Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on December 5, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--L-31North Seepage Management Pilot Project

Closed
W912EP08Z0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor across the full 25-foot width, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. The project also encompasses the delivery of complete electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a set-aside for Disadvantaged Business Enterprises. Interested parties must coordinate with the primary point of contact, Andrew Burk, regarding the submission requirements.
Granite Construction Company

POSTED

about 5 hours ago

DEADLINE

in 2 days
NAICS: 237990
New
SLED
2027 CUPCCAA Notice for Ventura County Community College District
Solicitation # 20261102075
The Ventura County Community College District is issuing a public notice to establish its Bidders List for the 2027 calendar year in accordance with the California Uniform Public Construction Cost Accounting Act (CUPCCAA). This solicitation, identified by number 20261102075, is not for a specific project award but is a registration process to determine eligibility for informal bidding procedures on public projects. The registration is open to all licensed contractors who are registered with the State of California Department of Industrial Relations. Interested parties must complete an online application via www.qualitybidders.com by the response deadline of November 3, 2027. To be eligible, contractors must provide their firm details, contact information, a valid DIR number, and specific license classifications and numbers, which are subject to verification by the Contractors State License Board. The district utilizes CUPCCAA to implement tiered bidding procedures based on project value: projects of 75,000 dollars or less may be handled via negotiated contracts or purchase orders, projects up to 220,000 dollars may use informal bidding, and projects exceeding 220,000 dollars require formal bidding procedures. The primary point of contact for this registration process is Dustin Ferguson.
Ventura County Community College District

POSTED

about 5 hours ago

DEADLINE

in 12 months

AI Contract Overview

Show more

The contract pertains to the L-31 North (L-30) Seepage Management Pilot Project aimed at evaluating and improving seepage management technologies to control groundwater flow and levee seepage from Everglades National Park. The project is located in Miami-Dade County, specifically along a 1.25-mile segment of the L-30 Canal between water control structures S-335 and S-334, an area known for its high seepage rates. The core of the project involves designing, installing, and testing a subsurface seepage barrier composed of a soil-cement-bentonite (SCB) slurry wall supplemented by sheet pile sections and seepage recovery wells. This barrier is expected to be 80 to 100 feet deep and extend roughly 1,000 to 2,200 feet in length. The sheet pile section will feature a 100-foot long shallow "window" to direct seepage flow, which will then be captured and pumped to local water conservation areas or canals. Installation will require advanced excavation techniques due to challenging limestone geology, and measures such as grouting may be needed to seal any gaps in the sheet piling. Construction will involve pre-blasting a 6-foot wide zone for the trench into which the SCB slurry wall will be installed, followed by backfilling with a bentonite-cement mix. The contract anticipates requiring approximately 1 acre for construction staging and 3-4 acres for heavy equipment, with site access from major local highways. Post-construction testing will span two years to assess the barrier’s effectiveness across varying seasonal conditions. The total construction magnitude is estimated between $5 million and $10 million, with award decisions based on best value considering technical merit, past performance, and price. Interested contractors must be registered with federal systems such as the Central Contractor Registration and the Online Representations and Certifications Application to be eligible for award. Draft plans are currently available for informational review only, with official solicitations expected to be issued in early 2009.

General Info

L-31 North seepage barrier project in Miami-Dade uses SCB slurry wall, sheet piles, and wells.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

US Army Engineer District, Jacksonville P.O. Box 4970, Jacksonville FL 32232-0019 US, FL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseClosed
Posted

special-notice

Notice updated

The notice title changed. The notice description changed.

Notice updated

Notice type changed from Special Notice to Presolicitation. Response deadline added: Dec 4, 2008. The notice title changed. The notice description changed.

