal package dated September 27, 2024, for the Kennesaw State University Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical product data for HB SEALANT by Hohmann & Barnard Inc., detailing its properties, ASTM compliance, and application guidelines.
PDF
PDF, Low prioritysubmittal
LowAI Summary for KSU Clendenin Building Envelope Repairs - Preblended Stucco Submittal: A product submittal dated 7/19/24 for the KSU Clendenin Building Envelope Repairs project. The document includes a submittal cover sheet from contractor FH Paschen and technical data sheets for SPEC MIX Scratch and Brown Preblended Stucco, detailing installation, mixing instructions, and estimated yields.
PDF
PDF, Low priorityfield-observation-report
LowAI Summary for KSU Clendenin Building Field Observation Report No. 1: Field Observation Report dated 10.28.2024 by Bethany Jones, PE, regarding structural repairs at the KSU Clendenin Building. The report documents deficiencies in completed structural repairs observed on 10.15.2024, including improper welding of brick support angles, lack of vertical slotted holes for differential movement, and missing shop drawing submissions.
PDF
PDF, Low priorityfield-report
LowAI Summary for KSU Clendenin Building Repair - Daily Field Report DFRN-000001: Daily Field Report dated 11/05/2024 regarding structural steel observations and testing for the KSU Clendenin Building Repair project. The document details inspections of field welds and anchor bolts, noting several discrepancies. It includes a structural review from Shear Structural dated 11/06/2024, which accepts some discrepancies while requiring corrections for anchor bolt diameters and the removal of washers/tack welds to allow for differential movement.
Response deadline changed from Mar 26, 2025 to May 22, 2025. Solicitation number changed from 54300 KENNESAW PE-54300-RFQC-2025-000000063 to PE-54300-RFQC-2025-000000063. The notice description changed.
Notice updated
Response deadline changed from May 22, 2025 to Mar 26, 2025. The notice description changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The Board of Regents of the University System of Georgia by and on behalf of Kennesaw State University, is seeking Statements of Qualifications from qualified firms who will provide design-bid-build services and, at a minimum, will employ the services of a Design Professional and a Commissioning Agent in addition to the services of the General Contractor.
Questions relating to the RFQ must be submitted in writing via e¿mail to Emmanuel Bertrand, Senior Construction Project Manager at •••••@•••••.•••Sign up to see this detail
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award