Notice updated

Notice type changed from Presolicitation to Special Notice. Response deadline changed from Dec 4, 2008 to Mar 21, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
THIS IS FOR INFORMATION PURPOSES ONLY. DO NOT REGISTER FOR PLANS AND SPECIFICATIONS AT THIS TIME. THE DRAFT PLANS (30% AND 60%) are AVAILABLE FOR REVIEW ON OUR WEBSITE (see instructions below). The Government may consider comments and inquiries while preparing the final plans and specs; however, the Government is not seeking comments and may not provide responses to inquiries. A solicitation will be issued on or about the 21 January 2009 with proposals due on or about 21 March 2009. The purpose of the L-31 North (L-30) Seepage Management Pilot Project (SMPP) is to identify, test, and determine the relative effectiveness of seepage management technologies in order to recommend features to control groundwater flow and levee seepage from Everglades National Park. Additionally, the project will help determine the constructability of a seepage management barrier to various depths/lengths within the semi-confining unit of the aquifer and may also yield results beneficial to the implementation of the full-scale Everglades National Park Seepage Management Project. The proposed project is located in Miami-Dade County, north of Tamiami Trail (U.S. Highway 41) and Krome Ave (Route 997). The L-30 borrow canal and levee mainly runs north-south but makes roughly a 45-degree southwesterly departure from Krome Avenue until it intersects Tamiami Trail, thereby forming what is commonly known as the L-30 triangle. This 1.25 mile segment of the L-30 Canal, between S-335 and S-334, has been found to be an extremely thick portion of the Biscayne Aquifer with very high measured transmissivity. A field drawdown test performed as a part of the L-31N SMPP and a Preliminary Seepage Report based on historical data for the area both found the triangle to have the highest seepage rate per mile between S-335 and S-334. Conceptual Design - The tentatively selected alternative will include the design, installation, and testing of a subsurface seepage management barrier augmented with collection pipes and seepage recovery wells located within the barrier, adjacent to a sheet pile window in the L-30 levee located north of US Highway 41 (Tamiami Trail) between water control structures S-335 and S-336. The barrier will have dimensions of approximately 80100 feet in depth and approximately 1,0002,200 feet in length. The selected alternative proposes the placement of a barrier feature using a soil-cement-bentonite (SCB) mix and sheetpile construction technique. The seepage barriers exact length and depth will be determined using detailed field data, engineering expertise from technical team members, and the A-E contractor. It is anticipated that installation of the seepage barrier through the geologic layers in the project area will be hard limestone may prove difficult, and will most likely require creative engineering techniques for excavating. This design proposes a SCB slurry wall with a 6 ft. wide trench. A 100-ft long shallow sheet pile wall section is proposed as a gap in the slurry wall that will act as a shallow window to direct any desired seepage flow. During periods of high water flow in the aquifer, seepage flows passing through the window will be captured by the system of wells and pumps. Wells and pumps will be installed to capture the desired quantity of flow and pump it into the Water Conservation Area 3B as surface water or into adjacent canals. The pumping system design will allow for the pumps to be controlled locally as well as from a remote location using telemetry. Flow measurement devices will be installed at the ends and at the mid-point of the barrier. An approximate 10-ft by 10-ft control building will be required to house electrical controls and panels at the mid-point of the barrier. It is anticipated that the sheet pile depth can also be adjusted to create varying window size as needed. Preliminary design concept places the sheet pile at a depth of approximately 50 ft. General Construction - The following engineering features are conceptual in nature and may or may not represent the final design of this project. Soil-Cement Bentonite Slurry Wall - The Soil-Cement-Bentonite (SCB) slurry wall will be placed in a 3-ft wide trench cut out of a 6 ft. wide pre-blasted zone. By possibly pre-blasting this zone the properties of the porous limestone will change to a zone containing less permeable materials. The trench is to be excavated through the pre-blasted zone of limestone down to a pre-established invert elevation with a base in the less permeable Tamiami Sands. Typically soil-cement-bentonite (SCB) walls are 24 to 30 inches wide and match the width of the equipment. In this case the blasted zone is anticipated to be approximately six (6) feet wide which allows for ~30 inch trench centered within the blasted lower permeability zone leaving lower permeability material on both sides of the trench. It is reasoned that the engineered filter will enable the wall to be constructed using conventional excavating equipment (e.g., extended stick backhoe or similar) is probable, while minimizing loss of the bentonite slurry mixture. After the six feet wide trench has been blasted, the 30-inch trench will be excavated. As the excavation proceeds, bentonite-water slurry is continuously added to build a filter pack and ensure that the trench remains open. After the blasted material has been excavated, it is replaced with a backfilled mixture of soil-cement-bentonite. The preliminary mix design assumes 10 to 15% cement and 2 to 5% bentonite mixed with the excavated rock materials. Sheet Pile Wall - A sheet pile wall will be constructed at the midsection of the slurry wall. This 100 ft long shallow sheet pile wall will be inserted to bridge the gap between the 2 sections of slurry wall to act as a shallow window directing or funneling any seepage flow. The pumps could be possibly used to divert excess seepage. The sheet pile depth of emplacement and size may be varied or later changed to create a window of varying size depending on need. The method of installation may require a creative exaction technique (ex. Blasting through limestone layers), followed by pile driving to a pre-established invert elevation by hammer or vibratory methods. There is likely to be some disturbance surrounding the piles so there is possible need for seepage tightening of the wall by grouting or other sealing methods. This seepage tightening will seal any holes or gaps in between individual piles that remain after installation would be plugged. Disposal - All unsuitable material will be disposed of within the L-31N right-of-way. Cleared, grubbed and excavated materials that are suitable for reuse may be stockpiled on site for grading and erosion control of the embankment. Staging - It is anticipated that the A-E contractor will need approximately 1 acre for staging construction trailers and 3-4 acres for the staging heavy construction equipment. Access to the project site could be from State Rd 997 (Krome Ave.) and/or from U.S. Highway 41 (Tamiami Trail) by S-334 or S-356. As a first option, the team would like to the contractor to use the area is within the L-31N right-of way located along L-31N (south bank), beginning 0.5 mile south of the north gate at U.S. Highway 41, then southward about 0.25 mile. The second option, the staging are would be located on the L-29 (north bank & levee), between S-334 and the south entrance of the L 30 levee. Testing - After construction is completed, testing of the barrier system will be performed within a period of two years (two wet and two dry seasons) to determine the relative effectiveness of the seepage barrier. The proposed work is located in Miami-Dade County, North of Tamiami Trail (US Highway 41) and Krome Avenue (Route 997). The Magnitude of Construction is between $5,000,000.00 to $10,000,000.00. Award will be made to the offeror whose proposal represents the best value to the Government. Proposals will be evaluated on technical, past performance and price. The draft plans (30%) are available on the Federal Business Opportunities website at http://www.fedbizopps.gov/. REMEMBER: DO NOT REGISTER AS A PLAN HOLDER AT THIS TIME. THE FINAL PLANS AND SPECIFICATIONS WILL CARRY A DIFFERENT IDENTIFICATION NUMBER AND REGISTRATION WILL BE REQUIRED AT THAT TIME. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from any Government solicitation. Call +1 (555) 000-0000 for more information or visit the CCR website at http://www.ccr.gov. You must be registered in the Online Representations and Certifications Application (ORCA) in order to be eligible to receive an award from any Government solicitation. For more information, visit the ORCA website at http://www.bpn.gov. NAICS Code is 237990 and the Small Business size standard is $31 million.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for the Tampa Harbor Improvements project, specifically focusing on Contract 1. This notice is for preliminary planning purposes and serves as a save-the-date for an Industry Day event scheduled for November 18, 2026. The project is intended for a fiscal year 2028 award, with an estimated construction magnitude between $100 million and $500 million. Falling under NAICS code 237990 for Other Heavy and Civil Engineering Construction, the overall initiative is planned as a series of six contracts spanning an estimated 8 to 10 years. The scope of work for Contract 1 involves the dredging and widening of several key areas within the federal navigation channel of Tampa Harbor, including Cut-C, Cut-D, the Port Sutton Channel, Port Sutton Turning Basin, and the East Bay Channel. Specific deepening targets range from 41 to 49 feet MLLW, with an allowable overdepth of one foot. Approximately 4.4 million cubic yards of material will be dredged and disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. The government is seeking industry feedback on construction methods, sequencing, turbidity control, and potential stability or safety concerns regarding the placement areas to refine the project design and permitting before the official solicitation is issued.
Other Heavy and Civil Engineering Construction

POSTED

about 16 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
Federal
Kissimmee River Restoration (KRR) Project, S-69 Weir Repair
Solicitation # W912EP27Z1CVL
The South Atlantic Jacksonville District of the U.S. Army Corps of Engineers is conducting a sources sought synopsis for the Kissimmee River Restoration Project, specifically focusing on the repair of the S-69 weir structure located in Okeechobee and Highlands Counties, Florida. This potential fiscal year 2027 project aims to restore floodplain hydrology by repairing the weir's concrete cap and ancillary driving slab. The scope of work includes partial demolition of the concrete cap at 29 expansion joints, blast cleaning of steel components, welding new anchor studs, and installing epoxy-coated stirrups. Additionally, the contractor will be required to perform subsurface void investigations via core drilling and remediate gaps between the slab and sheet piles using controlled low-strength material or approved flowable fill. The project is anticipated to be awarded as a Firm Fixed Price contract with a rough order of magnitude between 500,000 and 1,000,000 dollars. The expected period of performance is 90 calendar days from the notice to proceed. All work must adhere to strict ASTM standards for steel, fasteners, and hardware, with quality control monitored by both the contractor and government personnel. This announcement is for preliminary planning purposes to gauge industry interest and capabilities under NAICS code 237990. Interested parties must be registered in the System for Award Management and submit their qualifications and bonding capacity by November 9, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
St. Lucie South Jetty Repair Industry Day
Solicitation # W912EP27Z1CUE
The U.S. Army Corps of Engineers, Jacksonville District, is conducting a preliminary planning phase for the St. Lucie South Jetty Rehabilitation project in Martin County, Florida. This is currently a special notice for an Industry Day event scheduled for December 7, 2026, and is not a formal solicitation for proposals. The project is planned for a fiscal year 2027 award under NAICS code 237990, with a price target range between 25 and 50 million dollars and an estimated period of performance of 730 calendar days. The scope of work involves rehabilitating the seaward-most 400 to 500 feet of the south jetty structure. Key activities include excavating bed material to place a widened marine mattress foundation, installing 9- to 15-ton toe protection and armor stones, and removing the existing asphalt walkway. The project requires strict adherence to environmental protections for Endangered Species Act listed species, including turtle deterrents and turbidity control measures. The government is seeking industry feedback on construction methodologies, equipment, and safety constraints, specifically regarding water-control measures like cofferdams and operational strategies for winter coastal conditions. Interested parties are invited to submit capabilities statements and responses to a technical questionnaire by December 4, 2026.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS